IP Library Granted Patent US 7,230,543
Granted Patent B2
US 7,230,543 · App. 10/618,269 · Granted Jun 12, 2007

Downhole clock synchronization apparatus and methods for use in a borehole drilling environment

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,230,543
App. No.
10/618,269
Granted
Jun 12, 2007
Kind
B2
Abstract

Geophysical measurement system employed during the drilling of a well borehole. The system employs a reference clock disposed within equipment at the surface of the earth and a borehole assembly which houses a downhole clock and at least one sensor. The borehole assembly is operationally connected to a drill string, which advances the borehole. At least one synchronization shuttle apparatus containing a shuttle clock is conveyed downhole to the borehole assembly to synchronize the borehole clock with the reference clock. Reference and borehole clock synchronization is maintained at one millisecond or less over a period of days. Outputs from the reference clock and borehole clock and sensor are combined to obtain a measure of a geophysical parameter of interest. Although the measurement system is particularly applicable to seismic-while-drilling measurements, it can be used in a wide variety of clock driven geophysical measurements.

Claims (95)

1. A shuttle for synchronizing a reference clock with downhole clock positioned within a borehole, said shuttle comprising;

(a) a shuttle clock;

(b) a data port operationally connected to said shuttle clock; and

(c) a pressure housing in which said shuttle clock and said data port are incorporated; wherein

(d) said shuttle clock is synchronized with said reference clock via a first transmission link provided by said data port;

(e) said shuttle is conveyed along said borehole to said downhole clock by pumped drilling fluid;

(f) said downhole clock is synchronized with said shuttle clock via a second transmission link provided by said data port thereby providing synchronization of said downhole clock with said reference clock; and

(g) said pressure housing is deformed thereby allowing disposal of said shuttle within said borehole after said downhole clock is synchronized with said shuttle clock via said second transmission link.

2. The shuttle of claim 1 wherein said data port comprises a short range radio frequency transmitter and a radio frequency receiver and an antenna operationally connected to said transmitter and said receiver.

3. The shuttle of claim 1 wherein said data port comprises a wet connector.

4. The shuttle of claim 1 wherein said downhole clock is incorporated within a seismic-while-drilling system.

5. The shuttle of claim 1 wherein said downhole clock is incorporated within a nuclear spectroscopy logging-while-drilling system.

6. The shuttle of claim 1 wherein said downhole clock is incorporated within a pulsed neutron logging-while-drilling system.

7. A method for synchronizing a reference clock and a downhole clock positioned within a borehole with, the method comprising;

(a) providing a shuttle comprising

(i) a shuttle clock, and

(ii) a data port operationally connected to said shuttle clock;

(b) synchronizing said shuttle clock with said reference clock via a first transmission link provided by said data port;

(c) conveying said shuttle along said borehole to said downhole clock by pumped drilling fluid;

(d) synchronizing said downhole clock with said shuttle clock via a second transmission link provided by said data port thereby providing synchronization of said downhole clock with said reference clock:

(e) providing a pressure housing suitable for disposal;

(f) incorporating said shuttle clock and said data port within said pressure housing;

(g) synchronizing said downhole clock with said shuttle clock via said second transmission link; and

(h) subsequently disposing of said shuttle within said borehole.

8. The method of claim 7 wherein said downhole clock is incorporated within a seismic-while-drilling system.

9. The method of claim 7 wherein said downhole clock is incorporated within a nuclear spectroscopy logging-while-drilling system.

10. The method of claim 7 wherein said downhole clock is incorporated within a pulsed neutron logging-while-drilling system.

11. A measurement system for determining a geophysical parameter in the vicinity of a borehole, the system comprising:

(a) surface equipment comprising a reference clock;

(b) a plurality of shuttles each comprising a shuttle clock and a data port; and

(c) a borehole assembly comprising at least one sensor and a downhole clock; wherein;

(d) a synchronization procedure synchronizes said downhole clock with said reference clock by

(i) synchronizing said shuttle clock with said reference clock via said data port,

(ii) subsequently launching at least one shuttle into a first end of a drill string,

(iii) conveying said at least one shuttle by means of pumped drilling fluid to said borehole assembly which terminates a second end of said drill string,

(iv) synchronizing said downhole clock with said shuttle clock via said data port to obtain said reference clock and downhole clock synchronization;

(e) outputs from said reference clock and from said downhole clock and from said at least one sensor are combined to determine said geophysical parameter; and

(f) each shuttle of said plurality of shuttles is launched sequentially at time intervals required to maintain said reference clock and shuttle clock synchronization within a predetermined limit.

