IP Library Granted Patent US 6,790,808
Granted Patent Utility
US 6,790,808 · Confirmation No. 1003

EXHAUST GAS PURIFYING CATALYST

⬇ PDF
Code Description Pages PDF
2004-08-05 IFEE Issue Fee Payment (PTO-85B) 2 View
2004-08-05 IFEE Issue Fee Payment (PTO-85B) 2 View
2004-05-05 NOA Notice of Allowance and Fees Due (PTOL-85) 3 View
2004-05-05 NOA Notice of Allowance and Fees Due (PTOL-85) 4 View
2004-05-05 1449 List of References cited by applicant and considered by examiner 1 View
2004-05-05 892 List of references cited by examiner 1 View
2004-05-05 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2004-05-05 FWCLM Index of Claims 1 View
2004-05-05 SRFW Search information including classification, databases and other search related notes 1 View
2004-04-13 A.NE Response After Final Action 2 View
2004-04-13 CLM Claims 2 View
2004-04-13 REM Applicant Arguments/Remarks Made in an Amendment 2 View
2004-01-15 PET. Petition Entered 3 View
2004-01-15 LET. Miscellaneous Incoming Letter 3 View
2004-01-14 CTFR Final Rejection 6 View
2004-01-14 EXIN Examiner Interview Summary Record (PTOL - 413) 1 View
2003-12-17 DIST Terminal Disclaimer Filed 1 View
2003-12-05 CTAV Advisory Action (PTOL-303) 3 View
2003-11-12 LET. Miscellaneous Incoming Letter 2 View
2003-11-12 DIST Terminal Disclaimer Filed 2 View
2003-10-20 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-10-20 CLM Claims 3 View
2003-10-20 REM Applicant Arguments/Remarks Made in an Amendment 1 View
2003-10-20 LET. Miscellaneous Incoming Letter 2 View
2003-10-15 CTFR Final Rejection 4 View
2003-08-07 CFILE Request for Corrected Filing Receipt 3 View
2003-08-05 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-08-05 REM Applicant Arguments/Remarks Made in an Amendment 1 View
2003-08-05 LET. Miscellaneous Incoming Letter 2 View
2003-06-02 CTNF Non-Final Rejection 4 View
2003-06-02 892 List of references cited by examiner 1 View
2003-06-02 1449 List of References cited by applicant and considered by examiner 1 View
2003-02-12 TRNA Transmittal of New Application 3 View
2003-02-12 A.PE Preliminary Amendment 7 View
2003-02-12 SPEC Specification 21 View
2003-02-12 CLM Claims 4 View
2003-02-12 ABST Abstract 1 View
2003-02-12 DRW Drawings-only black and white line drawings 6 View
2003-02-12 OATH Oath or Declaration filed 3 View
2003-02-12 LET. Miscellaneous Incoming Letter 1 View
2003-02-12 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2003-02-12 SRFW Search information including classification, databases and other search related notes 1 View
2003-02-12 FWCLM Index of Claims 1 View
2003-02-12 TRNA Transmittal of New Application 3 View
2003-02-12 DRW Drawings-only black and white line drawings 6 View
2003-02-12 SPEC Specification 21 View
2003-02-12 CLM Claims 4 View
2003-02-12 ABST Abstract 1 View
2003-02-12 OATH Oath or Declaration filed 3 View
2003-02-12 WFEE Fee Worksheet (SB06) 1 View
2003-02-12 WFEE Fee Worksheet (SB06) 1 View
2003-02-12 WCLM Claims Worksheet (PTO-2022) 1 View
2003-02-12 IDS Information Disclosure Statement (IDS) Form (SB08) 1 View
2003-02-12 FOR Foreign Reference 14 View
2003-02-12 FOR Foreign Reference 14 View
2003-02-12 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-02-12 CLM Claims 2 View
2003-02-12 REM Applicant Arguments/Remarks Made in an Amendment 4 View
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this application's details
Quick Facts
Patent No.
US 6,790,808
App. No.
10/365,007
Filed
2003-02-12
Granted
2004-09-14
Pub. No.
US20030144132A1
Art Unit
1755
PTA
-23 days