IP Library Granted Patent US 7,399,547
Granted Patent B2
US 7,399,547 · App. 10/981,183 · Granted Jul 15, 2008

Fuel and air flow control in a multi-stack fuel cell power plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,399,547
App. No.
10/981,183
Granted
Jul 15, 2008
Kind
B2
Abstract

A fuel cell power plant includes a plurality of fuel cell stacks which are operatively associated with each other so that both the air stream and fuel stream for the stacks are shared by each of the stacks in the power plant. The air and fuel streams are fed into an initial stack stage in the power plant, and after the air and fuel streams pass through the initial stack stage, the fuel exhaust streams are then fed into one or more subsequent stack stages in the power plant. The fuel streams are passed from the initial fuel cell stack stage to the subsequent fuel cell stack stage by means of a common manifold on which each of the fuel cell stacks in the power plant is mounted. The common manifold fuel stream passages are thermally insulated so as to limit water condensation in the fuel stream passages. The manifold may also include water condensation collection traps which will withdraw any water condensate that does form in the fuel stream passages.

Claims (8)

1. A fuel cell power plant power section assembly comprising:

a) a plurality of fuel cell stacks, said fuel cell stacks being being divided into at least two stages which are provided by a fuel gas stream in tandem with partially spent fuel from one stage being fed into a subsequent stage, said one stage including a plurality of fuel cell stacks, and said subsequent stage including at least one fuel cell stack;

b) a unitary manifold assembly for use in controlling the flow of reactant gas streams between said plurality of fuel cell stacks in said one stage and said subsequent stage, said manifold assembly comprising a single fuel gas passage operatively connected to said plurality of fuel cell stacks in said one stage, said fuel gas passage being operative to receive partially expended fuel gas streams exhausted from said plurality of fuel cell stacks and to combine said partially expended fuel gas streams into a combined fuel gas stream, and said fuel gas passage also being operatively connected to said at least one fuel cell stack in said subsequent stage for directing the combined fuel gas stream to said at least one fuel cell stack in said subsequent stage, whereby the combined fuel gas stream is used to provide fuel for the subsequent stage fuel cell stack; and

c) thermal insulation which thermally insulates said manifold assembly from ambient temperatures so as to limit moisture condensation in said fuel gas passage.

2. The power section assembly of claim 1 wherein said manifold assembly further comprises at least one condensed moisture trap in said fuel gas passage.

3. The power section assembly of claim 2 wherein said condensed moisture trap includes a drain for removing condensed moisture from said trap.

4. The power section assembly of claim 3 wherein said drain includes a valve for selectively controlling removal of condensed moisture from said trap.

5. The power section assembly of claim 1 further comprising fuel cell adjunct component mounts on said manifold assembly for mounting voltage-reading circuit boards, as well as other adjunct fuel cell power plant components.

Assignments (6)
CORRECTION OF ASSIGNEE ADDRESS PREVIOUSLY RECORDED AT REEL 035772, FRAME 0192. Recorded Jul 2, 2015
From: BALLARD POWER SYSTEMS INC.
To: AUDI AG
Reel/Frame 036407/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 26, 2015
From: BALLARD POWER SYSTEMS INC.
To: AUDI AG
Reel/Frame 035772/0192 →
CHANGE OF NAME Recorded Mar 16, 2015
From: UTC FUEL CELLS, LLC
To: UTC POWER CORPORATION
Reel/Frame 035206/0524 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 2, 2015
From: UNITED TECHNOLOGIES CORPORATION
To: BALLARD POWER SYSTEMS INC.
Reel/Frame 035113/0609 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 19, 2013
From: UTC POWER CORPORATION
To: UNITED TECHNOLOGIES CORPORATION
Reel/Frame 031033/0325 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 5, 2004
From: PERRY, MICHAEL L.
To: UTC FUEL CELLS, LLC
Reel/Frame 015957/0564 →