12. A measurement system for determining a geophysical parameter in the vicinity of a borehole, the system comprising:

(a) surface equipment comprising a reference clock;

(b) at least one shuttle comprising a shuttle clock and a data port;

(c) a borehole assembly comprising at least one sensor and a downhole clock; and

(d) a telemetry system linking said borehole assembly to said surface equipment; wherein

(e) a synchronization procedure synchronizes said downhole clock with said reference clock by

(i) synchronizing said shuttle clock with said reference clock via said data port,

(ii) subseciuently launching at least one said shuttle into a first end of a drill string,

(iii) conveying said at least one shuttle by means of pumped drilling fluid to said borehole assembly which terminates a second end of said drill string,

(iv) synchronizing said downhole clock with said shuttle clock via said data port to obtain said reference clock and downhole clock synchronization;

(f) outputs from said reference clock and from said downhole clock and from said at least one sensor are combined to determine said geophysical parameter;

(g) one said shuttle is launched at time interval required to maintain said reference clock and shuttle clock synchronization within a predetermined limit; and

(h) durations of said time interval is determined using information telemetered from said borehole assembly to said surface equipment via said telemetry system.

13. The measurement system of claim 12 wherein said data port comprises a short range radio frequency transmitter and a radio frequency receiver and an antenna operationally connected to said transmitter and said receiver.

14. The measurement system of claim 12 wherein said data port comprises a wet connector.

15. The measurement system of claim 12 wherein said at least one sensor comprises a seismic sensor.

16. A measurement system for determining a geophysical parameter in the vicinity of a borehole, the system comprising:

(a) surface ecluipment comprising a reference clock;

(b) at least one shuttle comprising a shuttle clock and a data port; and

(c) a borehole assembly comprising at least one sensor and a downhole clock; wherein

(d) a synchronization procedure synchronizes said downhole clock with said reference clock by

(i) synchronizing said shuttle clock with said reference clock via said data port.

(ii) subsequently launching at least one said shuttle into a first end of a drill string,

(iii) conveying said at least one shuttle by means of pumped drilling fluid to said borehole assembly which terminates a second end of said drill string,

(iv) synchronizing said downhole clock with said shuttle clock via said data port to obtain said reference clock and downhole clock synchronization; and

(e) outputs from said reference clock and from said downhole clock and from said at least one sensor are combined to determine said geophysical parameter; and

(f) each said shuttle further comprises a pressure housing in which said shuttle clock and said data port are incorporated, wherein said pressure housing is deformed thereby allowing disposal of said shuttle within said borehole after synchronizing said downhole clock with said shuffle clock via said data port to obtain said reference clock and downhole clock synchronization.

17. A method for determining a geophysical parameter in the vicinity of a borehole, the system comprising:

(a) providing surface euuipment comprising a reference clock;

(b) providing a plurality of shuttles each comprising a shuttle clock and a data port;

(c) providing a borehole assembly comprising at least one sensor and a downhole clock;

(d) synchronizing said downhole clock with said reference clock by

(i) synchronizing said shuttle clock with said reference clock via said data port,

(ii) subsequently launching at least one said shuttle into a first end of a drill string,

(iii) conveying said at least one shuttle by means of pumped drilling fluid to said borehole assembly which terminates a second end of said drill string,

(iv) synchronizing said downhole clock with said shuttle clock via said data port to obtain said reference clock and downhole clock synchronization to within a predetermined limit;

(e) combining outputs from said reference clock and from said downhole clock and from said at least one sensor to determine said geophysical parameter; and

(f) launching each shuffle of said plurality of shuttles sequentially at time intervals required to maintain said reference clock and shuttle clock synchronization within a predetermined limit.

