IP Library Patent Application 10744951
Patent Application
App. No. 10/744,951

Using operational information in strategic decision making

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
10/744,951
Abstract

A business process, such as a transportation process for selecting transportation agents to transport goods, is monitored during an operational stage so that notifications are given that the business process may need to be revised. The business process is executed during the operational stage and has been formulated during a planning stage based on at least one selected parameter that is projected to occur in the operational stage. During the operational stage, the at least one selected parameter is monitored to determine if the projection for the at least one selected parameter is accurate. If the projection for the at least one selected parameter is determined to be inaccurate, the business process, during the operational stage, is revised based on information that is collected during the monitoring of the at least one selected parameter.

Claims (23)

1 . A method of executing a business process during an operational stage, wherein the business process is formulated during a planning stage based on at least one selected parameter that is projected to occur in the operational stage, the method comprising:

monitoring, during the operational stage, the at least one selected parameter to determine if the projection for the at least one selected parameter is accurate; and

revising, during the operational stage, the business process if the projection for the at least one selected parameter is determined to be inaccurate, the revised business process being based on the information related to the at least one selected parameter that is collected during the monitoring of the at least one selected parameter.

2 . The method of claim 1 wherein the business process is a process for selecting transportation agents to transport goods.

3 . The method of claim 2 wherein the planning stage comprises a task of formulating contracts with transportation agents and formulating rules for the selection of transportation agents.

4 . The method of claim 2 wherein the at least one selected parameter includes an average volume or quantity of goods included in each transport.

5 . The method of claim 2 wherein the at least one selected parameter includes an average shipping distance for each transport.

6 . The method of claim 3 wherein the revision of the business process comprises a reformulation of at least one of the contracts with the transportation agents.

7 . The method of claim 3 wherein the revision of the business process comprises a reformulation of at least one of the rules for the selection of transportation agents.

8 . The method of claim 7 wherein the at least one reformulated rules comprises a capacity constraint for a carrier.

9 . The method of claim 8 wherein the at least one parameter includes a capacity constraint parameter.

10 . A transportation computer system comprising a processor and a computer program comprising instructions that when executed by the processor perform the following functions:

executes, during an operational stage, a business process designed in a planning stage based on a projection for at least one selected parameter that will occur in the operational stage;

monitors the selected parameter during the operational stage to determine if the projection for the at least one selected parameter is accurate; and

generates, if the projection for the at least one selected parameter is not accurate, a user notification that a revision to the business process should be considered.

11 . The method of claim 10 wherein the business process is a process for selecting transportation agents to transport goods.

12 . The method of claim 11 wherein the planning stage comprises a task of formulating contracts with transportation agents and formulating rules for the selection of transportation agents.

13 . The method of claim 11 wherein the at least one selected parameter includes an average volume or quantity of goods included in each transport.

14 . The method of claim 11 wherein the at least one selected parameter includes an average shipping distance for each transport.

15 . The method of claim 12 wherein the revision of the business process that should be considered comprises a reformulation of at least one of the contracts with the transportation agents.

16 . The method of claim 12 wherein the revision of the business process that should be considered comprises a reformulation of at least one of the rules for the selection of transportation agents.

17 . The method of claim 16 wherein the at least one reformulated rules comprises a capacity constraint for a carrier.

18 . The method of claim 17 wherein the at least one parameter includes a capacity constraint parameter.

Assignments (3)
CHANGE OF NAME Recorded Apr 20, 2015
From: SAP AKTIENGESELLSCHAFT
To: SAP AG
Reel/Frame 035468/0060 →
CHANGE OF NAME Recorded Aug 26, 2014
From: SAP AG
To: SAP SE
Reel/Frame 033625/0223 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 22, 2004
From: MOSBRUCKER, BERND
To: SAP AKTIENGESELLSCHAFT
Reel/Frame 015591/0391 →