IP Library Granted Patent US 6,935,639
Granted Patent B1
US 6,935,639 · App. 10/782,262 · Granted Aug 30, 2005

Mean pressure estimation for compressible fluid strut

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,935,639
App. No.
10/782,262
Granted
Aug 30, 2005
Kind
B1
Abstract

A method and apparatus is provided for estimating the mean pressure in a compressible fluid strut. A database is employed containing values for mean pressure variation corresponding to a specific combination of motor speed and flow demand, and may also account for strut temperature. The flow demand and the speed of the motor are determined, and the mean variation corresponding to the determined combination of motor speed and flow demand is selected. The estimation of strut mean pressure is updated with the selected mean pressure variation. In this way, costly pressure sensors are eliminated as well as the complicated control algorithms which are used therewith.

Claims (30)

1. A method of estimating the mean pressure in a compressible fluid strut, the strut forming a portion of an active suspension system for a vehicle, the active suspension system including a motor having a crankshaft driving a cylinder, the cylinder being responsive to flow demands to deliver or remove fluid in the strut, the method comprising the steps of:

providing a database of values for mean pressure variation corresponding to a specific combination of motor speed and flow demand

determining the flow demand;

determining a speed of the motor;

selecting the mean pressure variation corresponding to the determined combination of motor speed and flow demand;

updating the estimation of strut mean pressure with the selected mean pressure variation.

2. The method of claim 1 , further comprising the step of determining the period of the mean pressure variation based on the motor speed.

3. The method of claim 2 , further comprising the step of determining a mean pressure rate based on the mean pressure variation and the period.

4. The method of claim 3 , wherein the mean pressure rate equals the mean pressure variation divided by the period.

5. The method of claim 3 , wherein the updating step includes updating the estimation of strut mean pressure with the mean pressure rate over a length of time equal to the period.

6. The method of claim 3 , wherein the estimation of strut mean pressure is updated according to the equation SMP c =SMP p +MPR, where SMP c is current strut mean pressure, SMP p is prior strut mean pressure and MPR is mean pressure rate.

7. The method of claim 3 , wherein the estimation of strut mean pressure is updated according to the equation SMP c =SMP p +λ*MPR, where SMP c is current strut mean pressure, SMP p is prior strut mean pressure, λ is the efficiency of the motor, and MPR is mean pressure rate.

8. The method of claim 3 , wherein the estimation of strut mean pressure is updated according to the equation SMP c =SMP p +λ*MPR*(1+a) for the first half of the period, and the equation SMP c =SMP p +λ*MPR*(1−a) for the second half of the period, where SMP c is current strut mean pressure, SMP p is prior strut mean pressure, λ is the efficiency of the motor, MPR is mean pressure rate, and a is a predetermined constant to allow adjustment of the estimation.

9. The method of claim 1 , wherein the database includes values for mean pressure variation corresponding to a specific combination of motor speed, temperature and flow demand, and further comprising the step of determining a temperature, and wherein the selecting step includes selecting the mean pressure variation corresponding to the determined combination of motor speed, temperature and flow demand.

10. The method of claim 1 , wherein the updating step includes determining a time delay and delaying the update for the time delay.

11. The method of claim 1 , the active suspension system including two cylinders being responsive to flow demands to deliver or remove fluid in the strut, and wherein the flow demand is determined for each of the two cylinders.

12. The method of claim 11 , wherein the selecting step includes selecting the mean pressure variation corresponding to the determined combination of motor speed and the two flow demands.

