IP Library Granted Patent US 7,100,674
Granted Patent B2
US 7,100,674 · App. 10/535,216 · Granted Sep 5, 2006

Method of startup procedure of strip in the twin roll strip casting process

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,100,674
App. No.
10/535,216
Granted
Sep 5, 2006
Kind
B2
Abstract

Disclosed herein is a method for drawing a strip initially cast by means of a twin roll strip casting apparatus. The method comprises a roll gap maintenance step where roll gap is maintained, a casting initiation step where a stopper is disengaged from a tundish hole so that molten metal is poured into a space between the rolls, and the rolls are rotated at speed v 0 of each of the rolls if the position of the stopper is higher than the actually poured position of the molten metal, a casting speed acceleration step where a roll repulsive force is detected when the molten metal is solidified to the leader strip and passes between the rolls, and the casting speed is accelerated if the roll repulsive force reaches a load threshold, and a normal control step where the casting speed is detected, and if the casting speed reaches a target value.

Claims (8)

1. A method for drawing a strip cast by means of a twin roll strip casting apparatus, comprising the steps of:

maintaining a roll gap so that a leader strip having a length l 0 disposed above a roll nip does not fall between rolls;

initiating the casting by disengaging a stopper from a tundish hole of a tundish so that molten metal is poured into a space between the rolls, and by rotating the rolls at an initial casting speed v 0 for each of the rolls when the position of the stopper is higher than the position where the molten metal (rod_offset) begins to pour from the tundish hole;

accelerating the casting speed when a roll repulsive force (rolling force) is detected as reaching a load threshold indicating that the molten metal is solidified to the leader strip and passing between the rolls; and

maintaining the casting speed when the casting speed reaches a target value (normal casting speed).

2. The method as set forth in claim 1 , wherein the length l 0 of the leader strip is selected so that initial solidification is completed before the leader strip completely passes through the roll nip.

3. The method as set forth in claim 1 , wherein the accelerating step further comprises the step of controlling the roll repulsive force when the roll repulsive force (rolling force) reaches the load threshold.

4. The method asset forth in claim 1 , wherein the initial casting speed v 0 is set to l 0 /Δt, where Δt, is the time period from the time where the casting process is initiated to the time where the roll repulsive force reaches the load threshold.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 4, 2023
From: POSCO HOLDINGS INC.; RESEARCH INSTITUTE OF INDUSTRIAL SCIENCE & TECHNOLOGY
To: POSCO CO., LTD; RESEARCH INSTITUTE OF INDUSTRIAL SCIENCE & TECHNOLOGY
Reel/Frame 063212/0033 →
CHANGE OF NAME Recorded Sep 28, 2022
From: POSCO
To: POSCO HOLDINGS INC.
Reel/Frame 061562/0041 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 2, 2005
From: KIM, YOON-HA; KIM, WAN-SOO; LEE, DAE-SUNG
To: POSCO CO., LTD.; RESEARCH INSTITUTE OF INDUSTRIAL SCIENCE & TECHNOLOGY
Reel/Frame 016944/0435 →