IP Library Granted Patent US 7,087,329
Granted Patent B2
US 7,087,329 · App. 10/717,089 · Granted Aug 8, 2006

Electric storage augmentation of fuel cell system transient response

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,087,329
App. No.
10/717,089
Granted
Aug 8, 2006
Kind
B2
Abstract

A fuel cell stack ( 7 ) with output lines ( 8, 9 ) has a bank of supercapacitors ( 10 ) or batteries ( 10 a ) connected across the output lines, either directly or through a DC/DC converter ( 22 ). The fuel cell stack receives fuel either from a reformer ( 13 ) or a source ( 13 a ) of hydrogen. Power is supplied through a power conditioning system ( 15 ) to a load ( 16 ), all under the control of a controller ( 19 ). The supercapacitors or batteries receive additional charge from excess power when there is a sudden decrease in the load, and provide charge to the output power lines ( 8, 9 ) when there is a sudden increase in load demand. In one embodiment, the voltage of the supercapacitors or batteries always follow the voltage of the fuel cell stack, thereby providing or receiving commensurate charge. With the DC/DC converter, the supercapacitors or batteries may be operated at voltages which are a multiple or a fraction of fuel cell stack voltage, and may have voltages boosted or bucked to aid in response to transients.

Claims (3)

1. A method of operating a fuel cell power plant having a fuel cell stack with electric output power lines providing power to a load and an electric energy storage device associated with said fuel cell stack, said method comprising:

providing a voltage to said electric energy storage device which is always either (a) substantially a multiple or (b) substantially a fraction of the voltage between said electric output power lines; and

controlling the voltage provided to said electric energy storage device in response to a voltage related to said load by (c) increasing or (d) decreasing said voltage provided to said electric storage device above or below said multiple or said fraction to increase response of said electric storage device to load transients.

Assignments (6)
CORRECTION OF ASSIGNEE ADDRESS PREVIOUSLY RECORDED AT REEL 035772, FRAME 0192. Recorded Jul 2, 2015
From: BALLARD POWER SYSTEMS INC.
To: AUDI AG
Reel/Frame 036407/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 26, 2015
From: BALLARD POWER SYSTEMS INC.
To: AUDI AG
Reel/Frame 035772/0192 →
CHANGE OF NAME Recorded Mar 16, 2015
From: UTC FUEL CELLS, LLC
To: UTC POWER CORPORATION
Reel/Frame 035206/0524 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 2, 2015
From: UNITED TECHNOLOGIES CORPORATION
To: BALLARD POWER SYSTEMS INC.
Reel/Frame 035113/0609 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 19, 2013
From: UTC POWER CORPORATION
To: UNITED TECHNOLOGIES CORPORATION
Reel/Frame 031033/0325 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 19, 2003
From: CONVERSE, DAVID G.; FREDETTE, STEVEN J.
To: UTEC FUEL CELLS, LLC
Reel/Frame 014724/0992 →