13. An active suspension system for a vehicle comprising:

a motor having a crankshaft a cylinder driven by the crankshaft, the cylinder having high pressure and low pressure valves,

a compressible fluid strut fluidically connected to the cylinder for increasing or decreasing the pressure in the strut;

a vehicle dynamics controller generating a requested pressure for the strut;

a device control for regulating the pressure in the strut, the device control including a valve controller, a mean pressure estimator and a flow demand creator, the valve controller regulating the high and low pressure valves of the cylinder, the mean pressure estimator providing an estimation of the mean pressure in the strut, the flow demand creator sending flow demand signals to the valve controller based on the difference between the requested pressure and the estimation of current mean pressure; and

wherein the mean pressure estimator receives data on the speed of the motor and the flow demand signals, determines a mean pressure variation corresponding to the motor speed and flow demand, and updates the estimation of strut mean pressure with the mean pressure variation.

14. The active suspension system of claim 13 , further comprising a database having mean pressure variation values corresponding to specific combinations of motor speed and flow demand.

15. The active suspension system of claim 13 , further comprising a database having mean pressure variation values corresponding to specific combinations of motor speed, temperature and flow demand.

16. The active suspension system of claim 15 , wherein the mean pressure estimator receives data on the temperature, and wherein the mean pressure estimator determines a mean pressure variation corresponding to the motor speed, temperature and flow demand.

17. The active suspension system of claim 13 , wherein the mean pressure estimator determines the period of the mean pressure variation based on the motor speed.

18. The active suspension system of claim 17 , wherein the mean pressure estimator determines a mean pressure rate based on the mean pressure variation divided by the period.

19. The active suspension system of claim 18 , wherein the mean pressure estimator updates the estimation of strut mean pressure with the mean pressure rate over a length of time equal to the period.

20. The active suspension system of claim 18 , wherein the estimation of strut mean pressure is updated according to the equation SMP c =SMP p +λ*MPR, where SMP c is current strut mean pressure, SMP p is prior strut mean pressure, λ is the efficiency of the motor, and MPR is mean pressure rate.

Assignments (9)
CHANGE OF NAME Recorded Mar 21, 2011
From: X-ACTIVE, LLC
To: FLUID RIDE, LTD
Reel/Frame 025989/0978 →
RELEASE BY SECURED PARTY AGAINST SECURITY INTEREST IN PATENTS RECORDED AT REEL 022575 FRAME 0186 Recorded Oct 7, 2010
From: WILMINGTON TRUST FSB, AS ADMINISTRATIVE AGENT
To: VISTEON GLOBAL TECHNOLOGIES, INC.
Reel/Frame 025105/0201 →
RELEASE BY SECURED PARTY AGAINST SECURITY INTEREST IN PATENTS RECORDED AT REEL 022974 FRAME 0057 Recorded Oct 6, 2010
From: THE BANK OF NEW YORK MELLON
To: VISTEON GLOBAL TECHNOLOGIES, INC.
Reel/Frame 025095/0711 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 11, 2010
From: VISTEON GLOBAL TECHNOLOGIES, INC.
To: X-ACTIVE, LLC
Reel/Frame 023758/0435 →
ASSIGNMENT OF PATENT SECURITY INTEREST Recorded Jul 17, 2009
From: JPMORGAN CHASE BANK, N.A., A NATIONAL BANKING ASSOCIATION
To: THE BANK OF NEW YORK MELLON, AS ADMINISTRATIVE AGENT
Reel/Frame 022974/0057 →
ASSIGNMENT OF SECURITY INTEREST IN PATENTS Recorded Apr 21, 2009
From: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT
To: WILMINGTON TRUST FSB, AS ADMINISTRATIVE AGENT
Reel/Frame 022575/0186 →
SECURITY INTEREST Recorded Feb 27, 2009
From: VISTEON GLOBAL TECHNOLOGIES, INC.
To: JPMORGAN CHASE BANK
Reel/Frame 022368/0001 →
SECURITY AGREEMENT Recorded Feb 7, 2008
From: VISTEON GLOBAL TECHNOLOGIES, INC.
To: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 020497/0733 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 18, 2004
From: SONG, XUBIN; OSORIO, CARLOS FERNANDO; EDMONDSON, JEREMY RICHARD
To: VISTEON GLOBAL TECHNOLOGIES, INC.
Reel/Frame 015011/0370 →