IP Library Granted Patent US 7,347,204
Granted Patent B1
US 7,347,204 · App. 11/042,622 · Granted Mar 25, 2008

Breathing air system for a facility

Assignee: Total Safety US, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,347,204
App. No.
11/042,622
Granted
Mar 25, 2008
Kind
B1
Abstract

The breathing air system is made of a pressurized breathing air source, a continuous loop air conduit connected to the pressurized breathing air source for maintaining the breathing air at a defined pressure, a first isolation valve located between the pressurized breathing air source and the continuous loop air conduit, a first splitter is located between the first isolation valve and the continuous loop air conduit, a second splitter is connected to the continuous loop air conduit, a first auxiliary air conduit segment is connected to the second splitter, a second isolation valve connects to the first auxiliary air conduit segment, a reserve manifold is also used and a second auxiliary air conduit segment communicates between the second isolation valve and the reserve manifold to distribute breathing air to at least one reserve manifold from at least two directions wherein the breathing air is grade “D” or better.

Claims (61)

1. A breathing air system comprising:

a. a pressurized breathing air source;

b. an air conduit connected to the pressurized breathing air source;

c. a first valve disposed between the pressurized breathing air source and the air conduit;

d. a first splitter disposed between the first valve and the air conduit;

e. a second splitter connected to the air conduit;

f. a first auxiliary air conduit segment connected to the second splitter;

g. a second valve connected to the first auxiliary air conduit segment;

h. at least one manifold; and

i. a second auxiliary air conduit segment communicating between the second valve and the at least one manifold, wherein the breathing air system is adapted to distribute pressurized breathing air to the at least one manifold from two directions, and wherein the manifold is adapted to provide breathing air.

2. The breathing air system of claim 1 , wherein the breathing air source is at least an air quality of a Compressed Gas Association grade “D”.

3. The breathing air system of claim 1 , wherein the pressurized breathing air source is pressured to between 500 psi and 5000 psi.

4. The breathing system of claim 3 , wherein the pressurized breathing air source is pressured to between 2400 psi and 5000 psi.

5. The breathing air system of claim 1 , wherein the air conduit is a continuous loop.

6. The breathing air system of claim 1 , wherein the air conduit is pipe, tubing, hose or combinations thereof.

7. The breathing air system of claim 6 , wherein the tubing is stainless steel.

8. The breathing air system of claim 1 , wherein the first valve is an isolation valve.

9. The breathing air system of claim 8 , wherein the isolation valve is a high pressure ball valves.

10. The breathing air system of claim 1 , wherein the splitters are a T-block with an inner diameter between ¼ inch and 3 inches.

11. The breathing system of claim 1 , wherein the manifold comprises a corrosion resistant metal.

12. The breathing air system of claim 1 , wherein the manifold comprises:

a. a manifold body comprising a chamber;

b. at least three take-out connections disposed on the manifold body connected to the chamber;

c. a first plug on one end of the chamber and a second plug on the opposite end of the chamber; and

d. a regulator connected to the chamber for receiving the pressurized breathing air and reducing the pressurized breathing air to a breathable pressure.

13. The breathing air system of claim 12 , wherein the regulator comprises:

a. a regulator body;

b. an inlet port connected to the regulator body and an outlet port connected to the regulator body;

c. an inlet pressure gauge connected to the inlet port and an outlet pressure gauge connected to outlet port;

d. a regulator conduit connected from the outlet port to the manifold body in communication with the chamber;

e. a pressure relief valve connected to the regulator body; and

f. a low pressure warning alarm connected to the inlet port which is adapted to alarm when the air conduit pressure falls below 500 psi.

14. The breathing air system of claim 13 , further comprising a low pressure control valve connected to the regulator body to adjust the pressurized breathing air to a low pressure breathing air.

