PPP connection during simple IP
View Patent ↗The invention relates to a method for maintaining a Point-to-Point Protocol (PPP) connection between a Mobile Terminal (MT) and a Packet Data Serving Node (PDSN). Responsive to a detection at the PDSN that the PPP connection between the PDSN and the MT is inactive, the method sends a first Link Control Protocol (LCP) Echo Request, which including a Short Data Burst (SDB) parameter, wherein the SDB parameter indicates that the message is sent using SDB, from the PDSN to a Base Station Controller/Packet Control Function (BSC/PCF) for locating the MT. The method further determines on the reception of SDB parameter, not to setup a traffic channel (TCH) between the MT and a serving BS. Next, the method sends from the BSC/PCF to the BS a second LCP Echo Request, which includes a NO Traffic Channel (No TCH) parameter instructing not to setup a traffic channel for the MT.
1. A method for maintaining a Point-to-Point Protocol (PPP) connection between a Mobile Terminal (MT) and a Packet Data Serving Node (PDSN), the method comprising the steps of:
responsive to a detection at the PDSN that the PPP connection between the PDSN and the MT is inactive, receiving at a Base Station Controller/Packet Control Function (BSC/PCF) a first Link Control Protocol (LCP) Echo Request from the PDSN for locating the MT, the LCP Echo Request including a Short Data Burst (SDB) parameter, wherein the SDB parameter indicates that the message is sent using SDB;
determining at the BSC/PCF based on the reception of SDB parameter, that a setup of a traffic channel (TCH) between the MT and a serving BS is to be avoided; and
sending from the BSC/PCF a second LCP Echo Request to a Base Station (BS), the LCP Request including a NO Traffic Channel (No TCH) parameter for preventing a setup of a TCH for the MT.
2. The method of claim 1 , wherein the first LCP Echo Request is triggered by a PPP connection inactivity timer.
3. The method of claim 1 , wherein the step of sending includes the steps of:
starting at the PDSN an Echo Reply timeout timer; and
initializing at the PDSN an Echo Request-Retries counter.
4. The method of claim 1 , wherein the step of sending further comprises the steps of:
using a common channel signaling between the MT and the BS; and
sending in SDB a LCP Echo Reply from the MT to the PDSN, the LCP Echo Reply including a MT present parameter indicating that the MT is present and that the PDSN does not need to send another LCP Echo Request.
5. A Base Station Controller/Packet Control Function (BSC/PCF) for supporting Short Data Burst (SDB) during a Point-to-Point Protocol (PPP) connection between a Packet Data Serving Node (PDSN) and the MT, wherein responsive to a detection at the PDSN that the PPP connection between the PDSN and the MT is inactive, the BSC/PCF receives from the PDSN a Link Control Protocol (LCP) Echo Request for locating the MT, the LCP Echo Request including a SDB parameter, wherein the SDB parameter indicates that the message is sent using SDB, and wherein the BSC/PCF further determines based on the reception of SDB parameter, that a setup a traffic channel (TCH) is to be avoided; and sends a LCP Request to the MT a LCP Echo request, the LCP Request including a NO Traffic Channel (No TCH) parameter for preventing a setup of a TCH for the MT.
6. The BSC/PCF of claim 5 , wherein the BSC/PCF further receives in SDB a LCP Echo Reply from the BS, the LCP Echo Reply including a MT present parameter indicating that the MT is present.
7. The BSC/PCF of claim 6 , wherein the BSC/PCF further sends to the PDSN the LCP Echo Reply for indicating the presence of the MT in the serving area of the PDSN.