IP Library Granted Patent US 7,120,566
Granted Patent B1
US 7,120,566 · App. 09/900,779 · Granted Oct 10, 2006

Method for estimating changes in product life resulting from HALT using exponential acceleration model

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,120,566
App. No.
09/900,779
Granted
Oct 10, 2006
Kind
B1
Abstract

A method provides early estimation of product life using accelerated stress testing data. In an embodiment, data measured from a product operating in a first, high-stress environment is used to predict how long the product will operate in a second, normal operating environment before failure, using an exponential acceleration model. An additional feature of the present invention provides a quantified indication of how much the product has improved from a redesign.

Claims (32)

1. A machine-readable medium storing computer-executable instructions to perform a method of estimating a life of a product, the method comprising:

determining accelerated stress testing data for the product using the relationship t F =AF×exp(t A ), the accelerated stress testing data representing the response of the product operating in a first environment; and

calculating the mean-time-between-failures (MTBF) for the product operating in a second environment based on the accelerated stress testing data,

wherein t F is a time to failure on a field use time scale, AF is an acceleration factor, and t A is a time to failure on an accelerated time scale.

2. The machine-readable medium of claim 1 , wherein said first environment is more likely than the second environment to cause the product to fail.

3. The machine-readable medium of claim 1 , wherein the accelerated stress testing data represents the length of time the product operates in the first environment before the product fails.

4. The machine-readable medium of claim 1 , wherein the accelerated stress testing data is derived from a plurality of different stress tests.

5. The machine-readable medium of claim 4 , wherein the plurality of different stress tests includes a temperature test and a vibrational test.

6. The machine-readable medium of claim 1 , the method further comprising calculating upper and lower confidence limits for the MTBF calculation.

7. The machine-readable medium of claim 1 , wherein said accelerated stress testing data is determined at least in part from bill of materials (BOM) information on the product.

8. The machine-readable medium of claim 1 , wherein said step of calculating is performed during the design of the product.

9. The machine-readable medium of claim 1 , wherein said step of calculating is performed prior to manufacturing the product for commercial use.

10. The machine-readable medium of claim 1 , wherein the accelerated stress testing data includes accelerated stress testing data for a previous design of the product.

11. The machine-readable medium of claim 10 , wherein the accelerated stress testing data for the previous design of the product is derived from stress testing in an environment less likely to cause failure than said first environment.

12. The machine-readable medium of claim 10 , the method further comprising calculating a change in MTBF from the previous design of the product.

13. The machine-readable medium of claim 10 , the method further comprising calculating a factor increase or decrease in the life of the product as compared to the life of the previous design of the product.

14. The machine-readable medium of claim 10 , wherein the accelerated stress testing data is derived from a plurality of different stress tests.

15. The machine-readable medium of claim 14 , wherein the different stress tests include a temperature test and a vibrational test.

16. The machine-readable medium of claim 10 , wherein said step of calculating is performed during the design of the product.

17. The machine-readable medium of claim 10 , wherein said step of calculating is performed prior to manufacturing the product for commercial use.

18. A machine-readable medium storing computer-executable instructions to perform a method of estimating a life of a product, the method comprising:

determining accelerated stress testing data for the product using the relationship t F =AF×exp(t A ), the accelerated stress testing data representing the response of the product operating in a first environment; and

calculating the mean-time-between-failures (MTBF) for the product operating in a second environment based on the accelerated stress testing data,

wherein said first environment is more likely than the second environment to cause the product to fail;

wherein the accelerated stress testing data is derived from a plurality of different stress tests; and

wherein t F is a time to failure on a field use time scale, AF is an acceleration factor, and t A is a time to failure on an accelerated time scale.

19. A machine-readable medium storing computer-executable instructions to perform a method of estimating a life of a product, the method comprising:

determining accelerated stress testing data for the product using the relationship t F =AF×exp(t A ), the accelerated stress testing data representing the response of the product operating in a first environment; and

calculating the mean-time-between-failures (MTBF) for the product operating in a second environment based on the accelerated stress testing data,

wherein said first environment is more likely than the second environment to cause the product to fail;

wherein said accelerated stress testing data is determined at least in part from bill of materials (BOM) information on the product; and

wherein t F is a time to failure on a field use time scale, AF is an acceleration factor, and t A is a time to failure on an accelerated time scale.

Assignments (6)
CHANGE OF NAME Recorded Aug 7, 2008
From: AT&T MOBILITY II, LLC
To: AT&T MOBILITY II LLC
Reel/Frame 021352/0587 →
CHANGE OF NAME Recorded Jul 30, 2008
From: CINGULAR WIRELESS II, LLC
To: AT&T MOBILITY II, LLC
Reel/Frame 021315/0541 →
CERTIFICATE OF CONVERSION Recorded Mar 29, 2006
From: CINGULAR WIRELESS II, INC.
To: CINGULAR WIRELESS II, LLC
Reel/Frame 017696/0375 →
CERTIFICATE OF CONVERSION Recorded Apr 22, 2005
From: CINGULAR WIRELESS II, INC.
To: CINGULAR WIRLEESS II, LLC
Reel/Frame 017546/0612 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 22, 2005
From: NEW CINGULAR WIRELESS SERVICES, INC. F/K/A AT&T WIRELESS SERVICES, INC.
To: CINGULAR WIRELESS II, INC.
Reel/Frame 017555/0711 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 16, 2002
From: BRAND, MICHAEL K.; MCLEAN, HARRY W.
To: AT&T WIRELESS SERVICES, INC.
Reel/Frame 012502/0577 →