IP Library Granted Patent US 6,882,888
Granted Patent B2
US 6,882,888 · App. 09/948,062 · Granted Apr 19, 2005

Configuration of a control system for an electrical switchgear assembly

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,882,888
App. No.
09/948,062
Granted
Apr 19, 2005
Kind
B2
Abstract

A method for configuration of a control system for an electrical switchgear assembly uses a primary device model for representation of primary devices, and a topology model of the switchgear assembly. In order to configure a first control system function, the first control system function is allocated to a primary device and to a field device, after which the primary device model and the topology model are used to automatically determine second control system functions which the first control system function requires during operation.

Claims (18)

1. A method for configuration of a control system for an electrical switchgear assembly, which uses a field device model for representation of field devices, and a control function model for representation of control system functions of the switchgear assembly,

wherein the method uses a primary device model for representation of primary devices in the switchgear assembly, and a topology model of the switchgear assembly, and comprises the following steps:

a) association of a first control system function with a primary device by means of the primary device model,

b) association of the first control system function with a field device by means of the field device model,

c) automatic determination of second control system functions, which the first control system function requires during operation of the assembly, on the basis of the topology model.

2. The method as claimed in claim 1 , wherein the method uses a communication model for representation of communication means, and, as a further step comprises:

d) automatic determination of communication links between the first control system function and the second control system functions on the basis of the communication model.

3. The method as claimed in claim 1 , wherein a control system function is allocated a software agent for configuration of the control system function, which determines a representation of information, which information the control system function requires, and which carries out the automatic determination of the second control system functions.

4. The method as claimed in claim 1 , wherein the method is carried out when the switchgear assembly is in an off-line engineering phase, and, when the method is being carried out, configuration parameters are determined for control system functions and communication units and can be loaded into the corresponding control system functions or communication units, respectively.

5. The method as claimed in claim 1 , wherein the method is carried out when the switchgear assembly is in an on-line configuration phase, and, when the method is being carried out, configuration parameters of control system functions and communication units are determined and are loaded into the corresponding control system functions or communication units, respectively.

6. The method as claimed in claim 1 , wherein configuration parameters for a control system function are determined on the basis of data from the primary device model and/or from the topology model.

7. A computer program product having a stored program code which, during operation on a data processing unit, carries out a method for configuration of a control system for an electrical switchgear assembly, which method uses a field device model for representation of field devices, and a control function model for representation of control system functions of the switchgear assembly,

wherein the method uses a primary device model for representation of primary devices in the switchgear assembly, and a topology model of the switchgear assembly, and comprises the following steps:

a) association of a first control system function with a primary device by means of the primary device model,

b) association of the first control system function with a field device by means of the field device model,

c) automatic determination of second control system functions, which the first control system function requires during operation of the assembly, on the basis of the topology model.

8. The computer program product as claimed in claim 7 , wherein the method which is carried out uses a communication model for representation of communication means and, as a further step, comprises:

d) automatic determination of communication links between the first control system function and the second control system functions on the basis of the communication model.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2020
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 052916/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 7, 2001
From: WIMMER, WOLFGANG; QIU, XIAOBING
To: ABB POWER AUTOMATION AG
Reel/Frame 012163/0769 →