US 7,321,810 · App. 10/841,722 · Granted Jan 22, 2008

Method of dynamic economic dispatch

Assignee: Siemens Power Transmission & Distribution, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,321,810
App. No.
10/841,722
Granted
Jan 22, 2008
Kind
B2
Abstract

Certain exemplary embodiments provide a method comprising: for an electrical power system comprising a plurality of committed electrical power generating units: for each of the committed electrical power generating units, obtaining an optimal power output temporal trajectory, the optimal power output temporal trajectory constrained by a ramping limit of the committed electrical power generating unit; obtaining an optimal power reserve temporal trajectory for each of the committed electrical power generating units; and assigning each of the optimal power output temporal trajectories to the respective electrical power generating units so that, over a predetermined consecutive set of time intervals, an integrated cost of system power output is minimized and a system reserve requirement is met.

Claims (397)

1. A method, comprising:

for an electrical power system comprising a plurality of committed electrical power generating units:

for each of the committed electrical power generating units, determining an optimal power output temporal trajectory, the optimal power output temporal trajectory constrained by a ramping limit of the committed electrical power generating unit, wherein determining the optimal power output temporal trajectory for each of the committed electrical power generating units comprises calculating ramping constraints according to a Lagrange relationship:

L

(

ρ

unit

t

:

Up

,

ρ

unit

t

,

Dn

)

=

ρ

unit

t

;

Dn

·

Δ

P

unit

Dn

-

ρ

unit

t

,

Up

·

Δ

P

unit

Up

+

min

P

unit

t

{

i

T

allunits

(

C

unit

(

P

unit

t

)

+

ρ

unit

t

;

Up

(

P

unit

t

-

P

unit

t

-

1

)

-

ρ

unit

t

;

Dn

(

P

unit

t

-

P

unit

t

-

1

)

P

unit

t

SCED

}

,

wherein ρ unit t;Up is a multiplier for an upward ramping limit of a unit over a time interval t; ρ unit t;Dn is a multiplier for a downward ramping limit of a unit over the time interval t; ΔP unit Dn is a unit downward ramping limit; ΔP unit Up is a unit upward ramping limit; P unit t is the unit power generation at time interval t; T is a time period comprising consecutive time intervals t; P unit t−1 for t=t 1 represents P unit 0 with t 0 being a current time interval; C unit is the cost of unit power generation; and ℑ SCED t represents static security constrained economic dispatch (SCED) constraints at time interval t;

determining an optimal power reserve temporal trajectory for each of the committed electrical power generating units; and

assigning each of the optimal power output temporal trajectories to the respective electrical power generating units so that, over a predetermined consecutive set of time intervals, an integrated cost of system power output is minimized and a system reserve requirement is met.

2. The method of claim 1 , further comprising:

obtaining an identity of each of the committed electrical power generating units.

3. The method of claim 1 , further comprising:

obtaining a commitment status of each of the committed electrical power generating units.

4. The method of claim 1 , further comprising:

determining the consecutive set of time intervals.

5. The method of claim 1 , further comprising:

obtaining the predetermined consecutive set of time intervals.

6. The method of claim 1 , further comprising:

obtaining a predicted system load profile for the predetermined consecutive set of time intervals.

7. The method of claim 1 , further comprising:

obtaining a predicted system load profile for the predetermined consecutive set of time intervals from a Very Short Term Load Predictor.

8. The method of claim 1 , further comprising:

obtaining the integrated cost of system power output.

9. The method of claim 1 , further comprising:

obtaining the system reserve requirement.

10. The method of claim 1 , further comprising:

obtaining an optimal electrical generation output temporal trajectory for each committed electrical power generating unit.

11. The method of claim 1 , further comprising:

obtaining an ACE.

12. The method of claim 1 , further comprising:

regulating an ACE to within a predetermined range around zero.

13. The method of claim 1 , further comprising:

minimizing a count of unit reversals.

14. The method of claim 1 , further comprising:

enabling a predetermined operating constraint.

15. The method of claim 1 , further comprising:

disabling a predetermined operating constraint.

16. The method of claim 1 , further comprising:

providing the optimal power output temporal trajectoriess to an LFC application.

17. The method of claim 1 , wherein the optimal power output temporal trajectories are optimal via a hierarchical nonlinear optimization technique.

18. The method of claim 1 , wherein the optimal power output temporal trajectories are optimal via a Lagrange Multiplier approach.

19. The method of claim 1 , wherein the optimal power output temporal trajectories are optimal via a Dantzig-Wolfe based optimization approach.

20. The method of claim 1 , wherein the optimal power output temporal trajectories are constrained by a system power balance.

21. The method of claim 1 , wherein the optimal power output temporal trajectories are constrained by a system spinning reserve requirement.

22. The method of claim 1 , wherein the optimal power output temporal trajectories are constrained by generation limits of the committed electrical power generating units.

23. The method of claim 1 , wherein the optimal power output temporal trajectories are constrained by power flow thermal limits of system transmission lines.

24. The method of claim 1 , wherein the optimal power output temporal trajectories are constrained by system power output limits.

25. The method of claim 1 , wherein the optimal power output temporal trajectories are constrained by ramp rate limits of the committed electrical power generating units for the predetermined consecutive set of time intervals.

