IP Library Granted Patent US 7,263,465
Granted Patent B2
US 7,263,465 · App. 11/010,242 · Granted Aug 28, 2007

Pipeline integrity management process

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,263,465
App. No.
11/010,242
Granted
Aug 28, 2007
Kind
B2
Abstract

A method for reducing the consequences and risks of failure in a hydrocarbon pipeline system includes identifying specific segments of pipelines the leakage of which could have an adverse impact on environment or safety, particularly in areas of high consequence, developing a baseline assessment plan for such segments by analyzing information including age, corrosion, and types of seams and joints and then establishing preventive and migitative measures including, where necessary, positioning emergency flow restricting devices in one or more pipeline segments.

Claims (21)

1. A method of creating data related to management of the operation of a pipeline, the data being available for immediate display or stored for future display, the method comprising the steps of:

(a) identifying pipeline segments and/or related assets in which a spill could effect an area of high consequence;

(b) developing a database of geological information for said segments on a segment by segment basis and/or related assets on an asset by asset basis;

(c) estimating worst case release data for said pipeline segment and/or said related assets; and

(d) developing a baseline threat assessment for said pipeline segments including for various ones of said pipeline segments

(i) collecting construction data, operational data, inspection data and incident data;

(ii) developing an integrity threat matrix;

(iii) evaluating risk factors including long seam susceptibility, corrosion and evaluating said integrity matrix;

(iv) ranking risks and establishing prioritization of corrective actions for said segments including the steps of developing an algorithm for said pipeline segments based upon evaluation of risks for specific ones of said pipeline segments and incorporating said algorithm in a computer interface;

(v) developing a continuous improvement program which includes one or more of the following

(1) identifying a change to a risk;

(2) modifying said threat matrix based on said change;

(3) modifying threat specific algorithms; and

(4) modifying total risk algorithms; and

wherein said continuous improvement program further includes

(a) reviewing existing data for specific pipeline segments;

(b) determining appropriate testing methods for said segments; and

(c) calculating appropriate time interval for reassessment.

2. The process of claim 1 further including the step of modifying the effectiveness algorithm of emergency flow restriction devices.

3. The process of claim 1 further including the step of modifying the effectiveness algorithm of leak detection.

4. The process of claim 1 further including the step of modifying priority of action to be taken.

Assignments (3)
CONVERSION Recorded Dec 7, 2010
From: MARATHON PETROLEUM COMPANY LLC
To: MARATHON PETROLEUM COMPANY LP
Reel/Frame 025445/0896 →
CHANGE OF NAME Recorded Sep 15, 2005
From: MARATHON ASHLAND PETROLEUM LLC
To: MARATHON PETROLEUM COMPANY LLC
Reel/Frame 016541/0201 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 18, 2005
From: TURLEY, RICHARD D.; FIEGERT, DEBRA S.; STECHSCHULTE, DONALD J.; JONES, J. CHARLES; JOHNSTON, DENNIS C.; HUCKE, DENNIS C.; GUINN, GEORGE L.; MELAN, BRYAN P.; JONES, THOMAS A.; SCHMITS, NINA M.; CARR, DOUGLAS T.; PRICE, RAYMOND W.; ROSS, STEVEN T.; KENDRICK, ANDREW W.; SIEBOLD, DAVID E.
To: MARATHON ASHLAND PETROLEUM LLC
Reel/Frame 016476/0624 →