IP Library Granted Patent US 7,461,514
Granted Patent B2
US 7,461,514 · App. 10/537,257 · Granted Dec 9, 2008

Method for energy management of air-conditioning units

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,461,514
App. No.
10/537,257
Granted
Dec 9, 2008
Kind
B2
Abstract

A method for energy management of air-conditioning units in motor vehicles in which each of the air-conditioning units has a plurality of air-conditioning compressors prevents very heavy loading of an engine of a motor vehicle and prevents the engine from almost stalling when the air-conditioning compressors start up, as currently occurs during starting of the engine of the motor vehicle, after idling of the engine of the motor vehicle, and after an acceleration process in which the engine was in the full load mode. Each of the air-conditioning compressors is allocated a different priority, with the highest priority, for example, assigned to the air-conditioning compressor for a front vehicle region which is intended, inter alia, to prevent the front windscreen from misting up by removing moisture from the air. A lower priority can be assigned to the air-conditioning compressor for a rear vehicle region. If one of the states specified above is detected during determination of a state, each of the air-conditioning compressors is switched on but successively delayed by a predetermined switch-on delay time in accordance with this allocated priority in response to request signals. In contrast, deactivation can take place simultaneously.

Claims (23)

1. A method for energy management of an air-conditioning unit in a motor vehicle, the air-conditioning unit having a plurality of air-conditioning compressors, comprising:

allocating priorities to each of at least two air-conditioning compressors of the air-conditioning unit,

determining whether an engine of the motor vehicle is newly started, in the idling mode, or in a full load mode, and therefore an acceleration bit by which the air-conditioning compressors have been switched off is set,

executing a conventional air-conditioning unit regulating process when the engine is not newly started, the engine is not in the idling mode, and the engine is not in the full load mode, and

actuating the air-conditioning compressors in a priority sequence determined by the priorities allocated, with actuation of each of the air-conditioning compressors being offset by a time, when the engine is newly started, the engine is in the idling mode, or the engine is in the full load mode.

2. The method of claim 1 , wherein the time is a respective predefined time which is dependent on at least one of a design, a size, an ambient temperature, and a coolant pressure of at least one of the air-conditioning compressors.

3. The method of claim 2 , wherein the priorities are allocated in such a way that an air-conditioning compressor which is assigned to a front vehicle region has a higher priority than an air-conditioning compressor which is assigned to a rear vehicle region.

4. The method of claim 2 , and further comprising checking whether an air-conditioning unit request signal is present when the engine is in the idling mode, simultaneously outputting an air-conditioning compressor actuating signal and an anticipated air-conditioning compressor torque to an engine control device when the air-conditioning unit request signal is present, calculating a load increase signal as a function of the air-conditioning compressor torque with the engine control device and outputting the load increase signal to the engine after a predetermined time, and outputting a compressor flow which corresponds to the load increase signal with a switch-on delay time by the engine to the air-conditioning compressor, firstly for an air-conditioning compressor with the highest priority, and then, after a predefined time, for an air-conditioning compressor with the next highest priority.

5. The method of claim 4 , and further comprising checking whether a deactivating switch for deactivation of the air-conditioning unit has been operated during the switch-on delay time, switching off all the air-conditioning compressors of the associated cooling circuit and again determining whether the engine is newly started when the deactivating switch has been operated, and, otherwise, when an air-conditioning compressor with the next highest priority is present, again outputting the air-conditioning compressor actuating signal and the anticipated air-conditioning compressor torque to the engine control device.

6. The method of claim 1 , wherein the time is a predefined time of approximately 3 seconds.

7. The method of claim 1 , wherein the priorities are allocated in such a way that an air-conditioning compressor which is assigned to a front vehicle region has a higher priority than an air-conditioning compressor which is assigned to a rear vehicle region.

8. The method of claim 7 , and further comprising checking whether an air-conditioning unit request signal is present when the engine is in the idling mode, simultaneously outputting an air-conditioning compressor actuating signal and an anticipated air-conditioning compressor torque to an engine control device when the air-conditioning unit request signal is present, calculating a load increase signal as a function of the air-conditioning compressor torque with the engine control device and outputting the load increase signal to the engine after a predetermined time, and outputting a compressor flow which corresponds to the load increase signal with a switch-on delay time by the engine to the air-conditioning compressor, firstly for an air-conditioning compressor with the highest priority, and then, after a predefined time, for an air-conditioning compressor with the next highest priority.

9. The method of claim 8 ,and further comprising checking whether a deactivating switch for deactivation of the air-conditioning unit has been operated during the switch-on delay time, switching off all the air-conditioning compressors of the associated cooling circuit and again determining whether the engine is newly started when the deactivating switch has been operated, and, otherwise, when an air-conditioning compressor with the next highest priority is present, again outputting the air-conditioning compressor actuating signal and the anticipated air-conditioning compressor torque to the engine control device.