26. The method of claim 1 , wherein the optimal power output temporal trajectories are constrained by a ramping constraint for the committed electrical power generating units for the predetermined consecutive set of time intervals.

27. A computer readable medium having computer readable instructions embedded therein, which, when executed by a computer, cause the computer to implement a method comprising:

for an electrical system comprising a plurality of committed electrical power generating units;

calculating a power output value for each of the committed electrical power generating units responsive to ramping limits of the committed electrical power generating units, wherein calculating the power output value for each of the committed electrical power generating units comprises calculating ramping constraints according to a Lagrange relationship:

L

(

ρ

unit

t

:

Up

,

ρ

unit

t

,

Dn

)

=

ρ

unit

t

;

Dn

·

Δ

P

unit

Dn

-

ρ

unit

t

,

Up

·

Δ

P

unit

Up

+

min

P

unit

t

{

i

T

allunits

(

C

unit

(

P

unit

t

)

+

ρ

unit

t

;

Up

(

P

unit

t

-

P

unit

t

-

1

)

-

ρ

unit

t

;

Dn

(

P

unit

t

-

P

unit

t

-

1

)

P

unit

t

SCED

}

,

wherein ρ unit t;Up is a multiplier to an upward ramping limit of a unit over a time interval t; ρ unit t;Dn is a multiplier for a downward ramping limit of a unit over the time interval t; ΔP unit Dn is a unit downward ramping limit; ΔP unit Up is a unit uoward ramping limit; P unit t is the unit power generation at time interval t; T is a time period comprising consecutive time intervals t; P unit t−1 for t=t 1 represents P unit t 0 with t 0 being a current time interval; C unit is the cost of unit power generation; and ℑ SCED t represents static security constrained economic dispatch (SCED) constraints at time interval t;

calculating a power reserve value for each of the committed electrical power generating units; and

assigning each of the corresponding power output values to the respective electrical power generating units so that, over a predetermined consecutive set of time intervals, an integrated cost of system power output is minimized and a system reserve requirement is met.

28. A system comprising:

for an electrical system comprising a plurality of committed electrical power generating units:

a power output processor adapted to calculate a power output value for each of the committed electrical power generating units responsive to ramping limits of the committed electrical power generating units, wherein calculating the power output value for each of the committed electrical power generating units comprises calculating ramping constraints according to a Lagrange relationship:

L

(

ρ

unit

t

:

Up

,

ρ

unit

t

,

Dn

)

=

ρ

unit

t

;

Dn

·

Δ

P

unit

Dn

-

ρ

unit

t

,

Up

·

Δ

P

unit

Up

+

min

P

unit

t

{

i

T

allunits

(

C

unit

(

P

unit

t

)

+

ρ

unit

t

;

Up

(

P

unit

t

-

P

unit

t

-

1

)

-

ρ

unit

t

;

Dn

(

P

unit

t

-

P

unit

t

-

1

)

P

unit

t

SCED

}

,

wherein ρ unit t,Up is a multiplier for an upward ramping limit of a unit over a time interval t; ρ unit t,Dn is a multiplier for a downward ramping limit of a unit over the time interval t; ΔP unit Dn is a unit downward ramping limit; ΔP unit Up is a unit upward ramping limit; P unit t is the unit power generation at time interval t; T is a time period comprising consecutive time intervals t, P unit t−1 for t=t 1 represents P unit t 0 with t 0 being a current time interval; C unit is the cost of unit power generation; and ℑ SCED t represents static security constrained economic dispatch (SCED) constraints at time interval t;

a power reserve processor adapted to calculate a power reserve value for each of the committed electrical power generating units; and

a power output assignment processor adapted to assign each of the corresponding power output values to the respective electrical power generating units so that, over a predetermined consecutive set of time intervals, an integrated cost of system power output is minimized and a system reserve requirement is met.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 28, 2011
From: SIEMENS ENERGY, INC.
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 027286/0887 →
MERGER Recorded Sep 30, 2009
From: SIEMENS POWER TRANSMISSION & DISTRIBUTION, INC.
To: SIEMENS POWER GENERATION, INC.
Reel/Frame 023304/0259 →
CHANGE OF NAME Recorded Sep 30, 2009
From: SIEMENS POWER GENERATION, INC.
To: SIEMENS ENERGY, INC.
Reel/Frame 023304/0588 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 16, 2004
From: DEININGER, THOMAS; HORN, MICHAEL S.; OH, JUNG MIN; HOGAN, MICHAEL; RAINES, WILLIAM F.
To: SIEMENS ENERGY & AUTOMATION, INC.
Reel/Frame 016083/0945 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 23, 2004
From: MANSINGH, ASHMIN; PELJTO, HASO; YORK, MIKE; CHEN, DINGGUO
To: SIEMENS POWER TRANSMISSION & DISTRIBUTION, INC.
Reel/Frame 015714/0600 →
Continuity (5)
Provisional Application 6047009600 · May 13, 2003
Provisional Application 6047009500 · May 13, 2003
Provisional Application 6047003900 · May 13, 2003
Provisional Application 6047003800 · May 13, 2003
Related Publication 20040257059A1 · Dec 23, 2004