IP Library Granted Patent US 6,987,837
Granted Patent B1
US 6,987,837 · App. 10/236,565 · Granted Jan 17, 2006

Close-out test system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,987,837
App. No.
10/236,565
Granted
Jan 17, 2006
Kind
B1
Abstract

The invention is a method and system conducting a completion test on a communications line. The system includes a testing device coupled to a remote device by a network. Line-test results are received from the testing device and made available to various client devices via the same or another network. Test data is automatically archived for analysis.

Claims (30)

1. A method for performing line tests on a subscriber's communication line (“line”) in a communications network, the method comprising:

at a subscriber's site, initiating one or more line tests on said line, said initiating including determining a set of mandatory tests to be performed on said line;

receiving test data that includes a set of line results received in response to running said-mandatory tests;

communicating said test data to an evaluation application that can receive test parameters from a remote service and that performs the following:

(1) evaluates the test data against a set of test parameters that define pass/fail conditions associated with said one or more line tests;

(2) identifies which of said one or more line tests fail;

(3) identifies a set of remarks fields that must be populated incident to overriding a test;

requiring for close out:

(1) receiving additional data associated with rerun tests that produce results within said test parameters; or

(2) receiving an override indication, wherein if said override indication is received, requiring that comments be entered in said remarks fields prior to closing said test;

communicating said test results to a remotely accessible database; and

automatically evaluating said test results so that incomplete tests can be denoted, whereby subsequent action can be taken to correct unresolved problems.

2. The method of claim 1 , wherein said set of mandatory tests includes tests that a technician should run based on a set of services associated with said line.

3. The method of claim 2 , wherein receiving test data includes receiving supplementary information that supplements said line results.

4. The method of claim 3 , wherein said supplementary information includes at least one of:

indicia identifying said technician; or

indicia identifying said subscriber's site.

5. The method of claim 2 , wherein said evaluation application is embodied on one or more computer-readable media of a portable device.

6. The method of claim 2 , wherein said set of remarks fields makes up part of a graphical user interface adapted to receive comments from said technician.

7. The method of claim 2 , wherein closeout comprises completing steps associated with troubleshooting said line.

8. The method of claim 2 , wherein receiving additional data includes receiving data from tests that are performed after said technician has attempted to remedy problem(s) associated with said line.

9. The method of claim 8 , wherein said override indication includes an indication that close out is to occur without having fixed said problem(s).

10. The method of claim 2 , wherein automatically evaluating said test results includes evaluating said test results without user intervention.

11. The method of claim 10 , wherein evaluating said test results includes determining which tests were complete and which tests were incomplete.

12. The method of claim 11 , wherein subsequent action includes:

automatically identifying a more appropriate technician; and

automatically communicating an indication of an incomplete test to said more appropriate technician.

13. The method of claim 1 , wherein said one or more line tests include a selection from the group comprising: a voltage test, a current test, a resistance test, an impedance test, a reactance test, a line test, a tone test, a balance test, a frequency test, a loss test, a signal-degradation test, a power-influence test, a noise test, a fault test, a dead-air test, a continuity test, a signal-quality test, a completion test, a loop-length test, a joint-resistance test, an irregular-load test, a capacitance test, a wet-cable test, and a split-pair test.

14. One or more machine-readable media having machine-useable instructions embodied thereon for performing the method of claim 1 .

15. A handheld device programmed to execute the machine-useable instructions of claim 14 .

Assignments (2)
TERMINATION AND RELEASE OF FIRST PRIORITY AND JUNIOR PRIORITY SECURITY INTEREST IN PATENT RIGHTS Recorded Apr 2, 2020
From: DEUTSCHE BANK TRUST COMPANY AMERICAS
To: SPRINT COMMUNICATIONS COMPANY L.P.
Reel/Frame 052969/0475 →
GRANT OF FIRST PRIORITY AND JUNIOR PRIORITY SECURITY INTEREST IN PATENT RIGHTS Recorded Mar 6, 2017
From: SPRINT COMMUNICATIONS COMPANY L.P.
To: DEUTSCHE BANK TRUST COMPANY AMERICAS
Reel/Frame 041895/0210 →