IP Library Granted Patent US 7,762,079
Granted Patent B2
US 7,762,079 · App. 10/595,992 · Granted Jul 27, 2010

Procedure for controlling the useful life of the gas turbines of a plant

Assignee: Nuovo Pignone Holding S.p.A.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,762,079
App. No.
10/595,992
Granted
Jul 27, 2010
Kind
B2
Abstract

A method for controlling the useful life of gas turbines of a production plant includes a) creating a succession of gas generator groups of gas turbines to be subjected to maintenance, b) substituting a first gas generator group of gas turbines of the succession with an auxiliary gas generator group, c) inspecting the first substituted gas generator group of gas turbines, d) substituting a second gas generator group of gas turbines of the succession with the first verified gas generator group of gas turbines, e) inspecting the second substituted gas generator group of gas turbines, and f) repeating steps b), c) d) and e) for all the gas generator groups of gas turbines of the succession.

Claims (18)

1. A method for controlling the useful life of gas turbines of a production plant including a series of production trains and an auxiliary gas generator group, each production train of said series of trains being in turn equipped with a series of gas turbine groups, each of which in turn includes a gas generator, the method comprising:

a) creating a succession of gas generator groups of gas turbines to be subjected to maintenance;

b) substituting a first gas generator group of gas turbines of said succession with said auxiliary gas generator group, to keep the production plant functioning with less interruptions;

c) inspecting the first substituted gas generator group of gas turbines, by subjecting it to ordinary maintenance operations;

d) substituting a second gas generator group of gas turbines of said succession with said first verified gas generator group of gas turbines;

e) inspecting the second substituted gas generator group of gas turbines, by subjecting it to ordinary maintenance operations; and

f) repeating said steps b), c) d) and e) for all the gas generator groups of gas turbines of said succession until all the gas generator groups of the gas turbines of said production plant have been subjected to maintenance.

2. The method for controlling the useful life of the gas turbines of a plant according to claim 1 , comprising:

stoppinq, during the substitution phases of the gas generator groups of gas turbines of said succession, only the group of gas turbines to be substituted.

3. The method for controlling the useful life of the gas turbines of a plant according to claim 1 , comprising:

stopping, during the substitution operations of said gas generator groups of gas turbines, the group to be substituted only for a minimum time necessary for effecting the substitution.

4. The method for controlling the useful life of the gas turbines of a plant according to claim 1 , comprising:

substituting the second gas generator group of gas turbines at the end of step c), with the first controlled gas generator group of gas turbines

5. The method for controlling the useful life of the gas turbines of a plant according to claim 1 , wherein said production plant comprises four production trains.

6. The method for controlling the useful life of the gas turbines of a plant according to claim 1 , wherein each production train of said series of trains comprises two groups of gas turbines for liquefying gas by compression and/or cooling.

7. The method for controlling the useful life of the gas turbines of a plant according to claim 1 , wherein each gas generator group comprises at least a number of gas generators equal to the number of gas turbines present in the group of gas turbines.

8. The method for controlling the useful life of the gas turbines of a plant according to claim 7 , wherein said gas turbine is a heavy duty gas turbine.

9. The method for controlling the useful life of the gas turbines of a plant according to claim 1 , wherein said gas generator comprises a power turbine and a discharge outlet.

Assignments (4)
NUNC PRO TUNC ASSIGNMENT Recorded May 31, 2022
From: NUOVO PIGNONE S.R.L.
To: NUOVO PIGNONE TECNOLOGIE S.R.L.
Reel/Frame 060243/0913 →
NUNC PRO TUNC ASSIGNMENT Recorded May 25, 2022
From: NUOVO PIGNONE INTERNATIONAL S.R.L.
To: NUOVO PIGNONE S.R.L.
Reel/Frame 060441/0662 →
NUNC PRO TUNC ASSIGNMENT Recorded May 23, 2022
From: NUOVO PIGNONE HOLDING S.P.A.
To: NUOVO PIGNONE INTERNATIONAL S.R.L.
Reel/Frame 059989/0991 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 24, 2006
From: GUGLIOTTA, GIUSEPPE; NUZZI, GIUSEPPE; CORZI, VINCENZO
To: NUOVO PIGNONE HOLDING S.P.A.
Reel/Frame 017668/0926 →
Priority Claims (1)
IT MI2003A2324 · Nov 27, 2003 · national
Continuity (1)
Related Publication 20080314046A1 · Dec 25, 2008