Fixed IDC operation of fuel cell power plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,041,403
App. No.
10/373,619
Granted
May 9, 2006
Kind
B2
Abstract

A method for operating a fuel cell power plant to supply power to an internal load and an external load, includes the steps of evaluating power needs of the internal and external loads to determine a fixed IDC value sufficient to supply the needs; providing auxiliary power to the internal load and output power to the external load so as to maintain operation of the fuel cell power plant at the fixed IDC value; and adjusting at least one of the auxiliary power to the internal load and output power to the external load so as to maintain operation of the fuel cell power plant at the fixed IDC value.

Claims (16)

1. A method for operating a fuel cell power plant to supply power to an internal load and an external load, comprising the steps of:

evaluating power needs of said internal and external loads to determine a fixed IDC value sufficient to supply said needs;

operating said fuel cell power plant to provide said fixed IDC value;

providing auxiliary power to said internal load and output power to said external load so as to maintain operation of said fuel cell power plant at said fixed IDC value; and

adjusting at least one of said auxiliary power to said internal load and output power to said external load so as to maintain operation of said fuel cell power plant at said fixed IDC value, wherein the internal load has a maximum power requirement and the external load has a minimum power requirement, and wherein the evaluating step comprises setting said fixed IDC value sufficient to supply both said maximum power requirement of said internal load and said minimum power requirement of said external load.

2. The method of claim 1 , wherein said adjusting step comprises adjusting said auxiliary power to said internal load so as to maintain operation of said fuel cell power plant at said fixed IDC value.

3. The method of claim 1 , wherein said fuel cell power plant has a normal operating mode wherein said adjusting step cannot be carried out and a reliability enhanced operating mode wherein said adjusting step can be carried out.

4. A method for operating a fuel cell power plant, comprising the steps of:

evaluating power needs of an external load to determine a fixed IDC value sufficient to supply said needs; and

operating said fuel cell power plant at substantially fixed reactant flows sufficient to provide said fixed IDC value, wherein said evaluating step comprises evaluating combined power needs of an internal load and said external load to determine said fixed IDC value sufficient to supply said needs and further comprising determining a range of IDC values which can be provided at said substantially fixed reactant flows, and adjusting said fixed IDC value within said range of IDC values.

5. The method of claim 4 , wherein said adjusting step comprises adjusting at least one of auxiliary power to said internal load and output power to said external load.

6. A method for operating a fuel cell power plant to supply power to an internal load and an external load, comprising the steps of:

evaluating power needs of said internal load and said external load to determine a fixed IDC value sufficient to supply said needs;

operating said fuel cell power plant at substantially fixed reactant flows sufficient to provide said fixed IDC value; and

adjusting power to at least one of said internal load and said external load so as to maintain said fixed IDC value and said fixed reactant flows, wherein the internal load has a maximum power requirement and the external load has a minimum power requirement, and wherein the evaluating step comprises setting said fixed IDC value sufficient to supply both said maximum power requirement of said internal load and said minimum power requirement of said external load.

7. The method of claim 6 , wherein said adjusting step comprises adjusting at least one of auxiliary power to said internal load and output power to said external load.

Assignments (6)
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE ADDRESS PREVIOUSLY RECORDED AT REEL: 035728 FRAME: 0905. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Aug 24, 2015
From: BALLARD POWER SYSTEMS INC.
To: AUDI AG
Reel/Frame 036481/0803 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 19, 2015
From: BALLARD POWER SYSTEMS INC.
To: AUDI AG
Reel/Frame 035728/0905 →
CHANGE OF NAME Recorded Mar 16, 2015
From: UTC FUEL CELLS, LLC
To: UTC POWER CORPORATION
Reel/Frame 035206/0155 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 23, 2015
From: UNITED TECHNOLOGIES CORPORATION
To: BALLARD POWER SYSTEMS INC.
Reel/Frame 035006/0529 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 19, 2013
From: UTC POWER CORPORATION
To: UNITED TECHNOLOGIES CORPORATION
Reel/Frame 031033/0325 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 25, 2003
From: GRUBB, PAUL A.; MARGIOTT, PAUL R.; HAGGERTY, SEAN; GOLOVCHENKO, PETER A.; SCHEFFLER, GLENN W.
To: UTC FUEL CELLS, LLC
Reel/Frame 013818/0513 →