IP Library Granted Patent US 7,193,175
Granted Patent B1
US 7,193,175 · App. 11/040,588 · Granted Mar 20, 2007

High precision, rapid laser hole drilling

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,193,175
App. No.
11/040,588
Granted
Mar 20, 2007
Kind
B1
Abstract

A laser system produces a first laser beam for rapidly removing the bulk of material in an area to form a ragged hole. The laser system produces a second laser beam for accurately cleaning up the ragged hole so that the final hole has dimensions of high precision.

Claims (8)

1. A method of drilling a final hole in a first material, wherein said first material has a back side and wherein a second material is located abutting said back side, comprising the steps of:

generating a first laser beam,

directing said first laser beam at said first material to remove the bulk of material in an area to form a ragged hole and begin forming said hole,

controlling said first laser beam for rapidly removing the bulk of material in an area to form said ragged hole so that said ragged hole does not extend through said first material to said back side of said first material and does not reach said second material located abutting said back side,

controlling said first laser beam so that the said ragged hole does not extend through said first material and said first laser beam leaves a thin membrane extending entirely across the bottom of said ragged hole adjacent said back side,

generating a second laser beam,

directing said second laser beam at said hole being formed for accurately cleaning up said ragged hole so that said hole has dimensions of high precision, and

controlling said second laser beam so that said second laser beam breaks through said thin membrane at the bottom of said hole opening said hole to said second material located abutting said back side of said first material and forming said final hole.

Assignments (1)
CONFIRMATORY LICENSE Recorded Sep 24, 2013
From: LAWRENCE LIVERMORE NATIONAL SECURITY, LLC
To: U.S. DEPARTMENT OF ENERGY
Reel/Frame 031264/0610 →