IP Library Granted Patent US 7,286,916
Granted Patent B2
US 7,286,916 · App. 10/481,258 · Granted Oct 23, 2007

Method for determining the time and extent of maintenance operations

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,286,916
App. No.
10/481,258
Granted
Oct 23, 2007
Kind
B2
Abstract

In a method for defining the time and scope of maintenance operations for a system having a plurality of maintenance items, each of which should be carried out within an assigned tolerance range, a minimum maintenance interval between successive maintenance operations is predefined. The timing of a maintenance operation is predictively fixed at at least that tolerance range end point which is the first of the tolerance range end points of maintenance items relating to maintenance times to follow the time of a preceding maintenance operation while complying with the minimum maintenance interval. At least those maintenance operations whose tolerance range end points occur before the predicted subsequent maintenance time are defined as the scope of the imminent maintenance operation.

Claims (9)

1. A method for determining timing and scope of maintenance operations for a system having a plurality of maintenance items, said method comprising:

predefining associated maintenance intervals and tolerance ranges for implementing the maintenance items;

predefining a minimum maintenance interval between an imminent maintenance operation and a subsequent maintenance operation;

establishing a predicted time for a next subsequent maintenance operation, at the latest, at the time of a tolerance range end point which occurs first after expiration of the predefined minimum maintenance interval following the time of a preceding maintenance operation; and

designating as maintenance items to be carried out during the imminent maintenance operation at least those maintenance items whose tolerance range end points occur before the predicted subsequent maintenance time.

2. The method as claimed in claim 1 , wherein:

each maintenance item is composed of at least one maintenance secondary item; and

when a maintenance sequence for a respective maintenance operation is created, maintenance secondary items for the maintenance items to be carried out are tested with respect to the possibility of combining them.

3. The method as claimed in claim 1 , wherein in designating maintenance items to be carried out during an imminent maintenance operation, an optimization algorithm is implemented which includes advancing maintenance items from subsequent maintenance operations to earlier maintenance operations on a test basis, based on a secondary condition that the predefined minimum maintenance interval is complied with, and that an amount of the maintenance costs according to a cost function is optimized.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE APPLICATION NO. 10/567,810 PREVIOUSLY RECORDED ON REEL 020976 FRAME 0889. ASSIGNOR(S) HEREBY CONFIRMS THE CHANGE OF NAME. Recorded Jul 1, 2020
From: DAIMLERCHRYSLER AG
To: DAIMLER AG
Reel/Frame 053583/0493 →
CHANGE OF NAME Recorded May 14, 2008
From: DAIMLERCHRYSLER AG
To: DAIMLER AG
Reel/Frame 020976/0889 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 24, 2005
From: HOEFLACHER, ROBERT; KAUFMANN, RAINER; KOSTELEZKY, WALTER; LAY, KURT; REIGER, RUPERT
To: DAIMLERCHRYSLER AG
Reel/Frame 016394/0071 →