IP Library Granted Patent US 7,449,259
Granted Patent B2
US 7,449,259 · App. 10/654,872 · Granted Nov 11, 2008

Power converter architecture and method for integrated fuel cell based power supplies

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,449,259
App. No.
10/654,872
Granted
Nov 11, 2008
Kind
B2
Abstract

A fuel cell based power supply comprises a main power converter and control that allows the fuel cell stack to be electrically shorted from time-to-time to improve performance. Additionally, the power converter may temporarily disconnect the fuel cell stack from the load after shorting, allowing the fuel cell stack to return to an open circuit voltage, and/or provide current limiting during a period after shorting to provide stable operation while the fuel cell stack powers the load and recharges a power storage device.

Claims (38)

1. A method of operating a fuel cell system comprising a main power converter having a first side and a second side, a fuel cell stack electrically coupled to the first side of the main power converter and a load electrically coupled to the second side of the main power converter, the method comprising:

determining when to start a current pulsing operation; and

selectively operating switches in the first side of the main power converter to produce a high current pulse from the fuel cell stack during a current pulsing operation as at least a portion of the current pulsing operation.

2. The method according to claim 1 , further comprising:

driving an inductor electrically coupled in series with the fuel cell stack and at least one switch in the first side of the main power converter into saturation during the current pulsing operation.

3. The method of claim 2 wherein said step of selectively operating switches on the first side of the main power converter comprises selectively operating the switches on the first side of the main power converter to electrically short the fuel cell stack during the current pulsing operation.

4. The method of claim 2 wherein said step of determining when to start a current pulsing operation includes at least one of:

determining that a specified interval has passed; and

determining that a voltage across at least a portion of the fuel cell stack has dropped below a threshold voltage.

5. The method of claim 1 , further comprising: selectively operating switches in the second side of the main power converter to electrically isolate the main power converter from the load during at least a portion of the current pulsing operation.

6. The method of claim 1 ,further comprising:

selectively operating switches in the first side and the second side of the main power converter to stop a current flow out of the second side of the main power converter during a bridge off period following the current pulsing operation.

7. The method of claim 6 , further comprising:

selectively operating switches in at least one of the first and the second sides of the main power converter to limit a current flow out of the second side of the main power converter to a defined threshold during a current limiting period following the bridge off period.

8. The method of claim 7 , further comprising:

selectively operating switches in at least one of the first and the second sides of the main power converter to boost/convert a current from the fuel cell to the load during a boost/converting period following the current limiting period to enter a normal operation.

9. The method of claim 8 , further comprising:

storing energy from the fuel cell stack in a power storage device electrically coupled across the second side of the main power converter during at least a portion of the boost/converting period; and

releasing energy from the power storage device to the load during the current pulsing period.

10. The method of claim 9 , further comprising:

selectively operating switches in the second side of the main power converter to electrically isolate the main power converter from the load during at least a portion of the current pulsing period.

11. The method of claim 9 , further comprising:

clamping voltage spikes with a voltage spike clamping circuit across the first side of the main power converter.

12. The method according to claim 1 , wherein:

said main power converter comprises a bridge circuit which includes a plurality of first switches that are coupled to output terminals of said fuel cell system at said first side of said main power converter, and are operable to cause said power converter to supply power to said load during a boost operation; and

said step of selectively operating switches comprises operating at least some of said first switches to electrically short circuit the output terminals of the fuel cell system during the current pulsing operation.

13. A method of operating a fuel cell system comprising a main power converter having a first side and a second side, a fuel cell stack electrically coupled to the first side of the main power converter and a load electrically coupled to the second side of the main power converter, the method comprising:

determining when to start a current pulsing operation; and

selectively operating switches in the first side of the main power converter to produce a high current pulse from the fuel cell stack during a current pulsing operation as at least a portion of the current pulsing operation;

wherein said step of selectively operating switches in the first side of the main power converter comprises electrically operating a first pair of transistors in said main power converter to electrically couple a first pole of a primary side of a transformer to both a positive and a negative voltage rail and electrically operating a second pair of transistors in said main power converter to electrically couple a second pole of the primary side of a transformer to both the positive and the negative voltage rail.

14. A method of operating a fuel cell system comprising a main power converter having a first side and a second side, a fuel cell stack electrically coupled to the first side of the main power converter and a load electrically coupled to the second side of the main power converter, the method comprising:

determining when to start a current pulsing operation; and

selectively operating switches in the first side of the main power converter to produce a high current pulse from the fuel cell stack during a current pulsing operation as at least a portion of the current pulsing operation;

wherein determining when to start the current pulsing operation includes determining that an interval of between approximately 30 and 600 seconds, inclusive, has elapsed.

15. A method of operating a fuel cell system comprising a main power converter having a first side and a second side, a fuel cell stack electrically coupled to the first side of the main power converter and a load electrically coupled to the second side of the main power converter, the method comprising:

determining when to start a current pulsing operation; and

selectively operating switches in the first side of the main power converter to produce a high current pulse from the fuel cell stack during a current pulsing operation as at least a portion of the current pulsing operation;

wherein said step of selectively operating switches in the first side of the main power converter comprises selectively operating said switches in the first side of the main power converter to produce the high current pulse from the fuel cell stack for between 20 and 300 milliseconds, inclusive.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 2, 2006
From: FUEL CELL SYSTEMS GMBH
To: NUCELLSYS GMBH
Reel/Frame 017931/0963 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 2, 2006
From: BALLARD POWER SYSTEMS AG
To: FUEL CELL SYSTEMS GMBH
Reel/Frame 017971/0897 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 1, 2006
From: BALLARD POWER SYSTEMS INC.
To: BALLARD POWER SYSTEMS AG
Reel/Frame 017946/0290 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 26, 2004
From: ZHU, LIZHI; HAMPO, RICHARD J.; WELLS, BRIAN W.
To: BALLARD POWER SYSTEMS INC.
Reel/Frame 014290/0223 →