IP Library Granted Patent US 6,958,197
Granted Patent B2
US 6,958,197 · App. 10/355,892 · Granted Oct 25, 2005

Control system for sodium-sulfur battery

Assignees: NGK Insulators, Ltd.; The Tokyo Electric Power Co., Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,958,197
App. No.
10/355,892
Granted
Oct 25, 2005
Kind
B2
Abstract

A control system for a sodium-sulfur battery, which is composed of a plurality of battery modules connected in series, includes a control device having at least a temperature measuring unit for measuring a temperature of each battery module, a voltage measuring unit for measuring a voltage thereof, and a current measuring unit for measuring a current thereof assembled as a single control device. Preferably, the system includes a unit for detecting the end of discharge and the end of charge. Thus, the time lag in the detection of the end of discharge and the end of charge may be prevented. The reliability of a NaS battery during long-term operation is improved. A fluctuation in the power consumption of heaters during the driving of the NaS battery is reduced. The space required for installing power equipment such as a transformer may be omitted.

Claims (35)

1. A control system for a sodium-sulfur battery that includes a plurality of sodium-sulfur battery modules comprising:

a single control device comprising:

a temperature measuring unit capable of measuring a temperature of each battery module;

a voltage measuring unit for measuring a voltage of each battery module; and

a current measuring unit for measuring a current of each battery module,

wherein said measuring units independently measure temperature, voltage and current of each battery module, and wherein said single control device reduces the misdetection of end-of-charge or end-of-discharge operations.

2. The system of claim 1 , further comprising an end-of-discharge detecting unit.

3. The system of claim 2 , further comprising:

a heater for each battery module;

a heater control unit to control each heater; and

a three-phase, three-wire power supply to supply power to said heaters,

wherein each of said heaters is connected as a load between the three-phase power lines, such that power consumption per unit time of the heaters is leveled.

4. The system of claim 1 , further comprising:

a heater for each battery module;

a heater control unit to control each heater, and a three-phase, three-wire power supply to supply power to said heaters,

wherein each of said heaters is connected as a load between the three-phase power lines, such that power consumption per unit time of the heaters is leveled.

5. A sodium-sulfur battery power storage system comprising:

a battery frame;

a plurality of sodium-sulfur battery modules; and

a single control device mounted at the bottom of said battery frame and comprising:

a temperature measuring unit capable of measuring a temperature of each battery module;

a voltage measuring unit for measuring a voltage of each battery module; and

a current measuring unit for measuring a current of each battery module, wherein said measuring units independently measure temperature, voltage and current for each battery module, and

wherein said single control device reduces the misdetection of end-of-charge or end-of-discharge operations.

6. The system of claim 5 , further comprising an end-of-discharge detecting unit.

7. The system of claim 6 , further comprising:

a heater for each battery module;

a heater control unit to control each heater; and

a three-phase, three-wire power supply to supply power to said heaters,

wherein each of said heaters is connected as a load between the three-phase power lines, such that power consumption per unit time of the heaters is leveled.

8. The system of claim 5 , further comprising:

a heater for each battery module;

a heater control unit to control each heater; and

a three-phase, three-wire power supply to supply power to said heaters,

wherein each of said heaters is connected as a load between the three-phase power lines, such that power consumption per unit time of the heaters is leveled.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 29, 2011
From: THE TOKYO ELECTRIC POWER COMPANY, INCORPORATED
To: NGK INSULATORS, LTD.
Reel/Frame 026670/0987 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 31, 2003
From: TAMAKOSHI, TOMIO
To: NGK INSULATORS, LTD.; TOKYO ELECTRIC POWER CO., INC., THE
Reel/Frame 013726/0539 →
Priority Claims (1)
JP 2002-091911 · Mar 28, 2002 · national
Continuity (1)
Related Publication 20030186111A1 · Oct 2, 2003