IP Library Granted Patent US 6,928,134
Granted Patent B1
US 6,928,134 · App. 09/050,651 · Granted Aug 9, 2005

Apparatus for admitting gas into the primary coolant of a pressurized water reactor

Assignee: Framatome ANP GmbH
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,928,134
App. No.
09/050,651
Granted
Aug 9, 2005
Kind
B1
Abstract

An apparatus admits gas into the primary coolant of a pressurized water nuclear reactor having a coolant loop for a liquid coolant, in particular water, to which hydrogen is to be added. The coolant loop preferably includes a volume control tank for the coolant as well as at least one high-pressure pump which admits coolant that has been extracted from the coolant loop back into the coolant loop again. An admission point for the hydrogen is located in a suction line on the suction side of the high-pressure pump. A measurement line on the pressure side of the high-pressure pump communicates with the volume control tank or with a dewatering system. A device for measuring the hydrogen content in the coolant is incorporated into the measurement line. The measuring device is connected through a control device to a control valve, with which the delivery of hydrogen to the admission point can be controlled. The gas admission apparatus assures a definite, precisely maintained hydrogen content in the coolant.

Claims (18)

1. In a pressurized water reactor having at least one high-pressure pump for liquid primary coolant, an apparatus for admitting gas into the liquid primary coolant with hydrogen, comprising:

a) a suction line leading to the at least one high-pressure pump;

b) an admission point for feeding the hydrogen into said suction line;

c) a hydrogen admission line leading to said admission point;

d) a control device having an inlet side and an outlet side;

e) a pressure line connected to the high-pressure pump;

f) a coolant conducting measurement line branching off from said pressure line downstream of the at least one high-pressure pump;

g) a measuring device incorporated into said coolant conducting measurement line and connected to said inlet side of said control device for measuring hydrogen concentration; and

h) a control valve disposed in said hydrogen admission line and connected to said outlet side of said control device.

2. The apparatus according to claim 1 , including a volume control tank, said coolant conducting measurement line leading into said volume control tank.

3. The apparatus according to claim 1 , including a dewatering system, said coolant conducting measurement line leading into said dewatering system.

4. The apparatus according to claim 1 , wherein the at least one high-pressure pump admits the primary coolant extracted from a coolant loop back into the coolant loop.

5. The apparatus according to claim 1 , including a hydrogen supply, said control valve disposed in said hydrogen admission line between said hydrogen supply and said admission point.

6. The apparatus according to claim 1 , including a mixer disposed in said suction line.

7. The apparatus according to claim 6 , wherein said mixer is disposed downstream of said admission point.

8. The apparatus according to claim 1 , including a volume control tank, and a bypass line associated with said volume control tank and having a valve.

9. The apparatus according to claim 8 , wherein said bypass line discharges upstream of said admission point into said suction line between said volume control tank and the at least one high-pressure pump.

10. The apparatus according to claim 1 , wherein said control device is a proportional controller.

Assignments (3)
CHANGE OF NAME Recorded Apr 13, 2010
From: FRAMATOME ANP GMBH
To: AREVA NP GMBH
Reel/Frame 024225/0240 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 6, 2003
From: SIEMENS AKTIENGESELLSCHAFT
To: FRAMATOME ANP GMBH
Reel/Frame 014557/0813 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 24, 2003
From: PUTHAWALA ANWER; STUNKEL, HELMUT
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 013874/0019 →
Priority Claims (1)
DE 195 36 450 · Sep 29, 1995 · national
Continuity (1)
Continuation PCTEP960405700 · Sep 16, 1996