IP Library Granted Patent US 6,915,736
Granted Patent B2
US 6,915,736 · App. 10/116,960 · Granted Jul 12, 2005

Baler calculating device

Assignee: CNH America LLC
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,915,736
App. No.
10/116,960
Granted
Jul 12, 2005
Kind
B2
Abstract

A baler is described which has a collection chamber or duct and a baling chamber. Crop material enters the duct until a pre-determined level has been reached at which time a stuffer transfers the pre-compressed crop to the baling chamber. A control system is provided for calculating the ratio between the amount of crop material which should be formed into bales under optimal conditions and the rate of flow of crop material entering the duct. This ratio can be displayed and used to control the speed of the towing vehicle. The present invention uses the duct as a kind of measuring cylinder to determine the rate at which crop material is entering the baler.

Claims (11)

1. An agricultural baler for driving by a towing vehicle, comprising:

a baling chamber;

a collection chamber for collecting crop material before delivery to said baling chamber; and a device for calculating a value relating to the amount or rate of crop material entering the baler;

a charge sensor for sensing when a charge of crop material has filled said collection chamber to a pre-determined degree of filling and for providing an output indicative of the completion of this filling;

a first timer which is started when crop material begins entry into said collection chamber and stops when it receives the output from said charge sensor;

a plunger in said baling chamber for compressing crop material transferred from said collection chamber; and

a timing device providing a timing output relating to a rate of operation of said plunger;

a first calculating device for determining a ratio from the outputs of said charger sensor and said timing device, said ratio being indicative of the time to fill said collection chamber compared with the time the plunger requires to complete a cycle.

2. The baler according to claim 1 , further comprising a control system including said first calculating device, and a display associated with said control system for displaying said ratio.

3. The baler of claim 2 , wherein said display of the ratio increases in contrast with reducing value of said ratio.

4. The baler of claim 3 , wherein said increase of contrast is non-linear with reduction of the value of said ratio.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 7, 2006
From: CNH AMERICA LLC
To: CNH AMERICA LLC; BLUE LEAF I.P., INC.
Reel/Frame 017766/0484 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 5, 2004
From: NEW HOLLAND NORTH AMERICA, INC.
To: CNH AMERICA LLC
Reel/Frame 014972/0164 →
Continuity (2)
Division 0960556000 · Jun 29, 2000
Related Publication 20020174781A1 · Nov 28, 2002