IP Library Granted Patent US 6,873,963
Granted Patent B1
US 6,873,963 · App. 09/451,332 · Granted Mar 29, 2005

Shipment tracking analysis and reporting system (STARS)

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,873,963
App. No.
09/451,332
Granted
Mar 29, 2005
Kind
B1
Abstract

The present invention provides a method for tracking material being transferred from a source to a destination by a carrier which comprises the steps of receiving a transmission from the source, the transmission being indicative of characteristics of the material. Also, a second transmission indicative of characteristics of the carrier is received. The carrier information is then associated with the supplier information. In another aspect, this information is used to estimate times for arrival of shipments, generate alarms for late arrivals and measure performance of suppliers and carriers.

Claims (20)

1. In a data processing system for tracking inventory, said data processing system having a processor for processing data and a storage device for storing data, a method for estimating a time of arrival of supplier goods being transferred from a source to a final destination, wherein said supplier goods are transferred to an intermediate location by a first carrier and from said intermediate location to a final destination by a second carrier, said method comprising the steps of:

receiving at the data processing system a first transmission from said source, said transmission indicative of characteristics of said supplier goods;

receiving at the data processing system a second transmission from said first carrier when said first-carrier is delivering said supplier goods from said source to said intermediate location, said second transmission indicative of characteristics of said first carrier;

associating, with the data processing system, said first carrier with said supplier goods by comparing at least one of said characteristics of said supplier goods contained in said first transmission with at least one of said characteristics of said carrier contained in said second transmission;

obtaining a first estimated time of arrival for said supplier goods to said final destination, said first estimated time of arrival being obtained from said second transmission;

receiving at the data processing system a third transmission when said second carrier is delivering said supplier goods from said intermediate location to said final destination; said third transmission indicative of characteristics of said second carrier;

associating, with the data processing system, said second carrier with said supplier goods by comparing at least one of said characteristics of said supplier goods contained in said first transmission with at least one of said characteristics of said second carrier contained in said third transmission; and

determining, with the data processing system, a second estimated time of arrival from a route plan and the third transmission, said second estimated time of arrival being an updated estimated time of arrival of said supplier goods to said final destination.

2. The method as claimed in claim 1 , wherein said source is a manufacturer and said final destination is a sales location.

3. The method as claimed in claim 1 , wherein said source is a producer of raw material and said final destination is a manufacturer.

4. In a data processing system for tracking supplier goods, said data processing system having a processor for processing data and a storage device for storing data, a method for updating an estimated time of arrival of the supplier goods being transferred from a source to a final destination via one or more intermediate destinations, the method comprising the steps of:

receiving at the data processing system a commodity information message from the source, the commodity information indicative of characteristics of the supplier goods;

receiving at the data processing system a carrier shipment notification message from each of the one or more intermediate destinations whenever an associated carrier has picked up goods for departure, the notification message indicative of characteristics of the associated carrier;

storing all received commodity information messages and carrier shipment notifications in a database; and

updating at the data processing system an estimated time of arrival of the supplier goods at a final destination by associating a current carrier with the commodity information for the goods by comparing at least one characteristic of the goods with at least one characteristic of the associated carrier in the database.

5. The method of claim 4 further comprising the steps of:

comparing at the data processing system the updated established time of arrival with a need time; and

initiating an alarm if the updated estimated time of arrival is later than the need time.

6. The method of claim 4 wherein the characteristics of the goods include commodity, quantity, pick-up location, destination and package number.

7. The method of claim 4 therein the characteristics of each carrier include conveyance number, pick-up location, carrier destination, standard carrier alpha code, and carrier date and time of shipment.

Assignments (5)
RELEASE OF SECURITY INTEREST Recorded Jan 24, 2019
From: JPMORGAN CHASE BANK, N.A.
To: FCA US LLC (FORMERLY KNOWN AS CHRYSLER GROUP LLC)
Reel/Frame 048177/0356 →
RELEASE OF SECURITY INTEREST Recorded May 30, 2017
From: CITIBANK, N.A.
To: FCA US LLC (FORMERLY KNOWN AS CHRYSLER GROUP LLC)
Reel/Frame 042885/0255 →
RELEASE OF SECURITY INTEREST RELEASING SECOND-LIEN SECURITY INTEREST PREVIOUSLY RECORDED AT REEL 026426 AND FRAME 0644, REEL 026435 AND FRAME 0652, AND REEL 032384 AND FRAME 0591 Recorded Feb 11, 2016
From: CITIBANK, N.A.
To: FCA US LLC, FORMERLY KNOWN AS CHRYSLER GROUP LLC
Reel/Frame 037784/0001 →
CHANGE OF NAME Recorded Apr 30, 2015
From: CHRYSLER GROUP LLC
To: FCA US LLC
Reel/Frame 035553/0356 →
SECURITY AGREEMENT Recorded Mar 4, 2014
From: CHRYSLER GROUP LLC
To: JPMORGAN CHASE BANK, N.A.
Reel/Frame 032384/0640 →