15. The breathing air system of claim 14 , wherein the low pressure control valve is manually operable.

16. A method for operating an air breathing system comprising the steps of:

a. pressurizing a continuous loop air conduit with breathable air from a pressurized air source, wherein the continuous loop conduit comprises:

i. a first isolation valve disposed between the pressurized air source and the continuous loop air conduit;

ii. a first splitter disposed between the first isolation valve and the continuous loop air conduit;

iii. a second splitter connected to the continuous loop air conduit;

iv. a first auxiliary air conduit segment connected to the second splitter;

v. a second isolation valve connected to the first auxiliary air conduit segment;

vi. a reserve manifold; and

vii. a second auxiliary air conduit segment communicating between the second isolation valve and the reserve manifold; and wherein the breathing air system is adapted to distribute high pressure breathing air to at least one reserve manifold from two direction, and wherein the reserve manifold is adapted to provide breathing air;

b. leak testing the pressurized continuous loop air conduit;

c. setting at least one regulator to a pressure between 60 psi and 125 psi;

d. shutting off the pressurized air source from the pressurized continuous loop air conduit;

e. monitoring the pressure in the continuous loop air conduit for a defined period of time between 5 minutes and 120 minutes while checking for leaks in the system;

f. classifying the air breathing system as commissioned upon passage of the defined period of time and verification that there are no leaks in the system; and

g. locking out and tagging out each isolation valve of the continuous loop air conduit.

17. The method of claim 16 , further comprising the steps of:

a. locking in and tagging in each isolation valve of the continuous loop air conduit;

b. turning on the air at the source; and

c. continuously monitoring the system for changes in pressure.

18. The method of claim 16 , further comprising the steps of:

a. hooking up a low pressure hose to a take-out connection on the reserve manifold by at least one worker; and

b. connecting the low pressure hose to a respirator and breathing air from the reserve manifold.

19. The method of claim 16 , wherein in the event of failure in the continuous loop air conduit, the method further comprises the steps of:

a. sounding a low pressure alarm identifying a location where pressure is less than 500 psi;

b. removing any workers using the system from the continuous loop air conduit at the location where pressure is less than 500 psi

c. closing the isolation valves around the location with pressure less than 500 psi; and

d. inspecting the section of conduit at the location with pressure less than 500 psi while operating the continuous loop air conduit for other workers not at the location with pressure less than 500 psi.

