IP Library Granted Patent US 6,841,278
Granted Patent B2
US 6,841,278 · App. 10/160,384 · Granted Jan 11, 2005

Fuel cell performance recovery by cyclic oxidant starvation

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,841,278
App. No.
10/160,384
Granted
Jan 11, 2005
Kind
B2
Abstract

Performance of a fuel cell stack ( 12 ) is recovered following long term decay by connecting ( 51 ) an auxiliary load ( 50 ) to the fuel cell while shutting off one or more of oxidant inlet valve ( 27 a ), oxidant pressure regulating valve ( 28 a ) or oxidant pump ( 26 ), which all may be achieved with a controller ( 46 ), to cyclically starve the cathode of oxidant so that it achieves hydrogen potential, e.g., less than 0.1 volts, for on the order of tens of seconds, repetitively, such as at every 10 or 20 seconds, while the auxiliary load remains connected, initially drawing 10 to 100 mASC, for example. Complete rejuvenation is obtained following 1800 or more cycles over a period of five or more hours.

Claims (12)

1. A method of regenerating the performance of a PEM fuel cell slack in which each cell has an anode flow field to which a hydrogen rich gas is continuously supplied, and has a cathode flow field to which oxidant reactant gas is provided by a pump, said fuel cell stack having a normal load, said method being performed after performance of the fuel cell stack has decayed as a consequence of operation for a period of time between several tens of hours and thousands of hours, said method comprising:

(a) disconnecting the normal load from said fuel cell stack and connecting in its place an auxiliary load for drawing a predetermined amount of current from said fuel cell stack; and

(b) while said auxiliary load is connected to said fuel cell stack, repetitively, for a predetermined number of repetitions, totally interrupting the flow of oxidant reactant gas to the cathodes of all said fuel cells in said stack simultaneously for a period of time sufficient to reduce the cell voltage to less than 0.1 volts.

2. A method according to claim 1 wherein said period of time is sufficient to reduce the cell voltage to less than 0.025 volts.

3. A method according to claim 1 wherein said period of time is between 5 and 50 seconds.

4. A method according to claim 1 wherein there is between 5 and 50 seconds between each repetition.

5. A method according to claim 1 wherein said step (b) is performed by one or more of the following: shutting off said pump; blocking the flow of oxidant reactant gas between said pump and the cathode flow fields; and blocking the flow of oxidant reactant gas from exiting the cathode flow field.

6. A method according to claim 1 wherein said auxiliary load draws an initial current density on the order of between 10 milliamps per square centimeter and 110 milliamps per square centimeter.

7. A method according to claim 1 further comprising:

disconnecting said auxiliary load and reconnecting said normal load following said number of repetitions.

8. A method according to claim 1 wherein oxidant reactant gas is flowing between 20% and 80% of the time, and is not flowing between 80% and 20% of the time.

9. A method according to claim 1 wherein oxidant reactant gas is flowing 40% of the time and is not flowing 60% of the time.

Assignments (5)
CORRECTION OF ASSIGNEE ADDRESS PREVIOUSLY RECORDED AT REEL 035772, FRAME 0192. Recorded Jul 2, 2015
From: BALLARD POWER SYSTEMS INC.
To: AUDI AG
Reel/Frame 036407/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 26, 2015
From: BALLARD POWER SYSTEMS INC.
To: AUDI AG
Reel/Frame 035772/0192 →
CHANGE OF NAME Recorded Mar 16, 2015
From: UTC FUEL CELLS, LLC
To: UTC POWER CORPORATION
Reel/Frame 035206/0155 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 23, 2015
From: UNITED TECHNOLOGIES CORPORATION
To: BALLARD POWER SYSTEMS INC.
Reel/Frame 035006/0529 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 19, 2013
From: UTC POWER CORPORATION
To: UNITED TECHNOLOGIES CORPORATION
Reel/Frame 031033/0325 →