IP Library Granted Patent US 6,816,642
Granted Patent Utility
US 6,816,642 · Confirmation No. 7880

APPARATUS AND METHODS FOR USING FIBER OPTIC ARRAYS IN OPTICAL COMMUNICATION SYSTEMS

Patented Case View Patent ↗
⬇ PDF
Code Description Pages PDF
2011-07-12 SOL.NTC.SUIT Report on the filing or determination of an action regarding a patent 1 View
2004-09-17 IFEE Issue Fee Payment (PTO-85B) 2 View
2004-09-17 LET. Miscellaneous Incoming Letter 1 View
2004-09-17 DRW Drawings-only black and white line drawings 8 View
2004-07-30 NOA Notice of Allowance and Fees Due (PTOL-85) 3 View
2004-07-30 NOA Notice of Allowance and Fees Due (PTOL-85) 1 View
2004-07-30 892 List of references cited by examiner 1 View
2004-07-30 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2004-07-30 BIB Bibliographic Data Sheet 2 View
2004-07-30 FWCLM Index of Claims 1 View
2004-07-30 SRFW Search information including classification, databases and other search related notes 1 View
2004-07-26 SRNT Examiner's search strategy and results 1 View
2004-07-23 SRNT Examiner's search strategy and results 1 View
2004-07-07 AMSB Amendment Submitted/Entered with Filing of Continued Prosecution Application (CPA)/Request for Continued Examination(RCE) 4 View
2004-07-07 CLM Claims 14 View
2004-07-07 REM Applicant Arguments/Remarks Made in an Amendment 5 View
2004-07-07 RCEX Request for Continued Examination (RCE) 1 View
2004-07-07 XT/ Extension of Time 1 View
2004-07-07 WFEE Fee Worksheet (SB06) 2 View
2004-07-07 FWCLM Index of Claims 1 View
2004-01-08 CTFR Final Rejection 7 View
2004-01-08 FWCLM Index of Claims 1 View
2004-01-08 SRFW Search information including classification, databases and other search related notes 1 View
2003-11-25 WFEE Fee Worksheet (SB06) 1 View
2003-11-25 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-11-25 XT/ Extension of Time 1 View
2003-11-25 XT/ Extension of Time 6 View
2003-11-17 A... Amendment/Request for Reconsideration-After Non-Final Rejection 3 View
2003-11-17 CLM Claims 15 View
2003-11-17 REM Applicant Arguments/Remarks Made in an Amendment 7 View
2003-11-17 XT/ Extension of Time 1 View
2003-08-08 N570 Communication - Re: Power of Attorney (PTOL-308) 2 View
2003-07-21 LET. Miscellaneous Incoming Letter 1 View
2003-07-21 PA.. Power of Attorney 3 View
2003-06-16 CTNF Non-Final Rejection 7 View
2003-06-16 892 List of references cited by examiner 1 View
2003-06-16 1449 List of References cited by applicant and considered by examiner 1 View
2003-05-08 SRNT Examiner's search strategy and results 2 View
2003-02-28 RESC Rescind Nonpublication Request for Pre Grant Publication 1 View
2002-06-18 IDS Information Disclosure Statement (IDS) Form (SB08) 2 View
2002-05-07 PEFR Applicant Response to Pre-Exam Formalities Notice 4 View
2002-05-07 OATH Oath or Declaration filed 8 View
2002-03-22 PEFN Pre-Exam Formalities Notice 1 View
2002-03-01 TRNA Transmittal of New Application 4 View
2002-03-01 SPEC Specification 24 View
2002-03-01 CLM Claims 16 View
2002-03-01 ABST Abstract 1 View
2002-03-01 DRW Drawings-only black and white line drawings 5 View
2002-03-01 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2002-03-01 SRFW Search information including classification, databases and other search related notes 1 View
2002-03-01 FWCLM Index of Claims 1 View
2002-03-01 TRNA Transmittal of New Application 4 View
2002-03-01 DRW Drawings-only black and white line drawings 5 View
2002-03-01 SPEC Specification 24 View
2002-03-01 CLM Claims 16 View
2002-03-01 ABST Abstract 1 View
2002-03-01 WFEE Fee Worksheet (SB06) 1 View
2002-03-01 WCLM Claims Worksheet (PTO-2022) 1 View
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this application's details
Quick Facts
Patent No.
US 6,816,642
App. No.
10/087,648
Filed
2002-03-01
Granted
2004-11-09
Examiner
KIM, ELLEN E
Art Unit
2874
PTA
-116 days