IP Library Granted Patent US 6,794,082
Granted Patent Utility
US 6,794,082 · Confirmation No. 7571

ALKALINE BATTERY

⬇ PDF
Code Description Pages PDF
2007-07-02 EBCC.AD Notice of Change of Address Place in File Wrapper Due to Electronic Business Center(EBC) Customer Number Update 1 View
2004-08-16 IFEE Issue Fee Payment (PTO-85B) 1 View
2004-05-19 NOA Notice of Allowance and Fees Due (PTOL-85) 3 View
2004-05-19 NOA Notice of Allowance and Fees Due (PTOL-85) 3 View
2004-05-19 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2004-05-19 FWCLM Index of Claims 1 View
2004-05-19 SRFW Search information including classification, databases and other search related notes 1 View
2004-05-19 EXIN Examiner Interview Summary Record (PTOL - 413) 2 View
2004-04-09 A... Amendment/Request for Reconsideration-After Non-Final Rejection 2 View
2004-04-09 SPEC Specification 1 View
2004-04-09 CLM Claims 4 View
2004-04-09 REM Applicant Arguments/Remarks Made in an Amendment 6 View
2004-03-25 PA.. Power of Attorney 3 View
2004-03-25 LET. Miscellaneous Incoming Letter 2 View
2004-03-22 CTMS Miscellaneous Action with shortened statutory period (SSP) 2 View
2004-02-23 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2004-02-23 SPEC Specification 1 View
2004-02-23 CLM.NE Claim-Amendment Not Entered 4 View
2004-02-23 REM Applicant Arguments/Remarks Made in an Amendment 6 View
2004-02-23 OATH Oath or Declaration filed 4 View
2004-02-23 LET. Miscellaneous Incoming Letter 1 View
2003-10-20 CTNF Non-Final Rejection 17 View
2003-10-20 892 List of references cited by examiner 1 View
2003-10-20 FOR Foreign Reference 19 View
2003-10-02 SRNT Examiner's search strategy and results 2 View
2003-09-08 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-09-08 CLM Claims 2 View
2003-09-08 REM Applicant Arguments/Remarks Made in an Amendment 2 View
2003-09-08 LET. Miscellaneous Incoming Letter 1 View
2003-08-26 EXIN Examiner Interview Summary Record (PTOL - 413) 2 View
2003-05-07 CTNF Non-Final Rejection 10 View
2003-05-07 892 List of references cited by examiner 1 View
2003-05-07 FOR Foreign Reference 31 View
2003-05-01 SRNT Examiner's search strategy and results 4 View
2002-03-11 OATH Oath or Declaration filed 2 View
2002-03-11 FRPR Certified Copy of Foreign Priority Application 37 View
2002-03-11 FRPR Certified Copy of Foreign Priority Application 20 View
2002-03-11 PEFR Applicant Response to Pre-Exam Formalities Notice 2 View
2001-10-09 PEFN Pre-Exam Formalities Notice 1 View
2001-09-06 TRNA Transmittal of New Application 3 View
2001-09-06 A.PE Preliminary Amendment 1 View
2001-09-06 SPEC Specification 45 View
2001-09-06 CLM Claims 3 View
2001-09-06 ABST Abstract 1 View
2001-09-06 DRW Drawings-only black and white line drawings 9 View
2001-09-06 OATH Oath or Declaration filed 2 View
2001-09-06 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2001-09-06 SRFW Search information including classification, databases and other search related notes 1 View
2001-09-06 FWCLM Index of Claims 1 View
2001-09-06 TRNA Transmittal of New Application 4 View
2001-09-06 DRW Drawings-only black and white line drawings 9 View
2001-09-06 SPEC Specification 45 View
2001-09-06 CLM Claims 3 View
2001-09-06 ABST Abstract 1 View
2001-09-06 OATH Oath or Declaration filed 2 View
2001-09-06 WFEE Fee Worksheet (SB06) 1 View
2001-09-06 WFEE Fee Worksheet (SB06) 1 View
2001-09-06 WCLM Claims Worksheet (PTO-2022) 1 View
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this application's details
Quick Facts
Patent No.
US 6,794,082
App. No.
09/947,978
Filed
2001-09-06
Granted
2004-09-21
Pub. No.
US20020127469A1
Art Unit
1745
PTA
-190 days