IP Library Granted Patent US 7,645,094
Granted Patent B2
US 7,645,094 · App. 10/889,599 · Granted Jan 12, 2010

Methods for the rapid deployment of piping

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,645,094
App. No.
10/889,599
Granted
Jan 12, 2010
Kind
B2
Abstract

A piping transport structure for use with a deployment vehicle to provide for improved efficiencies in laying temporary or semi-permanent piping structures. There is also a system for having one or more deployment vehicles smoothly lay piping and to allow for long pipe lays to be carried out in less time.

Claims (38)

1. A method for deploying piping comprising:

providing a plurality of deployment vehicles, each deployment vehicle carrying a predetermined length of piping;

starting all of said plurality of deployment vehicles at relatively the same departure point;

sending each of said plurality of deployment vehicles from said departure point to a different piping lay start point associated with said deployment vehicle, each deployment vehicle departing said departure point relatively simultaneously;

having each vehicle from said plurality of deployment vehicles begin laying said piping carried by the deployment vehicle when the deployment vehicle reaches said deployment vehicle's assigned piping lay start point without stopping at the start point regardless of the position or progress of the other deployment vehicles of said plurality of deployment vehicles;

continuing to lay said piping along a predefined path until said each of the plurality of deployment vehicles reaches a start point of another of the plurality of deployment vehicles, said each of the plurality of deployment vehicles having laid an amount of piping prior to reaching said start point of another of the plurality of deployment vehicles; and

connecting said piping of said each of the plurality of deployment vehicles to the piping of said another of each of said plurality of deployment vehicles independent of the laying progress of another of the plurality of deployment vehicles.

2. The method of claim 1 wherein said laid piping is temporary.

3. The method of claim 1 wherein said deployment vehicle comprises a HEMTTLHS carrying a piping transport structure.

4. The method of claim 3 wherein said piping transport structure includes:

a support structure;

a reel attached to said support structure;

piping rolled about said reel;

an outrigger connected to said support structure; and

a piping deployment and retrieval device connected to said support structure.

5. The method of claim 4 wherein, when said piping is unrolled from said reel, said piping passes through said outrigger and said piping deployment and retrieval device.

6. The method of claim 1 wherein said piping lay start point and said path associated with each of said deployment vehicles are determined by a global positioning system (GPS).

7. A method for deploying piping comprising:

providing a plurality of deployment vehicles, each deployment vehicle carrying a predetermined length of piping and a positioning system;

assigning a first vehicle selected from said plurality of deployment vehicles a first piping lay start point associated with said first deployment vehicle;

deriving a first end point for said first vehicle based on said start point, said predetermined length of piping carried by said first vehicle, and the geography over which the piping is to be placed, said first end point being selected so that said predetermined length of piping will extend from said start point to said end point along an optimal path;

repeating said assigning and deriving for each of said plurality of deployment vehicles where the end point of said first vehicle is the start point for a second vehicle selected from said plurality of deployment vehicles and so on until each vehicle of said plurality of deployment vehicles has a start point and an end point;

using said positioning system to determine said start point, said end point, and said optimal path of each of said deployment vehicles;

starting all of said plurality of deployment vehicles at relatively the same departure point at relatively the same time;

sending each of said plurality of deployment vehicles in a relatively simultaneous fashion from said departure point to said start point;

having each vehicle from said plurality of deployment vehicles begin laying said piping carried by the deployment vehicle when the deployment vehicle reaches said deployment vehicle's assigned piping lay start point without stopping at the start point regardless of the position or progress of the other deployment vehicles of said plurality of deployment vehicles; and

continuing to lay said piping along a predefined path until said each of the plurality of deployment vehicles reaches a start point of another of the plurality of deployment vehicles, said each of the plurality of deployment vehicles having laid an amount of piping prior reaching said start point of another of the plurality of deployment vehicles;

connecting said piping of said each of the plurality of deployment vehicles to the piping of said another of each of said plurality of deployment vehicles independent of the laying progress of another of the plurality of deployment vehicles.

8. The method of claim 7 wherein said positioning system is a global positioning system (GPS).

9. The method of claim 7 wherein said laid piping is temporary.

10. The method of claim 7 wherein said deployment vehicle comprises a HEMTT-LHS carrying a piping transport structure.

11. The method of claim 10 wherein said piping transport structure includes:

a support structure;

a reel attached to said support structure;

piping rolled about said reel;

an outrigger connected to said support structure; and

a piping deployment and retrieval device connected to said support structure.

12. The method of claim 11 wherein, when said piping is unrolled from said reel, said piping passes through said outrigger and said piping deployment and retrieval device.

Assignments (4)
RELEASE OF SECURITY INTEREST Recorded Jun 24, 2010
From: WELLS FARGO BANK, N.A.
To: DRS SUSTAINMENT SYSTEMS, INC.
Reel/Frame 024576/0850 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 20, 2008
From: ENGINEERED SUPPORT SYSTEMS, INC.
To: DRS SUSTAINMENT SYSTEMS, INC.
Reel/Frame 021411/0471 →
SECURITY AGREEMENT Recorded Aug 12, 2008
From: DRS SUSTAINMENT SYSTEMS, INC.
To: WACHOVIA BANK, NATIONAL ASSOCIATION
Reel/Frame 021371/0255 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 5, 2004
From: KRISE, MARTIN; BROUSSARD, KEN; WOOTTON, JOHN
To: ENGINEERED SUPPORT SYSTEMS, INC.
Reel/Frame 015218/0652 →