IP Library Granted Patent US 7,388,681
Granted Patent B2
US 7,388,681 · App. 10/629,492 · Granted Jun 17, 2008

Method for scanning maintenance prediction

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,388,681
App. No.
10/629,492
Granted
Jun 17, 2008
Kind
B2
Abstract

A method for predicting when maintenance is required for a scanner comprises tracking a quality parameter history in a scanner, predicting when maintenance is required based on the quality parameter history, and notifying a user when maintenance is predicted to be required based on a quality parameter trend. The quality parameter is selected from a group consisting of an average brightness, a maximum brightness, a video gradient, and a contrast.

Claims (23)

1. A process for predicting when maintenance is required for a scanner, the process comprising:

tracking in a scanner a quality parameter history in a scanner;

predicting when maintenance is required in the scanner based on the quality parameter history, wherein predicting when maintenance is required further comprises using a quality parameter history variable and a quality parameter time variable to determine a quality parameter trend and extrapolate the trend to determine when the quality parameter trend will cross a quality parameter limit; and

notifying a user when maintenance is predicted to be required in the scanner based on the quality parameter trend.

2. The process of claim 1 , wherein tracking a quality adjustment history further comprises recording a quality parameter history variable and a quality parameter time variable after a specified period of time.

3. The process of claim 1 , wherein tracking a quality adjustment history further comprises recording a quality parameter history variable and a quality parameter time variable after a specified number of images have been scanned.

4. The process of claim 1 , wherein tracking a quality adjustment history further comprises modifying a quality parameter history variable by an amount that a quality parameter change variable is different than a quality parameter threshold and to record a quality parameter time variable when the quality parameter change variable is modified.

5. The process of claim 1 , wherein predicting when maintenance is required further comprises using the quality parameter history variable and the quality parameter time variable in a quality parameter function to determine the quality parameter trend and extrapolate the trend to determine:

when the quality parameter trend will cross a quality parameter notification limit;

when the quality parameter trend will cross a quality parameter change limit; and

the difference between when the quality parameter trend will cross the quality parameter notification limit and the quality parameter change limit.

6. The process of claim 5 , wherein the quality parameter function comprises a quality parameter straight-line approximation function configured to determine a straight-line approximation of the quality parameter trend.

7. The process of claim 5 , wherein the quality parameter function comprises a quality parameter first order curve fitting approximation function configured to determine a curved-line approximation of the quality parameter trend.

8. The process of claim 1 , wherein notifying a user when maintenance is predicted to be required further comprises sending a notification signal when a quality parameter trend crosses a quality parameter notification limit, the notification signal comprising an estimated time difference between when the quality parameter trend crosses the quality parameter notification limit and when the quality parameter trend crosses a quality parameter change limit.

9. The process of claim 1 , wherein the quality parameter is selected from a group consisting of an average brightness, a maximum brightness, a video gradient, and a contrast.

10. A process for predicting maintenance for a scanner, the process comprising:

tracking in a scanner a quality parameter history;

using within the scanner a quality parameter history variable and a quality parameter time variable in a quality parameter function to determine a quality parameter trend and extrapolate the trend to determine:

when the quality parameter trend will cross a quality parameter notification limit;

when the quality parameter trend will cross a quality parameter change limit; and

the time difference between when the quality parameter trend will cross the quality parameter notification limit and the quality parameter change limit; and

sending from the scanner a notification signal when a quality parameter trend crosses a quality parameter notification limit, the notification signal comprising an estimated time difference between when the quality parameter trend crosses the quality parameter notification limit and when the quality parameter trend crosses a quality parameter change limit.

11. The process of claim 10 , wherein quality parameter is selected from the group consisting of average brightness, maximum brightness, video gradient, and contrast.

Assignments (2)
PATENT ASSIGNMENT AND RESERVATION Recorded Sep 4, 2012
From: INTERNATIONAL BUSINESS MACHINES CORPORATION
To: TOSHIBA GLOBAL COMMERCE SOLUTIONS HOLDINGS CORPORATION
Reel/Frame 028895/0935 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 29, 2003
From: PRAKASH, RAVINDER
To: INTERNATIONAL BUSINESS MACHINES CORPORATION
Reel/Frame 014355/0802 →