IP Library Granted Patent US 7,491,457
Granted Patent B2
US 7,491,457 · App. 10/222,417 · Granted Feb 17, 2009

Fuel cell apparatus

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,491,457
App. No.
10/222,417
Granted
Feb 17, 2009
Kind
B2
Abstract

A fuel cell apparatus including fuel cell blocks electrically re-configurable in at least two arrangements by a control module.

Claims (16)

1. A fuel cell control module comprising circuitry programmed to re-configure connections among a plurality of fuel cells to selectively connect the plurality of fuel cells in series, parallel, or a combination of series and parallel in response to load conditions;

wherein one or more of said plurality of fuel cells that is in active operation most often is placed central to said plurality of fuel cells to provide heat to less active fuel cells of said plurality of fuel cells.

2. The control module of claim 1 , wherein said control module is programmed to reconfigure said fuel blocks to simultaneously provide multiple electrical outputs comprising different currents and/or different voltages.

3. The control module of claim 1 , wherein said control module is programmed to reconfigure said fuel cell blocks in response to changes in load demand.

4. The control module of claim 1 , wherein said control module is programmed to receive fuel cell performance data and electrically reconfigure said plurality of fuel cell stacks in response to said fuel cell performance data.

5. A method of controlling fuel cell power output comprising placing one or more of said fuel cell blocks that is in active operation most often central to said multiple fuel cell blocks to provide heat to less active fuel cells and electrically re-configuring one or more connections between multiple fuel cell blocks with a controller to selectively connect the multiple fuel cells with any of series, parallel, or a combination of series and parallel connections in response to load conditions.

6. The method of claim 5 , wherein said re-configuring comprises opening or closing one or more switches electrically tied to said one or more connections.

7. The method of claim 5 , further comprising monitoring one or more of fuel cell load characteristics, fuel cell performance, and feedback data from a load device.

8. The method of claim 5 , further comprising calculating an optimal fuel cell block configuration based on one or more of said fuel cell load characteristics, fuel cell performance, and feedback data from said load device.

9. A method of varying the power output of a fuel cell apparatus comprising:

placing one or more of said plurality of fuel cell blocks anticipated to be in active operation most often central to said plurality of fuel cell blocks to provide heat to less active fuel cell blocks;

arranging fuel cell blocks in an automatically re-configurable structure; and

selectively re-configuring said fuel cell block by selectively connecting the multiple fuel cell blocks with any of series, parallel, or a combination of series and parallel connections in response to load conditions.

10. The method of c claim 9 , further comprising simultaneously providing multiple voltages to a load device by re-configuring said fuel cell blocks.

11. The method of claim 9 , further comprising monitoring one or more of fuel cell load characteristics, fuel cell performance, and feedback data from a load device.

12. The method of claim 11 , further comprising calculating an optimal fuel cell block configuration based on one or more of said fuel cell load characteristics, fuel cell performance, and feedback data from said load device.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 17, 2015
From: EVEREADY BATTERY COMPANY, INC.
To: APPLE INC.
Reel/Frame 034973/0060 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 16, 2011
From: HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.; HEWLETT-PACKARD COMPANY
To: EVEREADY BATTERY COMPANY, INC.
Reel/Frame 026463/0542 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 18, 2003
From: HEWLETT-PACKARD COMPANY
To: HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.
Reel/Frame 013776/0928 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 21, 2003
From: KEARL, DANIEL A.; BARNES, TED W.; CHAMPION, DAVID; HERMAN, GREGORY
To: HEWLETT-PACKARD COMPANY
Reel/Frame 013761/0177 →