Detection of islanded behavior and anti-islanding protection of a generator in grid-connected mode

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,864,595
App. No.
10/812,979
Granted
Mar 8, 2005
Kind
B2
Abstract

A method of controlling a generator system connected to an electric power system in which the output frequency characteristic of the generator system is measured, a first phase angle and frequency of the measured frequency characteristic is estimated using a first phase locked loop having a first bandwidth, and a second phase angle and frequency of the measured frequency characteristic is estimated using a second phase locked loop having a second bandwidth greater than the first bandwidth. Further, the method calculates a frequency difference between the first and second estimated frequencies, and an angle variation that is proportional to the calculated frequency difference. The estimated second phase angle is then added to the calculated angle variation so as to form an output current phase angle reference, and an output current phase angle of the generator system is controlled to be aligned with the output current phase angle reference. The method also determines whether or not the generator system is within a generation island based on the measured frequency characteristic.

Claims (36)

1. A method of controlling a generator system connected to an electric power system, comprising:

measuring an output frequency characteristic of the generator system;

estimating a first phase angle of the measured frequency characteristic using a first phase locked loop having a first bandwidth;

estimating a second phase angle of the measured frequency characteristic using a second phase locked loop having a second bandwidth greater than the first bandwidth;

calculating a phase shift between the estimated first and second phase angles; and

determining whether or not the generator system is within a generation island based on the calculated phase shift.

2. The method according to claim 1 , further comprising:

stopping the generator system from delivering electric power to the electric power system if the determining step determines the generator system is within a generation island.

3. The method according to claim 1 , wherein the determining step determines the generator system is within a generation island if an absolute value of calculated phase shift is greater than a predetermined threshold.

4. The method according to claim 3 , wherein the predetermined threshold is π/2.

5. The method according to claim 1 , wherein the first and second bandwidths are approximately 1 Hz and 10 Hz, respectively.

6. The method according to claim 1 , wherein the determining step determines whether or not the generator system is within a generation island in less than 1 second.

7. A system for controlling a generator system connected to an electric power system, comprising:

means for measuring an output frequency characteristic of the generator system;

means for estimating a first phase angle of the measured frequency characteristic using a first phase locked loop having a first bandwidth;

means for estimating a second phase angle of the measured frequency characteristic using a second phase locked loop having a second bandwidth greater than the first bandwidth;

means for calculating a phase shift between the estimated first and second phase angles; and

means for determining whether or not the generator system is within a generation island based on the calculated phase shift.

8. The system according to claim 7 , further comprising:

means for stopping the generator system from delivering electric power to the electric power system if the determining means determines the generator system is within a generation island.

9. The system according to claim 7 , wherein the determining means determines the generator system is within a generation island if an absolute value of calculated phase shift is greater than a predetermined threshold.

10. The system according to claim 9 , wherein the predetermined threshold is π/2.

11. The system according to claim 7 , wherein the first and second bandwidths are approximately 1 Hz and 10 Hz, respectively.

12. The system according to claim 7 , wherein the determining means determines whether or not the generator system is within a generation island in less than 1 second.

13. In a generator system connected to an electric power system, the improvement comprising:

a measuring circuit configured to measure an output frequency characteristic of the generator system;

a first phase locked loop having a first bandwidth and configured to estimate a first phase angle of the measured frequency characteristic;

a second phase locked loop having a second bandwidth greater than the first bandwidth and configured to estimate a second phase angle of the measured frequency characteristic;

a calculating circuit configured to calculate a phase shift between the estimated first and second phase angles; and

a determining circuit configured to determine whether or not the generator system is within a generation island based on the calculated phase shift.

14. The system according to claim 13 , further comprising:

a disconnecting circuit configure to stop the generator system from delivering electric power to the electric power system if the determining circuit determines the generator system is within a generation island.

15. The system according to claim 13 , wherein the determining circuit determines the generator system is within a generation island if an absolute value of calculated phase shift is greater than a predetermined threshold.

16. The system according to claim 15 , wherein the predetermined threshold is π/2.

17. The system according to claim 13 , wherein the first and second bandwidths are approximately 1 Hz and 10 Hz, respectively.

18. The system according to claim 13 , wherein the determining circuit determines whether or not the generator system is within a generation island in less than 1 second.

Assignments (4)
RELEASE OF SECURITY INTEREST Recorded Dec 7, 2023
From: GOLDMAN SACHS SPECIALTY LENDING GROUP, L.P.
To: CAPSTONE GREEN ENERGY CORPORATION F/K/A CAPSTONE TURBINE CORPORATION
Reel/Frame 065835/0541 →
RELEASE OF SECURITY INTEREST Recorded Feb 11, 2019
From: WESTERN ALLIANCE BANK
To: CAPSTONE TURBINE CORPORATION
Reel/Frame 048302/0838 →
SECURITY INTEREST Recorded Feb 5, 2019
From: CAPSTONE TURBINE CORPORATION
To: GOLDMAN SACHS SPECIALTY LENDING HOLDINGS, INC.
Reel/Frame 048262/0001 →
SECURITY INTEREST Recorded Jun 5, 2017
From: CAPSTONE TURBINE CORPORATION
To: WESTERN ALLIANCE BANK, AN ARIZONA CORPORATION
Reel/Frame 042690/0159 →