IP Library Granted Patent US 7,367,177
Granted Patent B2
US 7,367,177 · App. 11/012,953 · Granted May 6, 2008

Combined cycle power plant with auxiliary air-cooled condenser

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,367,177
App. No.
11/012,953
Granted
May 6, 2008
Kind
B2
Abstract

A combined cycle power plant ( 20 ) including a main air-cooled condenser ( 22 ) condensing steam at a first pressure and an auxiliary air-cooled condenser ( 24 ) condensing steam at a second pressure higher than the first pressure. Designing an air-cooled combined cycle power plant for startup on a hot day can significantly increase the size and cost of the required air-cooled condenser. Adding an auxiliary air-cooled condenser having appropriate thermal characteristics relative to a main air cooled compressor to the steam bypass circuit of an air-cooled combined cycle power plant enables the plant to meet plant startup requirements during periods of peak thermal load in a more cost effective manner than would be achievable with the main air cooled condenser alone.

Claims (16)

1. A condenser apparatus for a combined cycle power plant, said apparatus comprising:

a main air-cooled condenser configured to condense steam at a first operating pressure; and

a steam bypass circuit for selectively bypassing steam around a steam turbine of the power plant, the bypass circuit having an auxiliary air-cooled condenser for passing the steam that bypasses the steam turbine, the auxiliary air-cooled condenser coupled to the main air-cooled condenser, said auxiliary condenser configured to condense steam at a second operating pressure higher than said first operating pressure.

2. The condenser apparatus of claim 1 wherein said auxiliary condenser is coupled in parallel flow to said main condenser.

3. The condenser apparatus of claim 1 further comprising a valve for selectively coupling said auxiliary condenser to the main air-cooled condenser.

4. The condenser apparatus of claim 1 wherein said first operating pressure is below one atmosphere of pressure, and said second operating pressure is at least one atmosphere of pressure.

5. The condenser apparatus of claim 1 further comprising a condensate pump connected to pressurize condensate from the main condenser, the auxiliary condenser connected to supply condensate downstream relative to the condensate pump.

6. The condenser apparatus of claim 1 wherein an operating pressure for said main air-cooled condenser ranges from approximately 0.5 psia to approximately 5.0 psia.

7. The condenser apparatus of claim 1 wherein an operating pressure for said auxiliary air-cooled condenser ranges from approximately 30 psia to approximately 100 psia or higher.

8. A combined cycle power plant comprising:

a gas turbine;

a heat-recovery steam generator receiving condensate and exhaust fluid from the gas turbine for producing steam;

a steam turbine selectively receiving the steam from the heat-recovery steam generator;

a main air-cooled condenser receiving the steam from the steam turbine and producing condensate;

a condensate pump for returning the condensate to the heat-recovery steam generator; and

a steam bypass circuit for selectively bypassing steam around the steam turbine, the steam bypass circuit having an auxiliary air-cooled condenser for passing the steam that bypasses the steam turbine, the auxiliary air-cooled condenser connected in parallel to the main air-cooled condenser and configured to operate at a pressure higher than an operating pressure of the main air-cooled condenser.

Assignments (3)
CHANGE OF NAME Recorded Mar 31, 2009
From: SIEMENS POWER GENERATION, INC.
To: SIEMENS ENERGY, INC.
Reel/Frame 022482/0740 →
CHANGE OF NAME Recorded Sep 15, 2005
From: SIEMENS WESTINGHOUSE POWER CORPORATION
To: SIEMENS POWER GENERATION, INC.
Reel/Frame 017000/0120 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 14, 2004
From: BRIESCH, MICHAEL S.
To: SIEMENS WESTINGHOUSE POWER CORP.
Reel/Frame 016103/0415 →