Control system for building equipment with secondary strong prevention

Inventors: Jared Fread (Milwaukee, WI); Ryan C. Beaty (Milwaukee, WI); Shawn A. Schlagenhaft (Fon du Lac, WI); Graeme Willmott (West Milwaukee, WI)
Assignee: TYCO FIRE & SECURITY GMBH
F24D19/1048F24D19/1006F24H1/225F24H9/14F25B29/00G05D7/0623G05D23/1923
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12704268
App. No.
18/512,525
Granted
Aug 11, 2026
Kind
B2
Abstract

A system for controlling building equipment includes building equipment configured to output a resource having a measurable characteristic, a sensor configured obtain a measurement of the measurable characteristic, and a control system. The control system is configured to calculate an additional load factor based on the measurement of the measurable characteristic and a setpoint for the measurable characteristic, obtain an actual load for the building equipment, calculate an effective load based on the additional load factor and the actual load, generate load allocations for the building equipment based on the effective load, and control the building equipment to operate in accordance with the load allocations.

Claims (58)

1 . A system for controlling building equipment, comprising:

building equipment configured to output a resource having a measurable characteristic;

a sensor configured obtain a measurement of the measurable characteristic; and

a control system configured to:

calculate an additional load factor based on the measurement of the measurable characteristic and a setpoint for the measurable characteristic;

obtain an actual load for the building equipment;

calculate an effective load based on the additional load factor and the actual load;

generate load allocations for the building equipment based on the effective load; and

control the building equipment to operate in accordance with the load allocations.

2 . The system of claim 1 , wherein the additional load factor is positive when the measurable characteristic deviates from the setpoint for the measurable characteristic.

3 . The system of claim 1 , wherein the control system is configured to calculate the additional load factor by:

setting the additional load factor to zero in response to the measurement of the measurable characteristic being greater than or equal to the setpoint for the measurable characteristic; and

setting the additional load factor to a non-zero value when the measurement of the measurable characteristic is less than a sum of the setpoint for the measurable characteristic and an offset.

4 . The system of claim 1 , wherein, when the additional load factor is non-zero, the additional load factor comprises a scaling factor multiplied by a difference between the measurement of the measurable characteristic and a sum of the setpoint for the measurable characteristic and an offset.

5 . The system of claim 1 , wherein the control system is configured to generate the load allocations based on the effective load by:

generating a predicted load based on the effective load; and

allocating the predicted load amongst a plurality of devices of the building equipment.

6 . The system of claim 1 , wherein the additional load factor causes the control system to generate the load allocations for the building equipment by increasing a first load allocated to a first device of the building equipment to compensate for a failure of a second device of the building equipment to meet a second load allocated to the second device of the building equipment.

7 . A method for controlling building equipment, the method comprising:

operating building equipment to output a resource having a measurable characteristic;

obtaining a measurement of the measurable characteristic;

calculating an additional load factor based on the measurement of the measurable characteristic and a setpoint for the measurable characteristic;

obtaining an actual load for the building equipment;

calculating an effective load based on the additional load factor and the actual load;

generating load allocations for the building equipment based on the effective load; and

controlling the building equipment in accordance with the load allocations.

8 . The method of claim 7 , wherein the additional load factor is positive when the measurable characteristic deviates from the setpoint for the measurable characteristic.

9 . The method of claim 7 , wherein calculating the additional load factor comprises setting the additional load factor to zero in response to the measurement of the measurable characteristic being greater than or equal to the setpoint for the measurable characteristic.

10 . The method of claim 7 , wherein calculating the additional load factor comprises:

calculating a sum of the setpoint for the measurable characteristic and an offset; and

in response to the measurement of the measurable characteristic being less than the sum of the setpoint for the measurable characteristic and the offset:

determining a difference between the measurement of the measurable characteristic and the sum; and

multiplying the difference by a scaling factor.

11 . The method of claim 7 , wherein generating the load allocations comprises:

generating a predicted load for the building equipment based on the effective load; and

allocating the predicted load amongst the building equipment.

12 . The method of claim 7 , wherein generating the load allocations for the building equipment based on the effective load comprises increasing a first load allocated to a first device of the building equipment to compensate for a failure of a second device of the building equipment to meet a second load allocated to the second device of the building equipment.

13 . A method for controlling building equipment, comprising:

operating building equipment to output a resource having a measurable characteristic;

obtaining a measurement of the measurable characteristic at an output of the building equipment and a setpoint for the measurable characteristic at the output of the building equipment;

calculating an additional load factor based on the measurement and the setpoint;

obtaining an actual load for the building equipment;

calculating an effective load for the building equipment based on a sum of the actual load and the additional load factor;

generating load allocations for the building equipment based on the effective load; and

controlling the building equipment based on the load allocations.

14 . The method of claim 13 , comprising controlling the building equipment with a control loop configured to drive the measurable characteristic towards the setpoint.

15 . The method of claim 13 , wherein the additional load factor is positive when the measurement deviates from the setpoint.

16 . The method of claim 13 , wherein calculating the additional load factor comprises setting the additional load factor to zero in response to the measurement being greater than or equal to the setpoint.

17 . The method of claim 13 , wherein calculating the additional load factor comprises:

calculating a sum of the setpoint and an offset; and

in response to the measurement being less than the sum of the setpoint and the offset:

determining a difference between the measurement and the sum; and

multiplying the difference by a scaling factor.

18 . The method of claim 13 , wherein generating the load allocations comprises:

generating a predicted load for the building equipment based on the effective load; and

allocating the predicted load amongst a plurality of devices of the building equipment.

19 . The method of claim 13 , wherein generating the load allocations for the building equipment based on the effective load comprises increasing a first load allocated to a first device of the building equipment to compensate for a failure of a second device of the building equipment to meet a second load allocated to the second device of the building equipment.

20 . The method of claim 13 , wherein the building equipment comprises a chiller.