Enhanced manual start/stop sequencing controls for a stream turbine powered chiller unit

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,421,853
App. No.
11/016,113
Granted
Sep 9, 2008
Kind
B2
Abstract

A control system and method for interactive startup and shutdown of a steam turbine driven chiller unit is provided. The chiller unit includes an integrated central control panel to control operation of both the steam turbine system and the refrigerant system. The central control panel has startup control system to assist an operator manually start the steam turbine system and the refrigerant system and a shutdown control system to assist an operator manually shutdown the steam system and the refrigerant system. Both the startup control system and the shutdown control system include logic for performing necessary protective actions and for notifying an operator when to perform required actions.

Claims (51)

1. A method of manually staffing a chiller system driven by a steam turbine, the method comprising:

manually entering, by an operator, a start command into a control panel of the chiller system to initiate a steam turbine staff sequence;

executing the steam turbine start sequence, wherein executing the steam turbine staff sequence comprises:

performing a steam turbine vibration sensor verification; and

initiating a pre-lubrication of the steam turbine and a compressor of the chiller system;

selecting a hotwell pump from a plurality of hotwell pumps for operation; and

starting the selected hotwell pump upon completion of the pre-lubrication of the steam turbine and the compressor;

prompting the operator to enter a slow roll command upon completion of the steam turbine staff sequence to initiate a steam turbine slow roll mode operation;

executing the steam turbine slow roll mode operation in response to entry of the slow roll command by the operator;

prompting the operator to enter an acceleration command upon completion of the steam turbine slow roll mode operation to initiate a steam turbine acceleration process; and

executing the steam turbine acceleration process to accelerate the steam turbine to an operational speed in response to entry of the acceleration command by the operator.

2. The method of claim 1 further comprising the steps of:

determining an elapsed time for the step of prompting the operator to enter a slow roll command without having received entry of the slow roll command by the operator;

comparing the elapsed time to a predetermined time period; and

shutting down the steam turbine in response to the elapsed time being greater than the predetermined time period; and

displaying a message to the operator indicating a shutdown of the steam turbine.

3. The method of claim 1 further comprising the steps of:

determining an elapsed time for the step of prompting the operator to enter an acceleration command without having received entry of the acceleration command by the operator;

comparing the elapsed time to a predetermined time period;

shutting down the steam turbine in response to the elapsed time being greater than the predetermined time period; and

displaying a message to the operator indicating a shutdown of the steam turbine.

4. The method of claim 1 further comprising the step of displaying messages to the operator indicating a current status of the chiller system.

5. The method of claim 1 wherein the step of executing the steam turbine acceleration process includes the step of increasing the speed of the steam turbine from a preselected starting speed to the operational speed.

6. The method of claim 5 wherein the step of executing the steam turbine acceleration process further includes the steps of:

monitoring a speed of the steam turbine;

comparing the monitored speed of the steam turbine to a predetermined threshold speed; and

shutting down the steam turbine in response to the speed of the steam turbine being less than the predetermined threshold speed for a predetermined amount of time.

7. The method of claim 6 wherein the predetermined threshold speed is the operational speed, the predetermined amount of time is about 17 seconds, and the preselected starting speed is about 2000 rpm.

8. The method of claim 5 wherein the step of executing the steam turbine acceleration process further includes the steps of:

monitoring a speed of the steam turbine in response to the speed of the steam turbine exceeding the operational speed;

comparing the monitored speed of the steam turbine to a predetermined threshold speed; and

shutting down the steam turbine in response to the speed of the steam turbine being less than the predetermined threshold speed for a predetermined amount of time.

9. The method of claim 8 wherein the predetermined amount of time is about 10 seconds, and the predetermined threshold speed is the operational speed minus about 100 rpm.

10. The method of claim 5 further comprising the step of opening, by the operator, a main steam inlet block valve to increase the speed of the steam turbine.

11. The method of claim 1 further comprising the step of opening a steam inlet slow roll bypass valve, by the operator, prior to executing the slow roll mode operation to permit a predetermined amount of steam to enter the steam turbine.

12. The method of claim 1 further comprising the steps of:

verifying that a speed of the steam turbine is greater than a predetermined threshold speed for a predetermined amount of time upon completion of the steam turbine acceleration process; and

executing capacity control logic in response to the speed of the steam turbine being greater than the predetermined threshold speed for the predetermined amount of time.

13. The method of claim 12 wherein the predetermined threshold speed is the operational speed minus about 100 rpm and the predetermined amount of time is about 120 seconds.

14. A method of manually staffing a chiller system driven by a steam turbine, the method comprising:

manually entering, by an operator, a start command into a control panel of the chiller system to initiate a steam turbine staff sequence;

executing the steam turbine staff sequence;

prompting the operator to enter a slow roll command upon completion of the steam turbine staff sequence to initiate a steam turbine slow roll mode operation;

executing the steam turbine slow roll mode operation in response to entry of the slow roll command by the operator, wherein executing the steam turbine slow roll mode operation comprises:

calculating a slow roll time period for the slow roll mode operation, wherein the slow roll time period is dependent upon a number of stages of the steam turbine and an inlet steam temperature to the steam turbine; and

evacuating the steam turbine exhaust to a desired vacuum in response to the slow roll time period expiring;

prompting the operator to enter an acceleration command upon completion of the steam turbine slow roll mode operation to initiate a steam turbine acceleration process; and

executing the steam turbine acceleration process to accelerate the steam turbine to an operational speed in response to entry of the acceleration command by the operator.

15. The method of claim 14 wherein the step of evacuating the steam turbine exhaust includes the steps of:

starting a vacuum pump, wherein the vacuum pump is configured to reduce a steam turbine outlet pressure; and

closing, by the operator, a steam turbine casing drain valve, the steam turbine casing drain valve configured to permit condensate to drain from the steam turbine in an open position.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 28, 2025
From: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
To: TYCO FIRE & SECURITY GMBH
Reel/Frame 072275/0058 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 4, 2022
From: YORK INTERNATIONAL CORPORATION
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058956/0981 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 22, 2021
From: YORK INTERNATIONAL CORPORATION
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058562/0695 →