IP Library Granted Patent US 6,798,168
Granted Patent Utility
US 6,798,168 · Confirmation No. 4788

BATTERY WITH REDUCED SPECIFIC ABSORPTION RATE PROPERTIES

Patented Case View Patent ↗
⬇ PDF
Code Description Pages PDF
2010-12-22 C.AD Change of Address 2 View
2004-08-23 IFEE Issue Fee Payment (PTO-85B) 3 View
2004-08-03 LET. Miscellaneous Incoming Letter 1 View
2004-08-03 DRW Drawings-only black and white line drawings 3 View
2004-07-07 NOA Notice of Allowance and Fees Due (PTOL-85) 3 View
2004-07-07 NOA Notice of Allowance and Fees Due (PTOL-85) 2 View
2004-07-07 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2004-07-07 SRFW Search information including classification, databases and other search related notes 1 View
2004-07-01 WFEE Fee Worksheet (SB06) 1 View
2004-06-18 A... Amendment/Request for Reconsideration-After Non-Final Rejection 2 View
2004-06-18 SPEC Specification 1 View
2004-06-18 CLM Claims 2 View
2004-06-18 REM Applicant Arguments/Remarks Made in an Amendment 2 View
2004-04-20 CTNF Non-Final Rejection 4 View
2004-04-20 892 List of references cited by examiner 1 View
2004-04-20 FWCLM Index of Claims 1 View
2004-04-20 SRFW Search information including classification, databases and other search related notes 1 View
2003-04-23 TRNA Transmittal of New Application 3 View
2003-04-23 SPEC Specification 6 View
2003-04-23 CLM Claims 2 View
2003-04-23 ABST Abstract 1 View
2003-04-23 DRW Drawings-only black and white line drawings 3 View
2003-04-23 OATH Oath or Declaration filed 4 View
2003-04-23 WCLM Claims Worksheet (PTO-2022) 1 View
2003-04-23 WFEE Fee Worksheet (SB06) 1 View
2003-04-23 WFEE Fee Worksheet (SB06) 1 View
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this application's details
Quick Facts
Patent No.
US 6,798,168
App. No.
10/421,269
Filed
2003-04-23
Granted
2004-09-28
Art Unit
2838
PTA
-57 days