IP Library Granted Patent US 6,814,896
Granted Patent Utility
US 6,814,896 · Confirmation No. 1646

PRODUCTION OF OPTICAL ELEMENTS

⬇ PDF
Code Description Pages PDF
2014-06-23 SOL.NTC.SUIT Report on the filing or determination of an action regarding a patent 1 View
2013-11-26 SOL.NTC.SUIT Report on the filing or determination of an action regarding a patent 1 View
2013-11-26 SOL.NTC.SUIT Report on the filing or determination of an action regarding a patent 1 View
2004-07-27 NOA Notice of Allowance and Fees Due (PTOL-85) 2 View
2004-07-27 CTMS Miscellaneous Action with shortened statutory period (SSP) 1 View
2004-07-27 XRUSH Internal Response to Printer Query from Technology Center(TC) 1 View
2004-07-27 SPEC Specification 1 View
2004-07-27 FWCLM Index of Claims 1 View
2004-07-27 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2004-07-14 RUSH Printer Query form, used by the publications branch 1 View
2004-07-14 SPEC Specification 1 View
2004-04-26 XRUSH Internal Response to Printer Query from Technology Center(TC) 3 View
2004-03-16 IFEE Issue Fee Payment (PTO-85B) 1 View
2004-03-16 LET. Miscellaneous Incoming Letter 3 View
2004-03-16 A.NA Amendment after Notice of Allowance (Rule 312) 1 View
2004-03-16 CLM Claims 7 View
2004-03-16 REM Applicant Arguments/Remarks Made in an Amendment 2 View
2003-12-17 NOA Notice of Allowance and Fees Due (PTOL-85) 3 View
2003-12-17 NOA Notice of Allowance and Fees Due (PTOL-85) 2 View
2003-12-17 EXIN Examiner Interview Summary Record (PTOL - 413) 1 View
2003-12-17 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2003-12-17 FWCLM Index of Claims 1 View
2003-12-17 SRFW Search information including classification, databases and other search related notes 1 View
2003-10-22 A... Amendment/Request for Reconsideration-After Non-Final Rejection 2 View
2003-10-22 CLM Claims 7 View
2003-10-17 CTMS Miscellaneous Action with shortened statutory period (SSP) 2 View
2003-10-09 LET. Miscellaneous Incoming Letter 3 View
2003-10-09 XT/ Extension of Time 1 View
2003-10-09 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-10-09 CLM Claims 3 View
2003-10-09 REM Applicant Arguments/Remarks Made in an Amendment 6 View
2003-04-09 CTNF Non-Final Rejection 6 View
2003-04-09 892 List of references cited by examiner 1 View
2003-04-09 FOR Foreign Reference 9 View
2003-04-09 1449 List of References cited by applicant and considered by examiner 1 View
2003-03-10 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-02-03 CTRS Requirement for Restriction/Election 7 View
2002-09-13 IDS Information Disclosure Statement (IDS) Form (SB08) 3 View
2002-09-13 FOR Foreign Reference 31 View
2002-06-26 TRNA Transmittal of New Application 3 View
2002-06-26 SPEC Specification 45 View
2002-06-26 CLM Claims 6 View
2002-06-26 ABST Abstract 1 View
2002-06-26 DRW Drawings-only black and white line drawings 3 View
2002-06-26 OATH Oath or Declaration filed 3 View
2002-06-26 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2002-06-26 SRFW Search information including classification, databases and other search related notes 1 View
2002-06-26 FWCLM Index of Claims 1 View
2002-06-26 TRNA Transmittal of New Application 3 View
2002-06-26 DRW Drawings-only black and white line drawings 3 View
2002-06-26 SPEC Specification 45 View
2002-06-26 CLM Claims 6 View
2002-06-26 ABST Abstract 1 View
2002-06-26 OATH Oath or Declaration filed 3 View
2002-06-26 WFEE Fee Worksheet (SB06) 1 View
2002-06-26 WFEE Fee Worksheet (SB06) 1 View
2002-06-26 WCLM Claims Worksheet (PTO-2022) 1 View
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this application's details
Quick Facts
Patent No.
US 6,814,896
App. No.
10/183,088
Filed
2002-06-26
Granted
2004-11-09
Pub. No.
US20020196408A1
Art Unit
1732
PTA
-225 days