US 7,533,620 · App. 10/542,749 · Granted May 19, 2009

Combustion installation with CO

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,533,620
App. No.
10/542,749
Granted
May 19, 2009
Kind
B2
Abstract

An installation for combustion ( 1 ) of carbon-containing solids includes an oxide reducing reactor ( 2 ), a first cyclone ( 5 ), a recuperator ( 6 ), an oxidation reactor ( 3 ), a second cyclone ( 4 ), wherein flows an oxide which is reduced then oxidized in each of the two reactors ( 2 and 3 ). In the installation, the fuel is ground before being introduced into the reduction reactor ( 3 ). The reduced size of the solid fuel particles enables more complete and faster combustion and enables almost 100% production of fly ashes which are separated from the circulating oxides.

Claims (24)

1. A combustion installation for burning carbon-containing solid material that operates at atmospheric pressure, said installation comprising:

a reduction reactor having a fluidized bed that receives the carbon-containing material to reduce an oxide, wherein the carbon-containing solid material is ground before entering the reduction reactor,

an oxidation reactor having a fluidized bed that oxidizes the oxide,

a first cyclone that receives solid oxide particles and fly ash from the reducer reactor, and separates the solid oxide particles from the fly ash wherein the solid oxide particles are provided to the oxidation reactor,

a first exchanger that receives the fly ash from the first cyclone,

a second cyclone that separates the solid oxide particles and gas from the oxidation reactor wherein the solid oxide particles are provided to the reduction reactor, and

a second exchanger that receives the gas from the second cyclone.

2. A combustion installation according to claim 1 , wherein concentrated CO 2 exits from the first cyclone to the first exchanger and the gas exiting the second cyclone is combustion air.

3. A combustion installation according to claim 1 , wherein the carbon-containing solid material is coal.

4. A combustion installation according to claim 3 , wherein after grinding, the coal has an average particle diameter of less than 500 μ.

5. A combustion installation according to claim 1 , wherein the fluidized bed of the reduction reactor is fluidized with steam.

6. A combustion installation according to claim 5 , wherein the fluidized bed of the reduction reactor is fluidized with CO 2 released from the reduction reactor.

7. A combustion installation according to claim 1 , wherein the first cyclone separates a mixture of solid oxide particles and carbon-containing residue from the fly ash, and further including a dedicated elimination device having a fluidized bed to separate the carbon-containing residue and the solid oxide particles, wherein the solid oxide particles are provided to the oxidation reactor.

8. A combustion installation according to claim 1 , wherein the be of the elimination device is fluidized by steam.

9. A combustion installation according to claim 8 , wherein the carbon-containing residue is entrained with the steam and fed to the reduction reactor.

10. A combustion installation according to claim 1 , further including a fluidized bed heat exchanger having a fluidized bed exterior of the oxidation reactor, wherein the fluidized bed heat exchanger receives solid oxide particles from the second cyclone and provides the solid oxide particles to the oxidation reactor.

11. A combustion installation according to claim 1 , further comprising a separator that separates the solid oxide particles from the fly ash received from the first cyclone.

12. A combustion installation according to claim 1 , wherein the oxidize is a metal oxide.

13. A combustion installation according to claim 12 , wherein the metal oxide is based on iron.

14. A combustion installation according to claim 11 , further including a silo that stores the solid oxide particles provided by the separator and provides the stored solid oxide particles to the oxidation reactor.

15. A combustion installation according to claim 1 , further comprising a siphon that receives the solid oxide material from the first cyclone and provides the solid oxide materials to the oxidation reactor and the reduction reactor.

16. A combustion installation according to claim 1 , further comprising a siphon that receives the solid oxide material from the second cyclone and provides the solid oxide materials to the oxidation reactor and the reduction reactor.

17. A combustion installation according to claim 10 , further comprising a siphon that receives the solid oxide material from the second cyclone and provides the solid oxide materials to the fluidized bed heat exchanger, the oxidation reactor, and the reduction reactor.

18. A combustion installation according to claim 1 , wherein the carbon-containing solid material is ground to a particle size such that accumulation of coarse ash at the bottom of the reduction reactor is prevented.