Assignments (23)
RELEASE OF SECURITY INTEREST IN INTELLECTUAL PROPERTY RECORDED AT REEL 050114 FRAME 0019 Recorded Apr 18, 2024
From: GOLDMAN SACHS BANK USA, AS COLLATERAL AGENT
To: TOTAL SAFETY U.S., INC.; TOTAL SAFETY ON-SITE SAFETY SERVICES, INC.
Reel/Frame 067143/0647 →
RELEASE OF SECURITY INTEREST IN INTELLECTUAL PROPERTY RECORDED AT REEL 060712 FRAME 0587 Recorded Apr 18, 2024
From: GOLDMAN SACHS BANK USA, AS COLLATERAL AGENT
To: TOTAL SAFETY U.S., INC.; S & S TOOL & SUPPLY, INC.
Reel/Frame 067143/0658 →
SHORT-FORM PATENTS SECURITY AGREEMENT Recorded Apr 18, 2024
From: TOTAL SAFETY U.S., INC.
To: HPS INVESTMENT PARTNERS, LLC, AS ADMINISTRATIVE AGENT
Reel/Frame 067143/0570 →
SECURITY INTEREST Recorded Aug 3, 2022
From: TOTAL SAFETY U.S., INC.; S & S TOOL & SUPPLY, INC.
To: GOLDMAN SACHS BANK USA, AS COLLATERAL AGENT
Reel/Frame 060712/0587 →
CORRECTIVE ASSIGNMENT TO CORRECT THE CORRECT PROPERTY NUMBER 94923223 TO 8493223 PREVIOUSLY RECORDED AT REEL: 041532 FRAME: 0801. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Mar 21, 2022
From: TOTAL SAFETY U.S., INC.
To: CORTLAND CAPITAL MARKET SERVICES LLC
Reel/Frame 060201/0100 →
CORRECTIVE ASSIGNMENT TO CORRECT THE THIRD PROPERTY NUMBER FROM 9493223 TO 8493223 PREVIOUSLY RECORDED AT REEL: 041507 FRAME: 0838. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY INTEREST. Recorded Mar 21, 2022
From: TOTAL SAFETY U.S., INC.
To: CITIZENS BANK, N.A.
Reel/Frame 059454/0187 →
CORRECTIVE ASSIGNMENT TO CORRECT THE FIFTH PROPERTY NUMBER FROM 9493223 TO 8493223 PREVIOUSLY RECORDED ON REEL 050076 FRAME 0685. ASSIGNOR(S) HEREBY CONFIRMS THE RELEASE OF SECURITY INTEREST. Recorded Mar 21, 2022
From: CORTLAND CAPITAL MARKET SERVICES, LLC
To: TOTAL SAFETY U.S., INC.
Reel/Frame 059454/0458 →
CORRECTIVE ASSIGNMENT TO CORRECT THE THE THIRD APPLICATION NUMBER PREVIOUSLY RECORDED AT REEL: 041532 FRAME: 0801. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Feb 16, 2022
From: TOTAL SAFETY U.S., INC.
To: CORTLAND CAPITAL MARKET SERVICES LLC
Reel/Frame 059126/0567 →
CORRECTIVE ASSIGNMENT TO CORRECT THE CHANGE OF REGISTRATION NO. FROM 9,493,223 TO 8,493,223 PREVIOUSLY RECORDED AT REEL: 041507 FRAME: 0838. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Feb 10, 2022
From: TOTAL SAFETY US.S., INC.
To: CITIZENS BANK, N.A.
Reel/Frame 059001/0985 →
SECURITY INTEREST Recorded Aug 21, 2019
From: TOTAL SAFETY U.S., INC.
To: GOLDMAN SACHS BANK USA, AS COLLATERAL AGENT
Reel/Frame 050114/0019 →
RELEASE OF SECURITY INTEREST Recorded Aug 16, 2019
From: CORTLAND CAPITAL MARKET SERVICES, LLC
To: TOTAL SAFETY U.S., INC.
Reel/Frame 050076/0685 →
FIRST LIEN TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENTS Recorded Mar 9, 2017
From: DEUTSCHE BANK TRUST COMPANY AMERICAS
To: TOTAL SAFETY U.S., INC.
Reel/Frame 041925/0557 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENTS Recorded Mar 9, 2017
From: DEUTSCHE BANK TRUST COMPANY AMERICAS
To: TOTAL SAFETY U.S., INC.
Reel/Frame 041925/0565 →
SECOND LIEN TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENTS Recorded Mar 9, 2017
From: DEUTSCHE BANK TRUST COMPANY AMERICAS
To: TOTAL SAFETY U.S., INC.
Reel/Frame 041925/0553 →
SECURITY INTEREST Recorded Mar 9, 2017
From: TOTAL SAFETY U.S., INC.
To: CORTLAND CAPITAL MARKET SERVICES LLC
Reel/Frame 041532/0801 →
SECURITY INTEREST Recorded Mar 8, 2017
From: TOTAL SAFETY U.S., INC.
To: CITIZENS BANK, N.A.
Reel/Frame 041507/0838 →
PATENT SECURITY AGREEMENT Recorded Sep 2, 2015
From: TOTAL SAFETY U.S., INC.
To: DEUTSCHE BANK TRUST COMPANY AMERICAS, AS AGENT
Reel/Frame 036527/0111 →
SECURITY AGREEMENT Recorded Mar 14, 2013
From: TOTAL SAFETY U.S., INC.
To: DEUTSCHE BANK TRUST COMPANY AMERICAS
Reel/Frame 030003/0668 →
SECOND LIEN SECURITY AGREEMENT Recorded Mar 14, 2013
From: TOTAL SAFETY U.S., INC.
To: DEUTSCHE BANK TRUST COMPANY AMERICAS
Reel/Frame 030003/0693 →
TERMINATION AND RELEASE OF SECURITY INTEREST Recorded Mar 14, 2013
From: DEUTSCHE BANK TRUST COMPANY AMERICAS
To: TOTAL SAFETY U.S., INC.
Reel/Frame 030003/0659 →
SECURITY AGREEMENT Recorded Nov 2, 2011
From: TOTAL SAFETY U.S., INC.
To: DEUTSCHE BANK TRUST COMPANY AMERICAS
Reel/Frame 027165/0840 →
CORRECTIVE ASSIGNMENT TO CORRECT THE LEGAL NAME OF THE ASSIGNEE PREVIOUSLY RECORDED ON REEL 016111 FRAME 0990. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNEE'S NAME IS TOTAL SAFETY US, INC. Recorded Jan 4, 2008
From: LINDSEY, RICKEY FLOYD; JOHNSON, JERRY PAUL
To: TOTAL SAFETY US, INC.
Reel/Frame 020321/0944 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 20, 2005
From: LINDSEY, RICKEY FLOYD; JOHNSON, JERRY PAUL
To: TOTAL SAFETY, INC.
Reel/Frame 016111/0990 →
Continuity (2)
Provisional Application 6054051600 · Jan 29, 2004
Provisional Application 6054023100 · Jan 29, 2004