IP Library Granted Patent US 6,787,446
Granted Patent Utility
US 6,787,446 · Confirmation No. 8622

FABRICATION METHOD OF SEMICONDUCTOR INTEGRATED CIRCUIT DEVICE

⬇ PDF
Code Description Pages PDF
2015-12-21 EBCC.AD Notice of Change of Address Place in File Wrapper Due to Electronic Business Center(EBC) Customer Number Update 1 View
2004-12-20 C.AD Change of Address 1 View
2004-08-03 IFEE Issue Fee Payment (PTO-85B) 1 View
2004-05-04 NOA Notice of Allowance and Fees Due (PTOL-85) 3 View
2004-05-04 NOA Notice of Allowance and Fees Due (PTOL-85) 1 View
2004-05-04 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2004-05-04 SRFW Search information including classification, databases and other search related notes 1 View
2004-05-01 SRNT Examiner's search strategy and results 2 View
2004-03-30 WFEE Fee Worksheet (SB06) 1 View
2004-03-16 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2004-03-16 SPEC Specification 8 View
2004-03-16 CLM Claims 16 View
2004-03-16 REM Applicant Arguments/Remarks Made in an Amendment 6 View
2004-03-16 XT/ Extension of Time 1 View
2003-09-16 CTNF Non-Final Rejection 8 View
2003-09-16 892 List of references cited by examiner 1 View
2003-09-16 1449 List of References cited by applicant and considered by examiner 2 View
2003-08-25 SRNT Examiner's search strategy and results 2 View
2003-06-13 ELC. Response to Election / Restriction Filed 2 View
2003-06-13 LET. Miscellaneous Incoming Letter 1 View
2003-06-03 CTRS Requirement for Restriction/Election 5 View
2003-01-21 LET. Miscellaneous Incoming Letter 1 View
2003-01-21 OATH Oath or Declaration filed 2 View
2002-12-09 ELC. Response to Election / Restriction Filed 2 View
2002-11-20 CTRS Requirement for Restriction/Election 4 View
2002-11-07 CFILE Request for Corrected Filing Receipt 3 View
2002-07-03 TRNA Transmittal of New Application 4 View
2002-07-03 A.PE Preliminary Amendment 4 View
2002-07-03 SPEC Specification 57 View
2002-07-03 CLM Claims 14 View
2002-07-03 ABST Abstract 1 View
2002-07-03 DRW Drawings-only black and white line drawings 31 View
2002-07-03 OATH Oath or Declaration filed 4 View
2002-07-03 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2002-07-03 SRFW Search information including classification, databases and other search related notes 2 View
2002-07-03 FWCLM Index of Claims 2 View
2002-07-03 TRNA Transmittal of New Application 4 View
2002-07-03 DRW Drawings-only black and white line drawings 31 View
2002-07-03 SPEC Specification 57 View
2002-07-03 CLM Claims 14 View
2002-07-03 ABST Abstract 1 View
2002-07-03 OATH Oath or Declaration filed 4 View
2002-07-03 WFEE Fee Worksheet (SB06) 1 View
2002-07-03 WFEE Fee Worksheet (SB06) 1 View
2002-07-03 WCLM Claims Worksheet (PTO-2022) 1 View
2002-07-03 FRPR Certified Copy of Foreign Priority Application 57 View
2002-07-03 FRPR Certified Copy of Foreign Priority Application 80 View
2002-07-03 IDS Information Disclosure Statement (IDS) Form (SB08) 1 View
2002-07-03 FOR Foreign Reference 9 View
2002-07-03 FOR Foreign Reference 6 View
2002-07-03 FOR Foreign Reference 8 View
2002-07-03 FOR Foreign Reference 7 View
2002-07-03 FOR Foreign Reference 12 View
2002-07-03 FOR Foreign Reference 8 View
2002-07-03 FOR Foreign Reference 7 View
2002-07-03 FOR Foreign Reference 36 View
2002-07-03 A.PE Preliminary Amendment 1 View
2002-07-03 REM Applicant Arguments/Remarks Made in an Amendment 3 View
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this application's details
Quick Facts
Patent No.
US 6,787,446
App. No.
10/188,001
Filed
2002-07-03
Granted
2004-09-07
Pub. No.
US20030032284A1
Art Unit
2812
PTA
-91 days