10. The method of claim 1 , and further comprising checking whether an air-conditioning unit request signal is present when the engine is in the idling mode, simultaneously outputting an air-conditioning compressor actuating signal and an anticipated air-conditioning compressor torque to an engine control device when the air-conditioning unit request signal is present, calculating a load increase signal as a function of the air-conditioning compressor torque with the engine control device and outputting the load increase signal to the engine after a predetermined time, and outputting a compressor flow which corresponds to the load increase signal with a switch-on delay time by the engine to the air-conditioning compressor, firstly for an air-conditioning compressor with the highest priority, and then, after a predefined time, for an air-conditioning compressor with the next highest priority.

11. The method of claim 10 , and further comprising checking whether a deactivating switch for deactivation of the air-conditioning unit has been operated during the switch-on delay time, switching off all the air-conditioning compressors of the associated cooling circuit and again determining whether the engine is newly started when the deactivating switch has been operated, and, otherwise, when an air-conditioning compressor with the next highest priority is present, again outputting the air-conditioning compressor actuating signal and the anticipated air-conditioning compressor torque to the engine control device.

12. The method of claim 11 , and further comprising switching the air-conditioning compressor off over a predetermined time period when the acceleration bit is set, monitoring whether the acceleration bit remains set, speeding up the air-conditioning compressor immediately and with a predefined gradient when the acceleration bit is no longer set, ending the deactivation of the air-conditioning compressor over the predetermined time period and powering up the air-conditioning compressor again with the predefined gradient when the acceleration bit remains set, and repeating the switching, monitoring, speeding up and ending acts for the air-conditioning compressor with the next highest priority.

13. The method of claim 12 , and further comprising determining the external temperature before switching the air-conditioning compressor off and deciding whether the external temperature is above a predetermined threshold value, selecting the predetermined time period as a function of whether the external temperature is above or below the threshold value, and determining the gradient during speeding up or powering up of the air-conditioning compressor depending on whether the external temperature is above the threshold value.

14. The method of claim 10 , and further comprising switching the air-conditioning compressor off over a predetermined time period when the acceleration bit is set, monitoring whether the acceleration bit remains set, speeding up the air-conditioning compressor immediately and with a predefined gradient when the acceleration bit is no longer set, ending the deactivation of the air-conditioning compressor over the predetermined time period and powering up the air-conditioning compressor again with the predefined gradient when the acceleration bit remains set, and repeating the switching, monitoring, speeding up and ending acts for the air-conditioning compressor with the next highest priority.

15. The method of claim 14 , and further comprising determining the external temperature before switching the air-conditioning compressor off and deciding whether the external temperature is above a predetermined threshold value, selecting the predetermined time period as a function of whether the external temperature is above or below the threshold value, and determining the gradient during speeding up or powering up of the air-conditioning compressor depending on whether the external temperature is above the threshold value.

16. The method of claim 1 , and further comprising switching the air-conditioning compressor off over a predetermined time period when the acceleration bit is set, monitoring whether the acceleration bit remains set, speeding up the air-conditioning compressor immediately and with a predefined gradient when the acceleration bit is no longer set, ending the deactivation of the air-conditioning compressor over the predetermined time period and powering up the air-conditioning compressor again with the predefined gradient when the acceleration bit remains set, and repeating the switching, monitoring, speeding up and ending acts for the air-conditioning compressor with the next highest priority.

17. The method of claim 16 , and further comprising determining the external temperature before switching the air-conditioning compressor off and deciding whether the external temperature is above a predetermined threshold value, selecting the predetermined time period as a function of whether the external temperature is above or below the threshold value, and determining the gradient during speeding up or powering up of the air-conditioning compressor depending on whether the external temperature is above the threshold value.

18. The method of claim 1 , wherein the determining acts are carried out in a different sequence.

19. The method of claim 1 , wherein the determining acts are carried out simultaneously.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE APPLICATION NO. 10/567,810 PREVIOUSLY RECORDED ON REEL 020976 FRAME 0889. ASSIGNOR(S) HEREBY CONFIRMS THE CHANGE OF NAME. Recorded Jul 1, 2020
From: DAIMLERCHRYSLER AG
To: DAIMLER AG
Reel/Frame 053583/0493 →
CHANGE OF NAME Recorded May 14, 2008
From: DAIMLERCHRYSLER AG
To: DAIMLER AG
Reel/Frame 020976/0889 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 25, 2005
From: ROEHM, ROLF; SEILER, BERND
To: DAIMLERCHRYSLER AG
Reel/Frame 017133/0173 →