IP Library Granted Patent US 6,994,527
Granted Patent B2
US 6,994,527 · App. 10/481,750 · Granted Feb 7, 2006

Process and a device for transport of gas

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,994,527
App. No.
10/481,750
Granted
Feb 7, 2006
Kind
B2
Abstract

The present invention provides a process and a device for transport of gas in a main duct with more than two branch ducts wherein the gas is guided through the branch ducts ( 1, 2, 3, 4, 5, 6, 7, 8 ) and into the main duct (A) with a direction which is parallel to the direction of the flow in the main duct, while the gas in the branch duct at the inlet to the main duct is kept at a higher velocity than the gas in the main duct and the gas in the main duct is given an impulse, by utilisation of excess energy from the gas in the branch duct, for acceleration of the gas prior to introduction into the main duct.

Claims (21)

1. A process for transport of gas in a main duct with more than two branch ducts, each one of the more than two branch ducts having a nozzle, wherein

a) the gas is brought through the more than two branch ducts and from the more than two branch ducts into the main duct in a flow direction parallel to the flow direction of the gas in the main duct;

b) the gas in each one of the more than two branch ducts is, at the inlet to the main duct from the more than two branch ducts, kept at a higher velocity than the gas in the main duct;

c) the gas in the main duct is given an impulse by utilization of excess energy from the gas in each one of the more than two branch ducts for acceleration of the gas from each one of the more than two branch ducts prior to the introduction of the gas from each one of the more than two branch ducts into the main duct; and

d) the gas velocity in each one of the more than two branch ducts is adjustable by adjusting the position of a flap in the nozzle in each one of the more than two branch ducts.

2. The process of claim 1 wherein the gas velocity exiting from each one of the more than two branch ducts is kept 10–100% higher than the gas velocity in the main duct.

3. The process of claim 2 wherein the gas velocity in each one of the more than two branch ducts is kept lower than the gas velocity in the main duct.

4. The process of claim 3 wherein the gas velocity in each one of the more than two branch ducts is kept 10–50% lower than the gas velocity in the main duct.

5. The process of claim 1 wherein the gas in the main duct is gradually increased to the desired gas velocity after the introduction into the main duct of the gas from each one of the more than two branch ducts.

6. The process of claim 1 wherein the gas velocity of the gas that is introduced into the main duct from each one of the more than two branch ducts is increased prior to the introduction of the gas into the main duct from each succeeding one of the more than two branch ducts.

7. A process for transport of gas in a main duct with more than two branch ducts wherein

a) the gas is brought through the more than two branch ducts and from the more than two branch ducts into the main duct in a flow direction parallel to the flow direction of the gas in the main duct;

b) the gas in each one of the more than two branch ducts is, at the inlet to the main duct from the more than two branch ducts, kept at a higher velocity than the gas in the main duct;

c) the gas in the main duct is given an impulse by utilization of excess energy from the gas in each one of the more than two branch ducts for acceleration of the gas from each one of the more than two branch ducts prior to the introduction of the gas from each one of the more than two branch ducts into the main duct; and

d) the gas velocity in each one of the more than two branch ducts is adjustable by throttling.

8. A device for transport of gas in a main duct with more than two branch ducts, each one of the more than two branch ducts having an inlet and an outlet, wherein

a) the more than two branch ducts has a flow of gas therethrough and a flow of gas is provided from the more than two branch ducts into the main duct in a flow direction parallel to the flow direction of the gas in the main duct;

b) each one of the more than two branch ducts is provided with a reduction in the cross-section thereof adjacent the outlet thereof in the form of an adjustable flap for adjusting by means of the adjustable flap the velocity of the gas in each one of the more than two branch ducts; and

c) each one of the more than two branch ducts introduces the gas from each one of the more than two branch ducts into the main duct such that the gas introduced into the main duct from each one of the more than two branch ducts provides an impulse to the gas in the main duct by utilization of excess energy from the gas from each one of the more than two branch ducts from the acceleration of the gas in each one of the more than two branch ducts prior to the introduction into the main duct of the gas from each one of the more than two branch ducts.

9. The device of claim 8 wherein the gas in the main duct is gradually increased to the desired gas velocity after the introduction into the main duct of the gas from each one of the more than two branch ducts.

10. The device of claim 8 wherein the gas velocity of the gas that is introduced into the main duct from each one of the more than two branch ducts is increased prior to the introduction of the gas into the main duct from each succeeding one of the more than two branch ducts.

Assignments (3)
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 1, 2004
From: ALSTOM (SWITZERLAND) LTD.
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 016030/0601 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 15, 2004
From: STRAND, ODD; BJARNO, ODD; JOHANSSON, LARS-ERIK
To: ALSTOM (SWITZERLAND) LTD.
Reel/Frame 015275/0601 →