IP Library Granted Patent US 12665658
Granted Patent B2
US 12665658 · App. 18/253,232 · Granted Jun 23, 2026

Communication device, communication method, base station, and method performed by base station

Inventors: Naoki Kusashima (Tokyo, JP); Hiromasa Uchiyama (Tokyo, JP); Hiroki Matsuda (Tokyo, JP)
Assignee: SONY GROUP CORPORATION
H04B7/15528H04W16/26H04W16/28H04W72/0453
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12665658
App. No.
18/253,232
Granted
Jun 23, 2026
Kind
B2
Abstract

A communication device includes a reception unit that receives, from the base station, a physical control signal used to control a physical layer of the communication device, the physical control signal including beam information about a beam used for communication between the communication device and the terminal device; and a communication control unit that controls a beam used for communication between the communication device and the terminal device based on the beam information.

Claims (86)

1 . A communication device to relay communication between a base station and a terminal device, the communication device comprising:

a reception unit configured to receive a first physical control signal from the base station, wherein

the first physical control signal is to control a physical layer of the communication device, and

the first physical control signal includes beam setting information to set a beam for communication between the communication device and the terminal device;

an identification unit configured to identify, as an application duration for application of the beam setting information, a first duration based on a transmission timing of the first physical control signal, wherein

the first duration is from a first time to a Physical Downlink Control Channel (PDCCH) monitoring occasion associated with a second physical control signal,

the second physical control signal includes beam setting information to set a next beam for the communication between the communication device and the terminal device, and

the first time is after a specific offset duration subsequent to the reception of the first physical control signal; and

a communication control unit configured to control the beam based on the beam setting information of the first physical control signal and the application duration.

2 . The communication device according to claim 1 , wherein

the beam setting information of the first physical control signal includes at least one of first information associated with a downlink beam or second information associated with an uplink beam,

the uplink beam is from the terminal device to the communication device, and

the downlink beam is from the communication device to the terminal device.

3 . The communication device according to claim 2 , wherein the first information includes at least one of

information associated with a Spatial Transmitter characteristic of the communication device, or

information that specifies at least one of a Transmission Configuration Indication (TCI), a Synchronization Signal (SS)/Physical Broadcast Channel (PBCH) block index, a Non-Zero-Power (NZP) Channel State Information-Reference Signal (CSI-RS) resource ID, an antenna port for a downlink reference signal, or the terminal device.

4 . The communication device according to claim 2 , wherein the second information includes

information associated with a Spatial Receiver characteristic of the communication device, and

information that specifies a Sounding Reference Signal (SRS) resource indicator (SRI) or the terminal device.

5 . The communication device according to claim 2 , wherein

the beam setting information of the first physical control signal further includes third information that indicates the application duration, and

the identification of the first duration is further based on the third information.

6 . The communication device according to claim 5 , wherein the third information includes information that specifies at least one of one or more consecutive slots or one or more consecutive symbols.

7 . The communication device according to claim 5 , wherein

the third information includes information that specifies a second duration where a physical channel is allocated, and

the physical channel includes at least one of transfer information for the base station or transfer information for the terminal device.

8 . The communication device according to claim 7 , wherein

the second duration includes at least one of

a third duration where a PDCCH and a Physical Downlink Shared Channel (PDSCH), which are transferrable to an access link, are allocated, or

a fourth duration where a Physical Uplink Control Channel (PUCCH) or a Physical Uplink Shared Channel (PUSCH) is allocated,

the PUCCH or the PUSCH includes a Hybrid Automatic Repeat reQuest Acknowledgment (HARQ-ACK) corresponding to the PDSCH, and

the access link is between the communication device and the terminal device.

9 . The communication device according to claim 7 , wherein the second duration includes

a third duration where a PDCCH, which is transferrable to the access link, is allocated, and

a fourth duration where a Physical Uplink Shared Channel (PUSCH) is allocated.

10 . The communication device according to claim 1 , wherein the identification unit is further configured to identify the application duration based on a timer.

11 . The communication device according to claim 1 , wherein

the identification unit is further configured to identify, as the application duration, a second duration,

the second duration is from the first time to a second time, and

the second time is after reception of the second physical control signal.

12 . The communication device according to claim 1 , wherein the identification unit is further configured to identify, as the application duration, a second duration from the first time.

13 . The communication device according to claim 1 , wherein

the reception unit is further configured to receive information that indicates a relay timing, and

the communication control unit is further configured to:

identify a timing based on the received information; and

relay information at the identified timing.

14 . The communication device according to claim 1 , wherein

the first physical control signal further includes information associated with a downlink transmission power, and

the communication control unit is further configured to control the downlink transmission power based on the information associated with the downlink transmission power.

15 . A communication method, the communication method comprising:

in a communication device that relays communication between a base station and a terminal device:

receiving, from the base station, a first physical control signal, wherein

the first physical control signal is to control a physical layer of the communication device, and

the first physical control signal includes beam setting information to set a beam for communication between the communication device and the terminal device;

identifying, as an application duration for application of the beam setting information, a specific duration based on a transmission timing of the first physical control signal, wherein

the specific duration is from a specific time to a Physical Downlink Control Channel (PDCCH) monitoring occasion associated with a second physical control signal,

the second physical control signal includes beam setting information to set a next beam for the communication between the communication device and the terminal device, and

the specific time is after a specific offset duration subsequent to the reception of the first physical control signal; and

controlling the beam based on the beam setting information of the first physical control signal and the application duration.

16 . A base station, comprising:

a transmission unit; and

a control unit configured to;

transmit, via the transmission unit, a first physical control signal to a communication device, wherein

the first physical control signal is for control of a physical layer of the communication device,

the first physical control signal includes beam setting information to set a beam for communication between the communication device and a terminal device,

the communication device identifies, as an application duration for application of the beam setting information, a specific duration based on a transmission timing of the first physical control signal,

the specific duration is from a specific time to a Physical Downlink Control Channel (PDCCH) monitoring occasion associated with a second physical control signal,

the second physical control signal includes beam setting information to set a next beam for the communication between the communication device and the terminal device, and

the specific time is after a specific offset duration subsequent to the reception of the first physical control signal; and

execute communication with the terminal device via the communication device, wherein

the execution of the communication with the terminal device is via the transmission unit, and

the communication device:

controls the beam based on the beam setting information of the first physical control signal and the application duration, and

relays, based on the control of the beam, communication between the base station and the terminal device.

17 . A method, comprising:

in a base station:

transmitting a first physical control signal to a communication device, wherein

the first physical control signal is for control of a physical layer of the communication device,

the first physical control signal includes beam setting information to set a beam for communication between the communication device and a terminal device,

the communication device identifies, as an application duration for application of the beam setting information, a specific duration based on a transmission timing of the first physical control signal,

the specific duration is from a specific time to a Physical Downlink Control Channel (PDCCH) monitoring occasion associated with a second physical control signal,

the second physical control signal includes beam setting information to set a next beam for the communication between the communication device and the terminal device, and

the specific time is after a specific offset duration subsequent to the reception of the first physical control signal; and

executing communication with the terminal device via the communication device, wherein the communication device:

controls the beam based on the beam setting information of the first physical control signal and the application duration, and

relays, based on the control of the beam, communication between the base station and the terminal device.