IP Library Granted Patent US 7,241,526
Granted Patent B2
US 7,241,526 · App. 10/802,026 · Granted Jul 10, 2007

Fuel cell manifold cable end clamp

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,241,526
App. No.
10/802,026
Granted
Jul 10, 2007
Kind
B2
Abstract

A pair of reactant gas manifolds ( 11 and 12 ) on opposite sides of a fuel cell stack ( 7 ) are sealed to the fuel cells ( 14 ) and pressure plates ( 8 ) by means of pressure applied by load cables ( 17 ). The centers of the manifolds are prevented from having leakage between them and the end plates by means of a tensioning system comprising a plurality of pins ( 22 ) extending outwardly from the ends of the manifolds, and tensioning cables ( 23 ) extending around the pins in a closed loop and tensioned by a turnbuckle ( 24 ).

Claims (7)

1. A fuel cell stack comprising:

a plurality of contiguous fuel cells compressed between pressure plates by tie rods;

at least one pair of manifolds for directing at least reactant gas into and out of said fuel cells, said at least one pair of manifolds being disposed on opposite sides of said fuel cell stack, said manifolds each having an end with an end surface adjacent to one of said pressure plates, said manifolds being held in gas sealing relationship to edges of said fuel cells and said pressure plates by means of seal materials and load cables under tension;

at least one pin disposed in the end surface of each of said manifolds, said at least one pin extending outwardly from the end surface of the corresponding manifold; and

a cable extending in a closed loop about said pins, said cable under tension, thereby drawing the pins and therefore the manifolds toward each other, whereby to overcome gas leakage through the seals at the interface of the manifolds with the pressure plates.

2. A fuel cell stack according to claim 1 wherein said cable has two ends which are drawn together by a tensioning turnbuckle.

3. A fuel cell stack according to claim 1 wherein there are two pine disposed in each end surface of each of said pair of manifolds, and said cable extends about four pins.

Assignments (6)
CORRECTION OF ASSIGNEE ADDRESS PREVIOUSLY RECORDED AT REEL 035772, FRAME 0192. Recorded Jul 2, 2015
From: BALLARD POWER SYSTEMS INC.
To: AUDI AG
Reel/Frame 036407/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 26, 2015
From: BALLARD POWER SYSTEMS INC.
To: AUDI AG
Reel/Frame 035772/0192 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 2, 2015
From: UNITED TECHNOLOGIES CORPORATION
To: BALLARD POWER SYSTEMS INC.
Reel/Frame 035113/0609 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 19, 2013
From: UTC POWER CORPORATION
To: UNITED TECHNOLOGIES CORPORATION
Reel/Frame 031033/0325 →
CONVERSION TO CORPORATION Recorded May 30, 2007
From: UTC FUEL CALLS, LLC
To: UTC POWER CORPORATION
Reel/Frame 019359/0189 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 16, 2004
From: PETTY, DALE W.; PHILLIPS, CYNTHIA M.
To: UTC FUEL CELLS, LLC
Reel/Frame 015106/0153 →