IP Library Granted Patent US 7,114,577
Granted Patent B2
US 7,114,577 · App. 11/066,576 · Granted Oct 3, 2006

Safemode operating system for a drilling or service rig

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,114,577
App. No.
11/066,576
Granted
Oct 3, 2006
Kind
B2
Abstract

Disclosed herein is a system designed to manage or slow the block travel speed down to safe speeds when the rig is operating in a light load/high speed condition. The system monitors and controls engine torque and horsepower, providing the minimum amount of each necessary to pull the light load out of the hold without providing sufficient excess torque to pull the load through a snag.

Claims (32)

1. A method for preventing a light load catastrophic event on an oil rig comprising:

specifying a minimum hook load weight,

monitoring the hook load weight,

limiting the engine horsepower supplied to power the oil rig hoist to only the needed amount of torque necessary to pull tubulars from a well once the hook load weight falls below the specified minimum hook load weight.

2. The method of claim 1 , wherein the engine horsepower is limited using a digital torque limiting process.

3. The method of claim 1 , wherein the hook load weight monitoring and engine horsepower limiting steps are done manually.

4. The method of claim 1 , wherein the hook load weight monitoring and engine horsepower limiting steps are done automatically.

5. The method of claim 1 , wherein the engine horsepower limiting step is accomplished by reducing fuel flow to the engine.

6. The method of claim 1 , wherein the oil rig is a drilling rig or a well service rig.

7. A method for preventing a light load catastrophic event on an oil rig comprising:

specifying a minimum hook load weight,

monitoring the hook load weight,

reducing the pressure applied to the drum clutch bladder once the hook load weight falls below the specified minimum hook load weight.

8. The method of claim 7 , wherein the hook load weight monitoring and drum clutch bladder pressure reduction steps are done manually.

9. The method of claim 7 , wherein the hook load weight monitoring and engine horsepower limiting steps are done automatically.

10. The method of claim 7 , wherein the oil rig is a drilling rig or a well service rig.

11. A method for preventing a light load catastrophic event on an oil rig comprising:

specifying a minimum hook load weight,

monitoring the hook load weight,

introducing slippage into the oil rig torque converter once the hook load weight falls below the specified minimum hook load weight.

12. The method of claim 11 , wherein slippage is introduced into the torque converter by keeping the torque converter out of lock up mode.

13. The method of claim 12 , wherein the torque converter is kept out of lock up mode by relieving the fluid pressure from the oil rig engine driven turbine pump.

14. The method of claim 11 , wherein the hook load weight monitoring and introducing slippage into the oil rig torque converter steps are done manually.

15. The method of claim 11 , wherein the hook load weight monitoring and introducing slippage into the oil rig torque converter steps are done automatically.

16. The method of claim 11 , wherein the oil rig is a drilling rig or a well service rig.

17. A method for preventing a light load catastrophic event on an oil rig comprising:

specifying a minimum hook load weight,

monitoring the hook load weight,

limiting the engine horsepower supplied to power the oil rig hoist to only the needed amount of torque necessary to pull tubulars from a well once the hook load weight falls below the specified minimum hook load weight,

reducing the pressure applied to the drum clutch bladder once the hook load weight falls below the specified minimum hook load weight, and

introducing slippage into the oil rig torque converter once the hook load weight falls below the specified minimum hook load weight.

18. The method of claim 17 , wherein the oil rig is a drilling rig or a well service rig.

Assignments (14)
RELEASE OF SECURITY INTEREST Recorded Dec 16, 2016
From: CORTLAND CAPITAL MARKET SERVICES LLC
To: KEY ENERGY SERVICES, LLC
Reel/Frame 040996/0899 →
SECURITY INTEREST Recorded Dec 15, 2016
From: KEY ENERGY SERVICES, LLC
To: CORTLAND PRODUCTS CORP., AS AGENT
Reel/Frame 040965/0383 →
SECURITY INTEREST Recorded Dec 15, 2016
From: KEY ENERGY SERVICES, LLC
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 040989/0070 →
RELEASE OF SECURITY INTEREST Recorded Dec 15, 2016
From: BANK OF AMERICA, N.A.
To: KEY ENERGY SERVICES, LLC
Reel/Frame 040995/0825 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 13, 2016
From: NEWMAN, FREDERIC M.
To: KEY ENERGY SERVICES, INC
Reel/Frame 038270/0643 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNOR NAME PREVIOUSLY RECORDED AT REEL: 035814 FRAME: 0158. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY INTEREST. Recorded Aug 6, 2015
From: KEY ENERGY SERVICES, LLC
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 036284/0840 →
SECURITY INTEREST Recorded Jun 2, 2015
From: KEYSTONE ENERGY SERVICES, LLC
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 035814/0158 →
SECURITY INTEREST Recorded Jun 1, 2015
From: KEY ENERGY SERVICES, LLC
To: CORTLAND CAPITAL MARKET SERVICES LLC, AS AGENT
Reel/Frame 035801/0073 →
RELEASE OF SECURITY INTEREST Recorded Apr 1, 2011
From: BANK OF AMERICA, N.A.
To: KEY ENERGY SERVICES, INC.
Reel/Frame 026064/0706 →
SECURITY AGREEMENT Recorded Aug 30, 2010
From: KEY ENERGY SERVICES, LLC
To: BANK OF AMERICA, N.A.
Reel/Frame 024906/0588 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 10, 2010
From: KEY ENERGY SERVICES, INC.
To: KEY ENERGY SERVICES, LLC
Reel/Frame 024505/0957 →
SECURITY AGREEMENT Recorded Jan 7, 2008
From: KEY ENERGY SERVICES, INC
To: BANK OF AMERICA, NA
Reel/Frame 020317/0903 →
RELEASE OF SECURITY INTEREST Recorded Jan 7, 2008
From: LEHMAN COMMERCIAL PAPER, INC.
To: KEY ENERGY SERVICES, INC.
Reel/Frame 020325/0209 →
SECURITY AGREEMENT Recorded Aug 22, 2005
From: KEY ENERGY SERVICES, INC.
To: LEHMAN COMMERCIAL PAPER INC., AS COLLATERAL AGENT
Reel/Frame 016427/0646 →