Method of constructing a rail track in which a concrete track slab is produced and rail track anchor members are inserted into the track slab

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,913,717
App. No.
10/309,075
Granted
Jul 5, 2005
Kind
B2
Abstract

A method of constructing a rail track in which a concrete track slab is produced and rail track anchor members are inserted in the track slab by an inserter system mobile along the route of the rail track includes the following steps: using a machine for continuously pouring concrete to produce two concrete walls laterally delimiting the edges of the track slab to be poured; pouring the concrete track slab between the walls; and using the inserter system to insert anchor members in the freshly poured track slab, the tie plate inserter system being adjusted accurately by a measuring station, topographical survey points, a measuring system, and reflectors carried by the inserter system.

Claims (12)

1. A method of constructing a rail track in which a concrete track slab is produced and rail track anchor members are inserted in said track slab by an inserter system mobile along the route of said rail track, which method includes the following steps:

a) using a machine for continuously pouring concrete to produce two concrete walls laterally delimiting the edges of said track slab to be poured;

b) pouring said concrete track slab between said walls; and

c) using said inserter system to insert anchor members in the freshly poured track slab.

2. The method claimed in claim 1 of constructing a rail track, wherein said walls guide movement of the inserter system.

3. The method claimed in claim 1 of constructing a rail track, wherein said continuous pouring machine is guided during said step a) of producing said walls by a measuring station which is referenced to topographical survey points and includes an optical measuring system cooperating with reflectors carried by said continuous pouring machine.

4. The method claimed in claim 1 of constructing a rail track, wherein said inserter system has wheels, the distance between which is suitable for traveling on said walls, each of said wheels having an external flange engaging in front of the lateral edge of a corresponding one of said walls and guiding said inserter system along said walls.

5. The method claimed in claim 1 of constructing a rail track, wherein said inserter system includes an articulated arm which inserts said anchor members accurately, said articulated arm being positioned accurately by means of a measuring station which is referenced to topographical survey points and includes an optical measuring system cooperating with reflectors carried by said arm of said inserter system.

6. The method claimed in claim 1 of constructing a rail track, wherein, before said step b) of pouring concrete to produce said track slab, metal armatures are disposed between said two walls, in order to produce a reinforced concrete track slab.

7. The method claimed in claim 1 of constructing a rail track, wherein, in said step a), a concrete foundation slab lying between said two walls is formed at the same time as said walls and said foundation slab has a thickness less than the height of said walls in order to leave between said walls a receiving cavity into which the concrete of said track slab is poured.

8. The method claimed in claim 1 of constructing a rail track, wherein said track slab is made from concrete with a traditional formula that is fed between said two walls by means of a pump or truck mixer.

9. The method claimed in claim 8 , of constructing a rail track, wherein said track slab is leveled by means of a vibrating float guided by said walls, the accuracy of the height of said vibrating float being tied to that of said walls.

Assignments (5)
CHANGE OF ADDRESS Recorded Jul 31, 2017
From: ALSTOM TRANSPORT TECHNOLOGIES
To: ALSTOM TRANSPORT TECHNOLOGIES
Reel/Frame 043382/0290 →
CORRECTIVE ASSIGNMENT TO REMOVE ERRONEOUS FILED PATENT NO. 6250442 PREVIOUSLY RECORDED AT REEL: 035455 FRAME: 0513. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Aug 10, 2015
From: ALSTOM TRANSPORT SA
To: ALSTOM TRANSPORT TECHNOLOGIES
Reel/Frame 036344/0852 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 20, 2015
From: ALSTOM TRANSPORT SA
To: ALSTOM TRANSPORT TECHNOLOGIES
Reel/Frame 035455/0513 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 14, 2015
From: ALSTOM
To: ALSTOM TRANSPORT SA
Reel/Frame 035422/0967 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 23, 2003
From: SAYADI, MARC; SKIFIC, YVAN
To: ALSTOM
Reel/Frame 013693/0154 →