IP Library Granted Patent US 6,805,481
Granted Patent Utility
US 6,805,481 · Confirmation No. 2032

HIGH INTENSITY BLENDING TOOL WITH OPTIMIZED RISERS FOR INCREASED INTENSITY WHEN BLENDING TONERS

⬇ PDF
Code Description Pages PDF
2004-06-11 IFEE Issue Fee Payment (PTO-85B) 1 View
2004-06-07 NOA Notice of Allowance and Fees Due (PTOL-85) 3 View
2004-06-07 NOA Notice of Allowance and Fees Due (PTOL-85) 3 View
2004-06-07 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2004-06-07 FWCLM Index of Claims 1 View
2004-06-07 SRFW Search information including classification, databases and other search related notes 1 View
2004-01-12 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2004-01-12 CLM Claims 7 View
2004-01-12 REM Applicant Arguments/Remarks Made in an Amendment 3 View
2004-01-12 LET. Miscellaneous Incoming Letter 1 View
2004-01-12 XT/ Extension of Time 2 View
2003-09-12 CTNF Non-Final Rejection 6 View
2003-09-12 1449 List of References cited by applicant and considered by examiner 1 View
2003-06-27 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-06-27 REM Applicant Arguments/Remarks Made in an Amendment 2 View
2003-06-27 LET. Miscellaneous Incoming Letter 1 View
2003-06-19 A.I. Informal or Non-Responsive Amendment 4 View
2003-05-27 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-05-27 CLM Claims 7 View
2003-05-27 REM Applicant Arguments/Remarks Made in an Amendment 13 View
2003-05-09 IDS Information Disclosure Statement (IDS) Form (SB08) 2 View
2003-05-09 FOR Foreign Reference 10 View
2003-05-09 FOR Foreign Reference 6 View
2003-05-09 FOR Foreign Reference 8 View
2003-05-09 FOR Foreign Reference 8 View
2003-04-23 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-04-23 CLM Claims 4 View
2003-04-23 REM Applicant Arguments/Remarks Made in an Amendment 8 View
2003-04-23 LET. Miscellaneous Incoming Letter 1 View
2003-04-23 XT/ Extension of Time 1 View
2003-01-22 CTNF Non-Final Rejection 11 View
2003-01-22 892 List of references cited by examiner 3 View
2003-01-22 1449 List of References cited by applicant and considered by examiner 2 View
2003-01-15 SRNT Examiner's search strategy and results 1 View
2002-10-15 IDS Information Disclosure Statement (IDS) Form (SB08) 2 View
2002-03-19 LET. Miscellaneous Incoming Letter 1 View
2002-03-19 A.PE Preliminary Amendment 1 View
2002-03-19 SPEC Specification 4 View
2002-03-19 CLM Claims 3 View
2002-03-19 REM Applicant Arguments/Remarks Made in an Amendment 4 View
2002-03-19 CLM Claims 2 View
2002-02-25 PEFR Applicant Response to Pre-Exam Formalities Notice 2 View
2002-02-25 OATH Oath or Declaration filed 9 View
2002-02-25 IDS Information Disclosure Statement (IDS) Form (SB08) 2 View
2001-10-09 PEFN Pre-Exam Formalities Notice 1 View
2001-08-31 TRNA Transmittal of New Application 3 View
2001-08-31 SPEC Specification 33 View
2001-08-31 CLM Claims 6 View
2001-08-31 ABST Abstract 1 View
2001-08-31 DRW Drawings-only black and white line drawings 11 View
2001-08-31 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2001-08-31 SRFW Search information including classification, databases and other search related notes 1 View
2001-08-31 FWCLM Index of Claims 1 View
2001-08-31 TRNA Transmittal of New Application 3 View
2001-08-31 DRW Drawings-only black and white line drawings 11 View
2001-08-31 SPEC Specification 33 View
2001-08-31 CLM Claims 6 View
2001-08-31 ABST Abstract 1 View
2001-08-31 WFEE Fee Worksheet (SB06) 1 View
2001-08-31 WFEE Fee Worksheet (SB06) 1 View
2001-08-31 WCLM Claims Worksheet (PTO-2022) 1 View
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this application's details
Quick Facts
Patent No.
US 6,805,481
App. No.
09/943,951
Filed
2001-08-31
Granted
2004-10-19
Pub. No.
US20030063521A1
Art Unit
1723
PTA
-158 days