IP Library Granted Patent US 12691783
Granted Patent B2
US 12691783 · App. 18/334,750 · Granted Jul 28, 2026

Management device

Inventor: Takaaki Sano (Izumi, JP)
Assignee: TOYOTA JIDOSHA KABUSHIKI KAISHA
B60L55/00B60L58/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12691783
App. No.
18/334,750
Granted
Jul 28, 2026
Kind
B2
Abstract

A server executes: a classification process of classifying each of a plurality of power resources into a first resource and a second resource with a capacity of the power storage device larger than the capacity of the power storage device of the first resource; and a resource selection process of selecting, from among the power resources, an adjustment resource of which participation in the power adjustment is requested. The resource selection process includes a first selection process of preferentially selecting the second resource as the adjustment resource over the first resource when a power adjustment request is a first request, and a second selection process of preferentially selecting the first resource as the adjustment resource over the second resource when the power adjustment request is a second request. A power adjustment amount of the first request is larger than a power adjustment amount of the second request.

Claims (23)

1 . A management device that manages a plurality of power resources, wherein: each of the power resources is equipped with a power storage device and is configured to be able to participate in power adjustment in a power grid by discharging power of the power storage device to the power grid; the management device includes a communication unit configured to communicate with each of the power resources, and a processing unit; the processing unit executes a classification process of classifying each of the power resources into a first resource and a second resource with a capacity of the power storage device larger than the capacity of the power storage device of the first resource, and a resource selection process of selecting, from among the power resources, an adjustment resource of which participation in the power adjustment is requested through the communication unit, in response to an adjustment request requesting implementation of the power adjustment; the resource selection process includes a first selection process of preferentially selecting the second resource as the adjustment resource over the first resource when the adjustment request is a first request, and a second selection process of preferentially selecting the first resource as the adjustment resource over the second resource when the adjustment request is a second request; a power adjustment amount of the first request is larger than a power adjustment amount of the second request; the first request is the adjustment request different from the second request; and the second request is the adjustment request for eliminating imbalance that is the difference between a power demand amount and a power supply amount in the power grid; wherein: the processing unit is configured to trade in a power market an adjustment capability for implementing the power adjustment and to generate the adjustment request when the adjustment capability is successfully bid in the power market; the adjustment capability is traded in frame units in the power market; and the processing unit generates the first request when the adjustment capability having the number of frames larger than a predetermined number of frames is successfully bid, and generates the second request when the adjustment capability having the number of frames equal to or less than the predetermined number of frames is successfully bid.

2 . The management device according to claim 1 , wherein a power adjustment period of the first request is longer than a power adjustment period of the second request.

3 . The management device according to claim 1 , wherein:

a length of the frame is 30 minutes; and

the predetermined number of frames is one.

4 . The management device according to claim 1 , wherein:

the first resource is a resource in which discharge power of the power storage device is equal to or less than a threshold discharge power;

the second resource is a resource in which the discharge power is larger than the threshold discharge power; and

the threshold discharge power is 2 kW or more and 5 kW or less.

5 . The management device according to claim 4 , wherein:

when the adjustment request is the first request, the processing unit

selects at least one second resource such that a total discharge power of the at least one second resource selected in the first selection process approaches the power adjustment amount of the adjustment request, and

selects at least one first resource to meet a shortage of a first total discharge power with respect to the power adjustment amount of the adjustment request, in a case where the first total discharge power that is the total discharge power of all of the second resources does not reach the power adjustment amount of the adjustment request even when all of the second resources are selected; and

when the adjustment request is the second request, the processing unit

selects at least one first resource such that a total discharge power of the at least one first resource selected in the second selection process approaches the power adjustment amount of the adjustment request, and

selects at least one second resource to meet a shortage of a second total discharge power with respect to the power adjustment amount of the adjustment request, in a case where the second total discharge power that is the total discharge power of all of the first resources does not reach the power adjustment amount of the adjustment request even when all of the first resources are selected.

6 . The management device according to claim 1 , wherein the power resources include a vehicle electrically connected to the power grid via power equipment.

7 . The management device according to claim 6 , wherein:

the power resources include power storage equipment in which the power storage device is a stationary power storage device;

the processing unit

preferentially selects the power storage equipment as the adjustment resource over the vehicle when implementing the power adjustment in a first time zone, and

preferentially selects the vehicle as the adjustment resource over the power storage equipment when implementing the power adjustment in a second time zone; and

the first time zone is set as a time zone in which a user of the vehicle is more likely to use the vehicle than in the second time zone.