IP Library Granted Patent US 7,009,947
Granted Patent B2
US 7,009,947 · App. 10/035,369 · Granted Mar 7, 2006

Integrity of pilot phase offset measurements for predicting pilot strength

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,009,947
App. No.
10/035,369
Granted
Mar 7, 2006
Kind
B2
Abstract

A high integrity process is provided to apply pilot phase rates to call processing decisions. An estimate or measurement of the rate of change of a pilot's PN phase offset is used to assist in making CDMA call processing decisions. The phase rate is a measure of the rate of change of a pilot's PN phase offset relative to a mobile time reference and is directly related to the multipath environment and movement of the mobile. Both an integrity algorithm to compute an integrity indicator and a technique to apply the integrity indicator to predict future pilot strengths are included.

Claims (29)

1. A method of making a call processing decisions comprising:

receiving a pilot energy and a phase rate;

calculating the derivative of the pilot energy;

determining a ratio of the derivative of the energy to the phase rate;

generating an integrity factor based on the ratio;

predicting a future pilot strength based on the integrity factor; and

using the future pilot strength to assist in making the call processing decisions.

2. The method of claim 1 , further comprising filtering the pilot energy.

3. The method of claim 1 , further comprising filtering the phase rate.

4. The method of claim 1 , further comprising setting the integrity factor to zero when said ratio and inputs do not adequately predict the future.

5. The method of claim 1 , further comprising delaying the phase rate relative to the derivative of the pilot energy.

6. The method of claim 1 , further comprising predicting a short term pilot strength based on the integrity factor.

7. The method of claim 6 , further comprising setting the short term pilot strength to the current pilot strength when the integrity factor provides a poor indication of future pilot signal strength.

8. A pilot energy predictor comprising:

an integrity calculator which receives a phase rate and a pilot energy as inputs and determines a ratio of the derivative of the pilot energy to the phase rate and generates an integrity factor based on the ratio.

9. The pilot energy predictor of claim 8 , wherein a future pilot energy is estimated based on the integrity factor.

10. The pilot energy predictor of claim 9 , wherein the future pilot energy is set to the current pilot energy when the integrity factor provides a poor indication of future pilot signal strength.

11. The pilot energy predictor of claim 8 , further comprising:

a decision time frame which provides a phase rate delay parameter to the integrity calculator; and

wherein, the integrity calculator delays the phase rate relative to the pilot energy.

12. The pilot energy predictor of claim 8 , further comprising a filter for the phase rate.

13. The pilot energy predictor of claim 8 , further comprising a filter for the pilot strength.

14. A method of predicting a short term pilot strength comprising:

determining an amount of time to predict the pilot strength;

determining the predicted rate of change in the short term pilot strength; and

calculating the change in short term pilot strength by multiplying the predicted rate of change by the amount of time to predict the pilot strength.

15. The method of claim 14 , further comprising combining the change in short term pilot strength with a current pilot strength to generate a predicted short term pilot energy.

16. The method of claim 15 , further comprising providing the predicted short term pilot energy to a call processing decision logic.

17. The method of claim 14 , further comprising generating the predicted rate of change in pilot strength by multiplying an integrity factor by the current pilot phase rate.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2017
From: DENSO CORPORATION
To: BEIJING XIAOMI MOBILE SOFTWARE CO.,LTD.
Reel/Frame 043224/0278 →