18. The method of claim 17 further comprising the additional steps of:

(a) linking said borehole assembly to said surface equipment with a telemetry system; and

(b) determining durations of said time intervals using information telemetered from said borehole assembly to said surface equipment via said telemetry system.

19. The method of claim 17 wherein said data port comprises a short range radio frequency transmitter and a radio frequency receiver and an antenna operationally connected to said transmitter and said receiver.

20. The method of claim 17 wherein said data port comprises a wet connector.

21. The method of claim 17 wherein said at least one sensor comprises a seismic sensor.

22. A method for determining a geophysical parameter in the vicinity of a borehole, the system comprising:

(a) providing surface equipment comprising a reference clock;

(b) providing at least one shuttle comprising a shuttle clock and a data port;

(c) providing a borehole assembly comprising at least one sensor and a downhole clock;

(d) synchronizing said downhole clock with said reference clock by

(i) synchronizing said shuttle clock with said reference clock via said data port,

(ii) subsequently launching at least one said shuttle into a first end of a drill string,

(iii) conveying said at least one shuttle by means of pumped drilling fluid to said borehole assembly which terminates a second end of said drill string,

(iv) synchronizing said downhole clock with said shuttle clock via said data port to obtain said reference clock and downhole clock synchronization to within a predetermined limit;

(e) combining outputs from said reference clock and from said downhole clock and from said at least one sensor to determine said geophysical parameter;

(f) providing a pressure housing for each said shuttle in which said shuttle clock and said data port are incorporated; and

(g) deforming each said pressure housing thereby allowing disposal of said shuttle within said borehole after synchronizing said downhole clock with said shuttle clock via said data port to obtain said reference clock and downhole clock synchronization.

23. The method of claim 22 wherein said predetermined limit is one millisecond or less.

Assignments (12)
PATENT SECURITY INTEREST ASSIGNMENT AGREEMENT Recorded Apr 26, 2023
From: DEUTSCHE BANK TRUST COMPANY AMERICAS
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 063470/0629 →
SECURITY INTEREST Recorded Oct 1, 2021
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; WEATHERFORD U.K. LIMITED
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 057683/0706 →
RELEASE OF SECURITY INTEREST Recorded Oct 1, 2021
From: WILMINGTON TRUST, NATIONAL ASSOCIATION
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
Reel/Frame 057683/0423 →
SECURITY INTEREST Recorded Aug 28, 2020
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 054288/0302 →
RELEASE OF SECURITY INTEREST Recorded Aug 28, 2020
From: WELLS FARGO BANK, NATIONAL ASSOCIATION
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
Reel/Frame 053838/0323 →
SECURITY INTEREST Recorded Dec 26, 2019
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: DEUTSCHE BANK TRUST COMPANY AMERICAS, AS ADMINISTRATIVE AGENT
Reel/Frame 051419/0140 →
SECURITY INTEREST Recorded Dec 18, 2019
From: WEATHERFORD TECHNOLOGY HOLDINGS LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY INC.; PRECISION ENERGY SERVICES INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: WELLS FARGO BANK NATIONAL ASSOCIATION AS AGENT
Reel/Frame 051891/0089 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 22, 2017
From: WEATHERFORD CANADA PARTNERSHIP
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC
Reel/Frame 042457/0086 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 26, 2006
From: PRECISION ENERGY SERVICES ULC
To: WEATHERFORD CANADA PARTNERSHIP
Reel/Frame 017527/0191 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 24, 2006
From: PRECISION ENERGY SERVICES LTD.
To: PRECISION ENERGY SERVICES ULC
Reel/Frame 017519/0043 →
CHANGE OF NAME Recorded Apr 21, 2006
From: PRECISION DRILLING TECHNOLOGY SERVICES GROUP INC.
To: PRECISION ENERGY SERVICES LTD.
Reel/Frame 017507/0063 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 9, 2003
From: MINTO, JAMES; SORRELLS, MARTIN; HARVEY, PETER
To: PRECISION DRILLING TECHNOLOGY SERVICES GROUP INC.
Reel/Frame 014292/0635 →