IP Library Granted Patent US 6,865,454
Granted Patent B2
US 6,865,454 · App. 10/186,426 · Granted Mar 8, 2005

Train control system and method of controlling a train or trains

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,865,454
App. No.
10/186,426
Granted
Mar 8, 2005
Kind
B2
Abstract

A train control system includes positioning systems at the end of the train and at the front of the train, allowing the conductor or engineer to unambiguously determine that no cars of the train have become detached. The positioning system at the end of the train is also used to verify that the entire train has cleared a block. This information can be relayed to a dispatcher, thereby eliminating the need for trackside sensing equipment. A control unit prevents the train from moving without an authorization that includes the train's current position.

Claims (12)

1. A method for authorizing movement of a plurality of trains, the method comprising the steps of:

setting an end point and a start point of a block of track dynamically;

authorizing a first train to occupy the block of track

receiving an indication from the first train that a global positioning sensor located at a rear of the first train has passed the end point; and

authorizing a second train to occupy the block of track.

2. A train comprising:

an end car;

a positioning system located on the end car;

a control unit in communication with the positioning system, the control unit being configured to accept a dynamically determined end point from a dispatcher of a block which the train has been authorized to occupy and to transmit a message to the dispatcher indicating that the positioning system has passed the end point.

3. The train of claim 2 , further comprising:

a storage device connected to the control unit, the storage device including a database, the database including a location of the end point.

4. The train of claim 3 , wherein the storage device is a non-volatile memory.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 28, 2019
From: SIEMENS INDUSTRY, INC
To: SIEMENS MOBILITY, INC.
Reel/Frame 049841/0758 →
MERGER Recorded Apr 15, 2014
From: SIEMENS RAIL AUTOMATION CORPORATION; SIEMENS INDUSTRY, INC.
To: SIEMENS INDUSTRY, INC.
Reel/Frame 032689/0075 →
CHANGE OF NAME Recorded Sep 16, 2013
From: INVENSYS RAIL CORPORATION
To: SIEMENS RAIL AUTOMATION CORPORATION
Reel/Frame 031217/0423 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 24, 2010
From: QUANTUM ENGINEERING, INC.
To: INVENSYS RAIL CORPORATION
Reel/Frame 024128/0423 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 2, 2002
From: KANE, MARK EDWARD; SHOCKLEY, JAMES FRANCIS; HICKENLOOPER, HARRISON THOMAS
To: QUANTUM ENGINEERING, INC.
Reel/Frame 013076/0228 →