Partial discharge detection test link, partial discharge detection system and methods for detecting partial discharge on a power cable

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,930,491
App. No.
10/169,808
Granted
Aug 16, 2005
Kind
B2
Abstract

A partial discharge detection test link and system is disclosed to detect partial discharge of a power cable accessory. The power cable accessory includes a first accessory component and a second accessory component connected to each other. The partial discharge detection test link is a permanent or temporary substitute for a conventional service link, connects directly across the power cable accessory and includes a conductor member and a partial discharge sensor. The conductor member has an electrically conductive element and an insulation surrounding and extending along the electrically conductive element. The electrically conductive element is electrically connected directly between the first and second accessory components. The partial discharge sensor is disposed about the conductor member and has the electrically conductive element as a primary winding and a secondary winding with the insulation positioned between the primary and secondary windings.

Claims (25)

1. A method for detecting partial discharge on an energized power cable having an accessory interposed therein, the accessory including a first accessory component and a second accessory component coupled to each other and connected by a service link, the method comprising the steps of:

providing a test link having a built-in partial discharge sensor;

removing the service link;

replacing the service link with the test link by directly electrically connecting the first accessory component and the second accessory component together using the test link thereby providing electrical communication between the first and second accessory components through the test link;

detecting the partial discharge of the energized power cable at the test link by generating partial discharge electrical signals representative of the detected partial discharge; and

interpreting the partial discharge electrical signals in a manner to measure the partial discharge of the energized power cable.

2. A method according to claim 1 , further comprising the steps of detecting power frequency current of the energized power cable at the test link as frequency current signals and synchronizing the measured partial discharge of the energized power cable with voltage frequency and voltage phase of voltage in the energized power cable determined from the step of detecting power frequency current of the energized power cable.

3. A method for detecting partial discharge on a plurality of energized power cables with each energized power cable interconnected by an accessory having a first accessory component and a second accessory component coupled to each other and connected by a service link, the plurality of energized power cables disposed apart from one another in a juxtaposed relationship and positioned in an enclosure defined by an arrangement of walls, the method comprising the steps of:

providing at least one electrically insulative barrier and a plurality of test links;

replacing the service links with test links by directly electrically connecting the respective ones of the first accessory components and the second accessory components to each other using respective ones of the plurality of test links thereby providing direct electrical communication between the respective ones of the connected first and second accessory components;

positioning the at least one electrically insulative barrier between juxtaposed ones of the plurality of energized power cables so that flashover is inhibited;

detecting partial discharge of the plurality of energized power cables at respective ones of the test links by generating partial discharge electrical signals representative of the detected partial discharge of the respective energized power cables;

converting the partial discharge electrical signals adjacent the enclosure to alternative energy signals representative of the partial discharge electrical signals;

transmitting the alternative energy signals to a location remote from the enclosure; and

interpreting the alternative energy signals at the remote location in a manner to measure the partial discharge of the respective energized power cables.

4. A method according to claim 3 , further comprising the step of detecting power frequency current of each of the energized power cables at the respective test links as frequency current signals.

5. A method according to claim 4 , further comprising the step of transmitting the frequency current signals to the remote location for synchronizing the measured partial discharge of the respective energized power cables with voltage frequency and voltage phase of voltage in the respective energized power cables.

6. A method according to claim 3 , wherein the interpreting step includes converting the alternative energy signals to electrical output signals and reading the electrical output signals to measure the partial discharge of the respective energized power cables.

7. A method according to claim 3 , further comprising the step of placing at least another one of the electrically insulating barriers between a selected one of the energized power cables and a selected one of the walls to further inhibit flashover.

8. A method for detecting partial discharge on an energized power cable having an accessory interposed therein, the accessory including a first accessory component and a second accessory component coupled to each other and connected by a service link that comprises a first conductor member, the method comprising the steps of:

providing a test link comprising a second conductor member and a built-in partial discharge sensor;

removing the service link;

replacing the service link with the test link by directly electrically connecting the first accessory component and the second accessory component together using the test link thereby providing electrical communication between the first and second accessory components through the test link;

detecting the partial discharge of the energized power cable at the test link by generating partial discharge electrical signals representative of the detected partial discharge; and

interpreting the partial discharge electrical signals in a manner to measure the partial discharge of the energized power cable.

Assignments (3)
CHANGE OF NAME Recorded Oct 16, 2007
From: PRYSMIAN CABLES (2000) LIMITED
To: PRYSMIAN CABLES & SYSTEMS LIMITED
Reel/Frame 019965/0266 →
CHANGE OF NAME Recorded Jul 13, 2007
From: PIRELLI CABLES (2000) LIMITED
To: PRYSMIAN CABLES (2000) LIMITED
Reel/Frame 019550/0515 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 17, 2003
From: GREGORY, BRIAN; BARCLAY, ANDREW LESLIE
To: PIRELLI CABLES (2000) LIMITED
Reel/Frame 013858/0119 →