IP Library Granted Patent US 7,503,480
Granted Patent B2
US 7,503,480 · App. 10/708,597 · Granted Mar 17, 2009

Method and system for tracking user performance

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,503,480
App. No.
10/708,597
Granted
Mar 17, 2009
Kind
B2
Abstract

A system and method for using RFID technology to track resource performance and task completion is disclosed. In one exemplary embodiment, a fob and an RFID reader may engage in mutual authentication. Where the RFID reader and the fob successfully mutually authenticate, the fob may transmit to the RFID reader information identifying the resource's performance tracking account to which the fob is associated. The RFID reader may receive and forward the information to facilitate performance tracking. In one exemplary embodiment, the RFID reader may forward the information to a point of interaction terminal for transaction completion. In another exemplary embodiment, the fob completes tasks via a computer interface. In still another exemplary embodiment, the fob resource and/or a manager access a resource engine, wherein the resource engine may be used to automatically grade, track, score, and assign resources based on resource skills and skill sets.

Claims (36)

1. A method for facilitating performance tracking comprising:

creating a project task, associated with a resource, using a user interface, the project task having a predetermined completion time;

assigning the project task to an application assigned to at least one application category, the at least one application category associated with a level of skill to perform the project task;

using a transponder, presented by the resource, to communicate a transponder identifier to a radio frequency identification (RFID) reader via a radio frequency signal;

communicating the transponder identifier from the reader to a resource engine;

associating the transponder identifier with a first time value and a resource identifier corresponding to the resource;

using the transponder to communicate the transponder identifier to the reader for a second time;

communicating the transponder identifier from the reader to the resource engine for a second time;

associating the transponder identifier with a second time value and the resource identifier corresponding to the resource;

computing a task work time representing a time period that the resource was in a work environment, based at least on the first time value and the second time value;

associating the resource identifier and the task work time with the project task in the resource engine; and

comparing the predetermined completion time with the task work time.

2. The method of claim 1 , further comprising tracking of at least one performance variable using the resource engine, wherein performance variable comprises at least one of a resource, a task, an application, and a skill.

3. The method of claim 2 , wherein the tracking of the at least one performance variable is based at least on the task work time.

4. The method of claim 1 , further comprising:

determining a plurality of subtasks for completing the project task;

assigning at least one subtask of the plurality of subtasks to a second application, the second application being associated with a second application category and the second application category requiring a second level of skill;

assigning a second resource to the second application based on the second application category, the second resource having a minimum skill level required by the second application category.

5. The method of claim 1 , further comprising modifying a rating of the project task based on the comparing.

6. A transponder-reader performance tracking system comprising:

a user interface operable to allow a user to create a project task, associated with a resource, the project task having a predetermined completion time;

a transponder, associated with the resource, operable to communicate a transponder identifier to a radio frequency identification (RFID) reader via a radio frequency signal;

a resource engine operable to:

assign the project task to an application assigned to at least one application category, the at least one application category associated with a level of skill to perform the project task;

receive the transponder identifier communicated by the reader, the resource engine further operable to associate the transponder identifier with a first time value and a resource identifier corresponding to the resource,

associate the transponder identifier with a second time value and the resource identifier corresponding to the resource,

compute a task work time representing a time period that the resource was in a work environment, based at least on the first time value and the second time value,

associate the resource identifier and the task work time with the project task, and

compare the predetermined completion time with the task work time.

7. The system of claim 6 , wherein the resource engine is further configured to track at least one performance variable using the user interface, and wherein performance variable comprises at least one of a resource, a task, an application, and a skill.

8. The system of claim 7 , wherein the resource engine tracks the at least one performance variable based at least on the task work time.

9. The system of claim 6 , wherein the resource engine is further operable to:

determine a plurality of subtasks for completing the project task;

assign at least one subtask of the plurality of subtasks to a second application, the second application being associated with a second application category and the second application category requiring a second level of skill; and

assign a second resource to the second application based on the second application category, the second resource having a minimum skill level required by the second application category.

10. The system of claim 6 , wherein the resource engine is further operable to modify a rating of the project task based on the comparing.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 16, 2018
From: III HOLDINGS 1, LLC
To: LIBERTY PEAK VENTURES, LLC
Reel/Frame 045611/0193 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 21, 2014
From: AMERICAN EXPRESS TRAVEL RELATED SERVICES COMPANY, INC.
To: III HOLDINGS 1, LLC
Reel/Frame 032722/0746 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 4, 2004
From: BARNES, BRIAN; BONALLE, DAVID S; SAUNDERS, PETER D
To: AMERICAN EXPRESS TRAVEL RELATED SERVICES COMPANY, INC.
Reel/Frame 015330/0914 →