IP Library Patent Application 10294653
Patent Application Utility
App. No. 10/294,653 · Confirmation No. 8832

POLISHING OF CONDUCTIVE LAYERS IN FABRICATION OF INTEGRATED CIRCUITS

Inventor: Kuo-Chun Wu
Patent Expired Due to NonPayment of Maintenance Fees Under 37 CFR 1.362 View Patent ↗ View Publication ↗
⬇ PDF
Code Description Pages PDF
2004-03-01 C.AD Change of Address 1 View
2003-12-16 IFEE Issue Fee Payment (PTO-85B) 1 View
2003-12-16 LET. Miscellaneous Incoming Letter 2 View
2003-10-22 NOA Notice of Allowance and Fees Due (PTOL-85) 4 View
2003-10-22 NOA Notice of Allowance and Fees Due (PTOL-85) 3 View
2003-10-22 ANE.I Amendment After Final or under 37CFR 1.312, initialed by the examiner. 1 View
2003-10-22 CLM Claims 5 View
2003-10-22 REM Applicant Arguments/Remarks Made in an Amendment 2 View
2003-10-22 1449 List of References cited by applicant and considered by examiner 1 View
2003-10-22 892 List of references cited by examiner 1 View
2003-10-22 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2003-10-22 FWCLM Index of Claims 1 View
2003-10-22 SRFW Search information including classification, databases and other search related notes 1 View
2003-10-22 SRNT Examiner's search strategy and results 2 View
2003-10-14 WFEE Fee Worksheet (SB06) 1 View
2003-10-14 FWCLM Index of Claims 1 View
2003-09-30 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-09-30 CLM Claims 5 View
2003-09-30 REM Applicant Arguments/Remarks Made in an Amendment 2 View
2003-09-30 LET. Miscellaneous Incoming Letter 1 View
2003-08-29 CTFR Final Rejection 9 View
2003-08-29 892 List of references cited by examiner 1 View
2003-06-05 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-06-05 SPEC Specification 1 View
2003-06-05 CLM Claims 5 View
2003-06-05 REM Applicant Arguments/Remarks Made in an Amendment 3 View
2003-06-05 LET. Miscellaneous Incoming Letter 1 View
2003-04-03 CTMS Miscellaneous Action with shortened statutory period (SSP) 2 View
2003-03-27 CTNF Non-Final Rejection 5 View
2003-03-27 892 List of references cited by examiner 1 View
2003-03-27 1449 List of References cited by applicant and considered by examiner 1 View
2003-03-27 PA.. Power of Attorney 2 View
2002-12-30 IDS Information Disclosure Statement (IDS) Form (SB08) 3 View
2002-11-13 TRNA Transmittal of New Application 2 View
2002-11-13 A.PE Preliminary Amendment 1 View
2002-11-13 SPEC Specification 6 View
2002-11-13 CLM Claims 6 View
2002-11-13 ABST Abstract 1 View
2002-11-13 DRW Drawings-only black and white line drawings 3 View
2002-11-13 OATH Oath or Declaration filed 3 View
2002-11-13 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2002-11-13 SRFW Search information including classification, databases and other search related notes 1 View
2002-11-13 FWCLM Index of Claims 1 View
2002-11-13 TRNA Transmittal of New Application 2 View
2002-11-13 DRW Drawings-only black and white line drawings 3 View
2002-11-13 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2002-11-13 SPEC Specification 6 View
2002-11-13 CLM Claims 6 View
2002-11-13 ABST Abstract 1 View
2002-11-13 OATH Oath or Declaration filed 3 View
2002-11-13 WFEE Fee Worksheet (SB06) 1 View
2002-11-13 WFEE Fee Worksheet (SB06) 2 View
2002-11-13 WCLM Claims Worksheet (PTO-2022) 1 View
2002-11-13 IDS Information Disclosure Statement (IDS) Form (SB08) 2 View
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this application's details
Quick Facts
App. No.
10/294,653
Filed
2002-11-13
Granted
2004-03-30
Pub. No.
US20030230790A1
Art Unit
2826
PTA
-106 days